🤖 AI Agent Friendly: This page is available in clean token-optimized Markdown.
View as .md

$DOGE Catalyst Posts

October 02, 2026

Single-day social intelligence recap and verified catalyst posts · ← Back to $DOGE Profile · Market Rankings

Daily Views
454.3K
Daily Likes
13.8K
Daily Posts Tracked
237
Daily Retweets
1.2K
Daily Comments
1.1K

💬 Curated Viral Posts & Community Evidence

239 source posts analyzed
Doge Tipping @Dogetothemoon · 2026-10-02T04:12:55+00:00

Elon Musk: "Instagram is for grils" Meanwhile on 𝕏

DogeDesigner @cb_doge · 2026-10-02T01:49:50+00:00

Accurate

A frustrated businessman on a Delta flight at 35,000 feet holds a pigeon out the window as an alternative messenger while his phone displays "NO INTERNET," humorously illustrating the struggles of trying to send messages with no in-flight Wi-Fi.

AI visual analysis: A frustrated businessman on a Delta flight at 35,000 feet holds a pigeon out the window as an alternative messenger while his phone displays "NO INTERNET," humorously illustrating the struggles of trying to send messages with no in-flight Wi-Fi.

DogeDesigner @cb_doge · 2026-10-02T02:00:19+00:00

A large crowd lines up at a "STARLINK" booth featuring American Airlines, United, and Frontier, while a bored, unenthusiastic woman sits alone at a nearby "DELTA AIR LINES" booth with no customers. The cartoon highlights how Delta is being left out as airlines partner with Starlink for in-flight Wi-Fi.

AI visual analysis: A large crowd lines up at a "STARLINK" booth featuring American Airlines, United, and Frontier, while a bored, unenthusiastic woman sits alone at a nearby "DELTA AIR LINES" booth with no customers. The cartoon highlights how Delta is being left out as airlines partner with Starlink for in-flight Wi-Fi.

ray @moonbag · 2026-10-02T13:18:00+00:00

Once $DOGE flies, so does your memecoins.

A TradingView chart of DOGE/USDT displays a descending channel pattern with candlesticks trending downward toward a labeled price level of $0.42. The image visually supports the post's bullish claim that DOGE's price movement will lift associated memecoins, illustrating the technical setup traders are watching for a potential breakout.

AI visual analysis: A TradingView chart of DOGE/USDT displays a descending channel pattern with candlesticks trending downward toward a labeled price level of $0.42. The image visually supports the post's bullish claim that DOGE's price movement will lift associated memecoins, illustrating the technical setup traders are watching for a potential breakout.

Whale Factor @WhaleFactor · 2026-10-02T06:25:14+00:00

WHALE WATCH :The Q4 setup is looking entirely different than retail thinks. Capital is flowing where the institutional rails are actually being built. Ranked: => $DOGE => $PEPE => $XRP => $AVAX => $ADA => $SOL => $LUNC => $FLOKI Unpopular truth ? XRP is my top pick right

An engaging poll graphic titled "Which one is your favorite?" displays eight popular cryptocurrency tokens (DOGE, PEPE, XRP, AVAX, ADA, SOL, LUNC, FLOKI), each paired with a reaction emoji (heart, thumbs up, laughing, shocked, surprised, heart-eyes, sad, and fire). The image visually supports the post's ranking of cryptocurrencies, prompting followers to vote on their preferred coin amid a discussion about Q4 institutional capital flows, where the author identifies XRP as their top pick.

AI visual analysis: An engaging poll graphic titled "Which one is your favorite?" displays eight popular cryptocurrency tokens (DOGE, PEPE, XRP, AVAX, ADA, SOL, LUNC, FLOKI), each paired with a reaction emoji (heart, thumbs up, laughing, shocked, surprised, heart-eyes, sad, and fire). The image visually supports the post's ranking of cryptocurrencies, prompting followers to vote on their preferred coin amid a discussion about Q4 institutional capital flows, where the author identifies XRP as their top pick.

Whale Factor @WhaleFactor · 2026-10-02T06:05:13+00:00

WHALE WATCH :They laughed when it dipped. They will panic when it breaks out. Look at the targets: => $BTC - $90k => $ETH - $3k => $BNB - $800 => $SOL - $150 => $XRP - $2 => $DOGE - $1 => $LINK - $20 The liquidity shift into alts is happening right in front of

A promotional "WHALE WATCH" graphic featuring a breaching whale and green candlestick chart lists price targets for major cryptocurrencies—BTC $90,000, ETH $3,000, BNB $800, SOL $150, XRP $2, DOGE $1, and LINK $20—declaring "ALT SEASON IS HERE" amid a claimed liquidity shift into altcoins. The image visually reinforces the post's bullish breakout thesis with its upward green arrow and whale imagery symbolizing large investor accumulation.

AI visual analysis: A promotional "WHALE WATCH" graphic featuring a breaching whale and green candlestick chart lists price targets for major cryptocurrencies—BTC $90,000, ETH $3,000, BNB $800, SOL $150, XRP $2, DOGE $1, and LINK $20—declaring "ALT SEASON IS HERE" amid a claimed liquidity shift into altcoins. The image visually reinforces the post's bullish breakout thesis with its upward green arrow and whale imagery symbolizing large investor accumulation.

Sjuul | AltCryptoGems @AltCryptoGems · 2026-10-02T07:56:31+00:00

If @Dogecoin , a picture of a dog, can hit an ATH market cap of $88.79 billion… Surely @SuiNetwork could do the same? No picture of a dog, but the tech is there! Currently, that’s around an 18x move from where $SUI is now… It’s far off, but it’s not out of reach, anon.

A graphic titled "Market Cap Compare" shows a side-by-side comparison of the Sui Network ($SUI) logo and the Dogecoin ($DOGE) logo with an arrow pointing from SUI to Dogecoin. The bottom panel displays stats: Price Change of 18.23x, SUI Price at $21.51, and a target Market Cap of $88.79B (Dogecoin's ATH), sourced from @MarketCapOf.

AI visual analysis: A graphic titled "Market Cap Compare" shows a side-by-side comparison of the Sui Network ($SUI) logo and the Dogecoin ($DOGE) logo with an arrow pointing from SUI to Dogecoin. The bottom panel displays stats: Price Change of 18.23x, SUI Price at $21.51, and a target Market Cap of $88.79B (Dogecoin's ATH), sourced from @MarketCapOf.

DogeOS @DogeOS · 2026-10-02T14:01:17+00:00

These nerds hit us up about cooking on Dogecoin, something about a colour and a rock? 100 doge to the first person who guesses

Cryptic @Cryptic_Web3 · 2026-10-02T14:16:25+00:00

LATEST: @dogecoin is getting its own programmable application layer. @DogeOS is now live on the public testnet, bringing EVM-compatible smart contracts, DeFi, and consumer apps to DOGE. Dogecoin does not natively support complex apps like DEXs or lending protocols. DogeOS

A promotional graphic from Cryptic announces "DogeOS Launches EVM Compatible Testnet for DeFi and Apps on Dogecoin," featuring a Rubik's cube-style arrangement of cubes labeled "test" and "net" topped with Shiba Inu dog faces, visually representing the testnet launch mentioned in the post about bringing smart contract functionality to Dogecoin.

AI visual analysis: A promotional graphic from Cryptic announces "DogeOS Launches EVM Compatible Testnet for DeFi and Apps on Dogecoin," featuring a Rubik's cube-style arrangement of cubes labeled "test" and "net" topped with Shiba Inu dog faces, visually representing the testnet launch mentioned in the post about bringing smart contract functionality to Dogecoin.

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T04:00:01+00:00

Elon Musk co-leads the Pentagon’s Project Meridian study on the future of warfare.

CoinGecko @coingecko · 2026-10-02T07:06:33+00:00

$DOGE vs. $NKE if you held for the past 5 years.

This Coingecko comparison chart shows that holding Dogecoin ($DOGE) for 5 years (Oct 2021 to Oct 2026) would result in a -57% loss ($0.223 → $0.096), while holding Nike ($NKE) over the same period would be even worse at -76% ($149.60 → $35.22), illustrating how both assets have significantly declined from their 5-year-ago prices.

AI visual analysis: This Coingecko comparison chart shows that holding Dogecoin ($DOGE) for 5 years (Oct 2021 to Oct 2026) would result in a -57% loss ($0.223 → $0.096), while holding Nike ($NKE) over the same period would be even worse at -76% ($149.60 → $35.22), illustrating how both assets have significantly declined from their 5-year-ago prices.

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T10:12:45+00:00

Crypto has spent years inventing increasingly elaborate reasons for coins to exist. The beauty of Dogecoin is fast, cheap, decentralized peer-to-peer money with a dog on it. There’s something beautifully ironic about a coin created as a joke ending up becoming global currency.

amrOnChain @amr_nannaware · 2026-10-02T09:17:57+00:00

PIONEERS — Ever wondered how Pi's community size stacks up against the biggest names in crypto? Here's the X (Twitter) follower comparison: Bitcoin: 8.9M Dogecoin: 4.39M Ethereum: 4.5M Pi Network: 4.25M XRP: 3.19M Shiba Inu: 3.8M Solana: 2.1M

The image shows the official Pi Network X (Twitter) account (@PiCoreTeam) verified with a gold checkmark, displaying 4.2M followers, 2 Following, and 2 Affiliates, based in Palo Alto, California. The post highlights Pi Network's substantial community size, with 4.25M followers rivaling major cryptocurrencies like Ethereum (4.5M) and Dogecoin (4.39M) while surpassing XRP, Shiba Inu, and Solana.

AI visual analysis: The image shows the official Pi Network X (Twitter) account (@PiCoreTeam) verified with a gold checkmark, displaying 4.2M followers, 2 Following, and 2 Affiliates, based in Palo Alto, California. The post highlights Pi Network's substantial community size, with 4.25M followers rivaling major cryptocurrencies like Ethereum (4.5M) and Dogecoin (4.39M) while surpassing XRP, Shiba Inu, and Solana.

Doge2020Hodl86 @reddit · 2026-10-02T01:45:06.430000+00:00

Day 184 Posting Until Doge 1$

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T16:07:38+00:00

Doge is for everyone

PTSD @ptsdshow · 2026-10-02T12:47:57+00:00

They rugged me three times. Said they were filtering bots. Doge said, “You’re not early. You just got rugged three times.” Anyway, got the fourth CA. This one feels different.

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T23:06:01+00:00

$DOGE is down

The image is a two-panel "Family Guy" meme featuring Quagmire and Peter Griffin at a bar. In the top panel, Quagmire says "Dogecoin is down," and in the bottom panel, Peter angrily responds, "Who the fuck starts a conversation like that? I just sat down!" The meme humorously captures the post's announcement that $DOGE is down, with Peter's frustration symbolizing investors' irritation at negative crypto news.

AI visual analysis: The image is a two-panel "Family Guy" meme featuring Quagmire and Peter Griffin at a bar. In the top panel, Quagmire says "Dogecoin is down," and in the bottom panel, Peter angrily responds, "Who the fuck starts a conversation like that? I just sat down!" The meme humorously captures the post's announcement that $DOGE is down, with Peter's frustration symbolizing investors' irritation at negative crypto news.

Lunc Community @Pi_Community0 · 2026-10-02T04:51:40+00:00

#ALTSEASON 2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $BNB to $5000 $XRP to $10 $DOGE to $1 $SHIB to $0.5 $PEPE to $0.1 $XLM to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 #bitcoin #sol #eth

BSCN @BSCNews · 2026-10-02T16:25:00+00:00

Want to trade leveraged $XRP , $DOGE , $LINK , and hundreds more through the best UI in perps trading...? Join @OhayoGlobal today. Sign up now:

Ready, Steady, Go @0xReadySteadyGo · 2026-10-02T00:20:54+00:00

EVERY SINGLE DAY I see a new post on r/SPX6900 from a new holder. They are mostly new to crypto and not traders. We are tapping into a blue ocean market and winning. This is why $BTC $DOGE and $GME went uniquely big… because of Reddit.

A new user introduces themselves on r/spx6900, noting they're new to crypto and recently bought some $SPX tokens, asking if NFT ownership is required to join the community. The post highlights how SPX6900 is attracting crypto newcomers on Reddit, similar to how $BTC, $DOGE, and $GME gained popularity through the platform.

AI visual analysis: A new user introduces themselves on r/spx6900, noting they're new to crypto and recently bought some $SPX tokens, asking if NFT ownership is required to join the community. The post highlights how SPX6900 is attracting crypto newcomers on Reddit, similar to how $BTC, $DOGE, and $GME gained popularity through the platform.

Hailey LUNC XRP @TheMoonHailey · 2026-10-02T05:49:37+00:00

#ALTSEASON 2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $BNB to $5000 $SOL to $1000 $XRP to $10 $DOGE to $1 $SHIB to $0.5 $PEPE to $0.1 $XLM to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 $BABYDOGE to $0.002

A website homepage featuring the text 'Real Utility for People and the Planet' with a green chatbot and yellow highlight elements.

AI visual analysis: A website homepage featuring the text 'Real Utility for People and the Planet' with a green chatbot and yellow highlight elements.

LBank.com @LBank_Exchange · 2026-10-02T10:01:08+00:00

43,500 USDT in Futures bonuses. Here’s the breakdown. Trade $XRP , $ZEC , $NEAR , $SUI , $ADA , $DOGE , $MUBARAK, $PEPE , $USELESS and $WIF . New users can unlock 5 USDT after reaching 1,000 USDT in cumulative Futures volume, while all users can climb the weekly volume tiers for up

LBank's "Hot Coin Boost Week" promotion offers 43,500 USDT in Futures bonuses, featuring a 5 USDT gift for new users upon reaching 1,000 USDT in volume and up to 100 USDT in volume rewards for all users trading pairs like XRP, ZEC, NEAR, SUI, ADA, DOGE, MUBARAK, PEPE, USELESS, and WIF from October 2-8, 2026.

AI visual analysis: LBank's "Hot Coin Boost Week" promotion offers 43,500 USDT in Futures bonuses, featuring a 5 USDT gift for new users upon reaching 1,000 USDT in volume and up to 100 USDT in volume rewards for all users trading pairs like XRP, ZEC, NEAR, SUI, ADA, DOGE, MUBARAK, PEPE, USELESS, and WIF from October 2-8, 2026.

SilverBulletBTC @SilverBulletBTC · 2026-10-02T11:27:04+00:00

$DOGE HTF falling wedge breakout I added to my long term bag

A TradingView weekly candlestick chart of DOGE/USD on Coinbase shows the cryptocurrency breaking out of a large descending wedge pattern, with trendlines converging from the November high near $0.45 down to current levels around $0.06-$0.07, confirming the poster's HTF falling wedge breakout thesis used to justify adding to a long-term position.

AI visual analysis: A TradingView weekly candlestick chart of DOGE/USD on Coinbase shows the cryptocurrency breaking out of a large descending wedge pattern, with trendlines converging from the November high near $0.45 down to current levels around $0.06-$0.07, confirming the poster's HTF falling wedge breakout thesis used to justify adding to a long-term position.

Dogecoin Rise @DogecoinRise · 2026-10-02T14:08:17+00:00

wood fired. diamond handed. $DOGE

A Shiba Inu dog peeks out from a wood-fired pizza oven beside a freshly baked Margherita pizza topped with a cute Shiba Inu face and fresh basil leaves. The image captures the playful spirit of "diamond handed" Doge crypto culture, with the wood-fired pizza symbolizing the fiery conviction of long-term crypto holders and the Shiba Inu representing the $DOGE meme token itself.

AI visual analysis: A Shiba Inu dog peeks out from a wood-fired pizza oven beside a freshly baked Margherita pizza topped with a cute Shiba Inu face and fresh basil leaves. The image captures the playful spirit of "diamond handed" Doge crypto culture, with the wood-fired pizza symbolizing the fiery conviction of long-term crypto holders and the Shiba Inu representing the $DOGE meme token itself.

BSCN @BSCNews · 2026-10-02T09:16:27+00:00

Dogecoin Perps Land On U.S. Regulated Market Kalshi has launched fully regulated perpetual $DOGE futures, giving U.S. retail traders access to onshore contracts. The launch offers an alternative to fixed term futures and offshore platforms previously used by American

Laika - Doge Super App @LaikaSuperApp · 2026-10-02T15:00:00+00:00

DOGETOBER

CEO @Investments_CEO · 2026-10-02T16:27:50+00:00

JUST IN: Dogecoin whales purchased over 545,000,000 $DOGE in the last 24 hours.

A majestic humpback whale leaps from a wave beneath a crescent moon, its body marked with the Dogecoin "Ð" symbol, visually representing the massive $DOGE accumulation of over 545 million coins in just 24 hours by crypto whales.

AI visual analysis: A majestic humpback whale leaps from a wave beneath a crescent moon, its body marked with the Dogecoin "Ð" symbol, visually representing the massive $DOGE accumulation of over 545 million coins in just 24 hours by crypto whales.

Sirius @DogestarOnRH · 2026-10-02T21:34:41+00:00

Things are getting Sirius Vlad

A stylized VHS-style movie poster parody featuring "Vlad Tenev" alongside a Shiba Inu dog wearing sunglasses, both holding guns amid an action-movie scene with explosions, helicopters, and a city skyline. The title "GETTING SIRIUS" is prominently displayed, with the tagline "DIFFERENT SPECIES SAME DESTINATION" and "ONE STARTED THE LORE. ONE BECAME IT," tying into the post's "Things are getting Sirius Vlad" pun on Robinhood CEO Vlad Tenev and the meme coin SIRIUS.

AI visual analysis: A stylized VHS-style movie poster parody featuring "Vlad Tenev" alongside a Shiba Inu dog wearing sunglasses, both holding guns amid an action-movie scene with explosions, helicopters, and a city skyline. The title "GETTING SIRIUS" is prominently displayed, with the tagline "DIFFERENT SPECIES SAME DESTINATION" and "ONE STARTED THE LORE. ONE BECAME IT," tying into the post's "Things are getting Sirius Vlad" pun on Robinhood CEO Vlad Tenev and the meme coin SIRIUS.

TroubleLow3825 @reddit · 2026-10-02T15:36:07.099000+00:00

$PEP is your next 1000x gem $PEP is a frog themed memeCOIN (NOT TOKEN!) with its own blockchain. It's simply better and has better use cases than all the other pepe themed tokens. A lot of people already use it as it has cheap transaction fees, it's merge mineable with DOGE and LTC, you can mint NFTs on it etc etc. It's a whole ecosystem not just a token made for pump and dump. The project has been around since January of 2024 and the devs are still working on it and delivering just like they did from day one. It's a legit crypto project and community just like DOGE was in It's early days.

Ben @BenX_HQ · 2026-10-02T18:45:32+00:00

Today's top crypto stories 1. @Kalshi launches CFTC-regulated $DOGE perpetual futures 2. @Ripple returns 700M $XRP , worth $1.05B, to escrow 3. Fiserv goes live with Roughrider Coin on @solana $SOL 4. Absa launches Africa's first bank-grade crypto custody 5. @avax builders

Odd_Stick_3042 @reddit · 2026-10-02T06:58:44.084000+00:00

Posting until DOGE hits $1 - day 160 Today is the day.

BuildrJ @BuildrJ · 2026-10-02T15:53:46+00:00

There has been almost 9000 posts about @DogeOS in the last day and a bit. Not a single dollar spent on this announcement. Dogecoin will be a household name and nothing will stop us

A post header titled "Today's News" displays "DogeOS Launches Public Testnet for Dogecoin App Builders" with 8.6K posts from 1 day ago. The accompanying caption highlights the impressive organic reach of nearly 9,000 posts about @DogeOS with zero marketing spend, emphasizing Dogecoin's grassroots momentum.

AI visual analysis: A post header titled "Today's News" displays "DogeOS Launches Public Testnet for Dogecoin App Builders" with 8.6K posts from 1 day ago. The accompanying caption highlights the impressive organic reach of nearly 9,000 posts about @DogeOS with zero marketing spend, emphasizing Dogecoin's grassroots momentum.

Tesla Model Doge @TeslaModelDoge · 2026-10-02T05:03:50+00:00

$DOGE is destined to be between $1 and $4.20

BigDott Crypto @BigDott_Sidra · 2026-10-02T05:53:09+00:00

Which of One Will Happen First ? $BTC : $125,000 $ETH : $7,000 $BNB : $1,000 $SOL : $400 $TRUMP : $50 $CORE : $10 $DOT : $80 $DOGE : $1 $APT : $30 $ICE : $0.05 $SUI : $8 $XRP : $4 $ADA : $2 $PI : $5 $SHIB : $0.001 Your Thoughts

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T21:36:00+00:00

I’m scared

Whale Satoshi @WhaleSatoshi · 2026-10-02T17:26:45+00:00

#memecoin will explode $PEPE $0.001-$0.95 $SHIBA $0.1-$1 $DOGE $1-$10 $DOG $0.002-$0.095 In this 2026

Doginal Dogs Sales Bot @DDSalesBot · 2026-10-02T02:08:37+00:00

New @doginaldogs sale! Doginal Dog #3557 165000 DOGE ($15523 USD) market.doginaldogs.com/inscription/35 …

A pixel art illustration of a brown dog wearing a blue and yellow hat against a solid pink background.

AI visual analysis: A pixel art illustration of a brown dog wearing a blue and yellow hat against a solid pink background.

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T22:02:57+00:00

With some Spanish people and they can’t stop saying SI. Very bullish on the future of Spanish tech!

Lunc Community @Pi_Community0 · 2026-10-02T08:03:55+00:00

In the coming months Crypto will explode $LUNC - $1 $SHIB - $1 $WKC - $0.0008 $FLOKI - $3 $BabyDoge - $0.00007 $DOGE - $15 $PEPE - $0.95 Missing any?? Comment your ticker

Pi COMMUNITY @Sharkcommunityy · 2026-10-02T04:49:32+00:00

#ALTSEASON 2026/2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $BNB to $5000 $SOL to $1000 $XRP to $10 $DOGE to $1 $SHIBA to $0.5 $PEPE to $0.1 $WKC to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 $BABYDOGE to $0.002

John Kahlooni Fans @JFKFans12345 · 2026-10-02T02:56:42+00:00

YESTERDAY: I asked Elizabeth Warren HOW she achieved a $12M net worth on a $200K salary, prompting a reply from Elon inquiring as well TODAY: @ElonMusk announces in the Oval Office DOGE will be investigating public officials with high net worths and low pay

JayPee @Mr_jay_pee · 2026-10-02T18:48:15+00:00

Many of us started our web3 journey in 2018 and not so long we made hundred of dollars from Memecoins like Shiba and Dogs. I just pity those that are joining web3 this year. Nothing to make sharp ordinary $10k in the space with little to no liquidity.

Gate Launch @Gate_Launch · 2026-10-02T06:00:31+00:00

What can you trade on Gate Event Contracts — and on which cycles? Crypto: BTC, ETH, SOL, XRP, DOGE, HYPE, BNB Stocks: MU, SNDK, SKHYNIX, Unitree Cycles: 5 min / 15 min / 1 hour / 4 hours; stock instruments use 5- and 15-minute cycles Just call the direction —

A Gate.io promotional graphic for Event Contracts highlights trading across both Crypto (BTC, ETH, SOL, XRP, DOGE, HYPE, BNB) and Stock (MU/Micron, SNDK/SanDisk, SK Hynix, Unitree Robotics) sectors on 5/15 min and 1/4 hour short-term markets, with a minimum entry of $5 USD, no leverage, and 24/7 round-the-clock trading — directly summarizing the post's breakdown of available tickers and contract cycles.

AI visual analysis: A Gate.io promotional graphic for Event Contracts highlights trading across both Crypto (BTC, ETH, SOL, XRP, DOGE, HYPE, BNB) and Stock (MU/Micron, SNDK/SanDisk, SK Hynix, Unitree Robotics) sectors on 5/15 min and 1/4 hour short-term markets, with a minimum entry of $5 USD, no leverage, and 24/7 round-the-clock trading — directly summarizing the post's breakdown of available tickers and contract cycles.

atareh @atareh · 2026-10-02T10:32:56+00:00

when Kabuso, the Doge Dog died on May 24 2024, 203 tokens were launched about this event on @Pumpfun thelibraryofpump.fun

The image shows "The Library of Pump" interface highlighting Moment 16 from May 24, 2024, titled "Kabosu, the Doge Dog, Dies," featuring a photo of the Shiba Inu and noting that 203 tokens were launched about the event between May 22-25, matching the post about Kabosu's passing and the 203 tokens launched on @Pumpfun.

AI visual analysis: The image shows "The Library of Pump" interface highlighting Moment 16 from May 24, 2024, titled "Kabosu, the Doge Dog, Dies," featuring a photo of the Shiba Inu and noting that 203 tokens were launched about the event between May 22-25, matching the post about Kabosu's passing and the 203 tokens launched on @Pumpfun.

Pi Archive π @PiarchieveB · 2026-10-02T07:40:59+00:00

#ALTSEASON 2026/2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $BNB to $5000 $SOL to $1000 $XRP to $10 $DOGE to $1 $SHIBA to $0.5 $PEPE to $0.1 $WKC to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 $CORE

CoinW @CoinWOfficial · 2026-10-02T20:30:01+00:00

9 boxes. What are you hoping to pull? 9–99 CWC 5–100 DOGE Up to 2M PEPE Trading rewards Trade. Check in. Open your Anniversary Mystery Box: bit.ly/46ydoTR How lucky are you feeling? #WillBeThe9ext

A promotional graphic for CoinW featuring the text 'Surprises: Mystery Boxes Drop!' and 'Trade daily to unlock mystery boxes,' with additional text 'Win 99 CWC, Memecoins, and 20 USDT Mega Coupon!' next to an illustration of a glowing blue and purple gift box.

AI visual analysis: A promotional graphic for CoinW featuring the text 'Surprises: Mystery Boxes Drop!' and 'Trade daily to unlock mystery boxes,' with additional text 'Win 99 CWC, Memecoins, and 20 USDT Mega Coupon!' next to an illustration of a glowing blue and purple gift box.

Pi COMMUNITY @Sharkcommunityy · 2026-10-02T10:46:31+00:00

#ALTSEASON 2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $DOGE to $1 $SHIB to $0.5 $PEPE to $0.1 $XLM to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 $BABYDOGE to $0.002

Mavis CNL @ChiBoy22464274 · 2026-10-02T12:49:04+00:00

Blood line 2027 BULL RUN PEAK PRICE TARGETS! #ALTCOIN $BTC $200k $ETH $10k $BNB $4 $XRP $50 $SOL $300 $LUNC $2 #MEMECOIN $DOGE $5 $SHIBA $1 $PEPE $0.9 $DOG $0.1 $BONK 0.05 $BABYDOGE $0.0005 $FLOKI $0.8 Very soon

Angry Crypto Show @angrycryptoshow · 2026-10-02T15:09:19+00:00

JUST IN: #Cardano $ADA generated over $1,000,000 in 24h trade volume on Polymarket's crypto perpetuals, surpassing Dogecoin at $676,000, XRP at $523,000, Chainlink at $295,000, and more than 9x BNB at $101,000.

The image displays the Cardano (ADA) logo, featuring a circular arrangement of white dots on a blue background with radiant golden light streaks. The graphic accompanies news that Cardano has surpassed major cryptocurrencies in 24-hour trade volume on Polymarket's crypto perpetuals, leading with over $1,000,000.

AI visual analysis: The image displays the Cardano (ADA) logo, featuring a circular arrangement of white dots on a blue background with radiant golden light streaks. The graphic accompanies news that Cardano has surpassed major cryptocurrencies in 24-hour trade volume on Polymarket's crypto perpetuals, leading with over $1,000,000.

Size Chad @SizeChad · 2026-10-02T22:37:14+00:00

Doge and shiba went to $80b and $40b+ respectively. Lower your price targets

A mathematical diagram showing a tall narrow bell curve (normal distribution) on the left with overlapping circles of decreasing size cascading to the right.

AI visual analysis: A mathematical diagram showing a tall narrow bell curve (normal distribution) on the left with overlapping circles of decreasing size cascading to the right.

Kong Trading @KongBTC · 2026-10-02T11:30:00+00:00

$DOGE $0.094604 Down half a percent and somehow still the most argued about coin in every group chat It doesnt need news to be a personality

A candlestick chart displays the DOGE/USD trading pair on TradingView's 2-hour timeframe, showing price action around the 0.094604 level with a descending trendline, an RSI indicator, and a recent sharp upward spike marked by an arrow—visually capturing the volatile, headline-grabbing nature of Dogecoin that the post humorously alludes to.

AI visual analysis: A candlestick chart displays the DOGE/USD trading pair on TradingView's 2-hour timeframe, showing price action around the 0.094604 level with a descending trendline, an RSI indicator, and a recent sharp upward spike marked by an arrow—visually capturing the volatile, headline-grabbing nature of Dogecoin that the post humorously alludes to.

@wallstreetcn_live:wallstreetcn_live · 2026-10-02T02:21:14.792437+00:00

日本财务大臣片山皋月:将加大力度推进日本版DOGE(政府效率部)对补助金和基金的审查。 将在预算编制过程中大幅精简闲置基金。 目前约有200个现有基金,总价值约7万亿日元。

응원하는 초코 @Cheering_ChoCo · 2026-10-02T12:49:26+00:00

LOL, DogeChain is really coming out??

A screenshot of a CoinMarketCap tweet in Korean announcing that DogeOS has launched a public testnet for an EVM smart contract built on Dogecoin, featuring the DogeOS logo and a Dogecoin image.

AI visual analysis: A screenshot of a CoinMarketCap tweet in Korean announcing that DogeOS has launched a public testnet for an EVM smart contract built on Dogecoin, featuring the DogeOS logo and a Dogecoin image.

Doctor Doge @officialdrdoge · 2026-10-02T12:51:24+00:00

Just a normal day of two best friends helping each other.

Sigma77 @IamSigma007 · 2026-10-02T02:18:15+00:00

$DOGE is holding the $0.0939 shelf after the channel break. Next stop on the chart is $0.1090 if it sticks. Not advice.

CRYPTO THRO @CryptoThro · 2026-10-02T09:03:48+00:00

What Would You Buy Confidently if You have $10K in USDT ?$DROVER$CKOM#HYDRACHAIN $WKC $MANYU $MASK $DOG $TROLL $DOGE $VINE $PEPE Any Other

A colorful collage of popular memecoin logos including Dogecoin (D), Shiba Inu, Pepe the Frog, Floki, Dogwifhat, and other dog and cat-themed cryptocurrencies.

AI visual analysis: A colorful collage of popular memecoin logos including Dogecoin (D), Shiba Inu, Pepe the Frog, Floki, Dogwifhat, and other dog and cat-themed cryptocurrencies.

DongPham @phamduydong179 · 2026-10-02T03:00:02+00:00

CAN DOGE ENTER THE SMART CONTRACT ERA? On September 30, DogeOS launched its public testnet, providing developers with an EVM-compatible environment to build applications on Dogecoin for the first time Uses dogecoin:native as the transaction fee token From “meme coin” to

Crypto news graphic titled 'DOGECOIN'S SMART CONTRACT TESTNET IS HERE!' with three sections: 'THE NEWS' (Dogecoin launches first smart contract testnet), 'WHAT IT MEANS' (enables dAPPs, NFTs, DeFi), and 'IMPACT & FUTURE' (could drive adoption).

AI visual analysis: Crypto news graphic titled 'DOGECOIN'S SMART CONTRACT TESTNET IS HERE!' with three sections: 'THE NEWS' (Dogecoin launches first smart contract testnet), 'WHAT IT MEANS' (enables dAPPs, NFTs, DeFi), and 'IMPACT & FUTURE' (could drive adoption).

Dogecoin OG @realDogecoinOG · 2026-10-02T18:53:30+00:00

Shorts hitting the market driving crypto lower. $Doge currently at .09 with a lot of pressure. Told you things were going to get rough. HODL

A cryptocurrency trading chart for DOGE Perpetual Futures Contract showing a price of 0.09079, down 3.46%, with candlestick patterns and moving averages.

AI visual analysis: A cryptocurrency trading chart for DOGE Perpetual Futures Contract showing a price of 0.09079, down 3.46%, with candlestick patterns and moving averages.

Pi UpdatesDaily | INTERLINK ID: 327776 @Pi_UpdatesDaily · 2026-10-02T13:36:36+00:00

My prediction for the next 6–12 months: $BTC : $145K $ETH : $8K $PI : $314 $BNB : $1,500 $SOL : $700 $XRP : $4.80 $DOGE : $2.50 $LINK : $450 $ZEC : $2,500 $NEAR : $20 $HBAR : $0.60 $QNT : $900 $ARB : $1.20 $ONDO : $3.00 $SUI : $6.00 $TAO : $1,500 $UNI : $40 $ENA : $1.20 $XLM : $1.00 $KAS : $0.25

𝐓𝐎𝐏 𝐃𝐎𝐆𝐄 @TOPDOGE007 · 2026-10-02T16:42:22+00:00

Me and bro planning our path to generational wealth with a combined net worth of $3.20. The vision is priceless though.

Web3 News @Web3news_Org · 2026-10-02T13:32:13+00:00

My targets for the next 6–12 months: $BTC : $120K-$145K $ETH : $6K-$8K $BNB : $950-$1,500 $SOL : $400-$700 $XRP : $3.20-$4.80 $DOGE : $1.10-$2.50 $LINK : $280-$450 $ZEC : $2,500 $NEAR : $12-$20 $HBAR : $0.35-$0.60 $QNT : $550-$900 $ARB : $0.60-$1.20 $ONDO : $1.50-$3.00 $SUI : $3.50-$6.00

JAMAN @JAMAKS7 · 2026-10-02T08:54:43+00:00

An Ascending Channel on the 4hr chart at $Hold this baby is ready to make waves! Just watch. $NPC $pepe $xrp $doge $shib $ada $link $sol

A TradingView candlestick chart shows the HOLD/USD pair on DEXTools.io with a 4-hour timeframe, featuring blue trendlines forming a rising channel pattern, a MACD indicator below, and a price of 0.0002554.

AI visual analysis: A TradingView candlestick chart shows the HOLD/USD pair on DEXTools.io with a 4-hour timeframe, featuring blue trendlines forming a rising channel pattern, a MACD indicator below, and a price of 0.0002554.

JOOP @joopooranski · 2026-10-02T06:09:33+00:00

$DOG > $DOGE

A vibrant illustration featuring a Shiba Inu dog in a '$DOG' hoodie and sunglasses walking another Shiba Inu on a leash, set against a Dubai cityscape with banners displaying Bitcoin and '$DOG' logos.

AI visual analysis: A vibrant illustration featuring a Shiba Inu dog in a '$DOG' hoodie and sunglasses walking another Shiba Inu on a leash, set against a Dubai cityscape with banners displaying Bitcoin and '$DOG' logos.

Hotcoin @HotcoinGlobal · 2026-10-02T10:01:10+00:00

memes aren't rallying. they're rotating. october pick, one only: $PENGU $FARTCOIN $PEPE $DOGE $MARSCOIN who catches the next rotation?

Lucilfer @cat_maxxxed · 2026-10-02T16:04:40+00:00

My hot take is that “community” is overrated/misunderstood $DOGE did not go to 80B because there was an active group chat It went that high because the meme was a suitable egregore fun to participate in. Communities do not scale to millions of people

𝐓𝐎𝐏 𝐃𝐎𝐆𝐄 @TOPDOGE007 · 2026-10-02T01:41:56+00:00

Dogecoin family, I owe ya’ll a genuine apology. I wasn’t able to come through on Tipping Tuesday like I promised this week & I’m sorry. Right now, @MyDoge V3 is the only way I have to easily send less than $1 in $DOGE at a time, and while it’s still unavailable to everyone, my

dogegod @_dogegod_ · 2026-10-02T01:09:15+00:00

Dogecoin will soon show us why it’s the best again. Buckle up.

A close-up of a smiling Shiba Inu dog with a pixelated 'deal with it' sunglasses sticker edited over its eyes.

AI visual analysis: A close-up of a smiling Shiba Inu dog with a pixelated 'deal with it' sunglasses sticker edited over its eyes.

$SHIB Bezos $SHIB $AMC $BKKT ToTheMoon INVESTOR @BezosCrypto · 2026-10-02T14:46:50+00:00

#SHIBARMY have to remember when #DOGE had a one cent dream. Seemed impossible at the time. #Dogecoin hit .70cent Very few believed it could happen. YOU HAVE TO HAVE VISION. STOP THE FUD#SHIB TO ONE CENT SOON $SHIB #SHIB #SHIBA #shibainu #Shibarium #SHIBARMYSTRONG

Sir Doge of the Coin @dogeofficialceo · 2026-10-02T19:36:03+00:00

WATCH THE FEED

CRYPTO CAPTAIN @UniverseTwenty · 2026-10-02T16:00:08+00:00

BOOM Biggest altcoin season is coming sooner than anticipated charts clearly says everything and the fib level shows 20T$ before the end of 2027 history in crypto markets often repeats. #BTC #ETH #ADA #XRP #IOTA #GLMR #CSPR #BNB #AVAX #SOL #XDC #DOT #SHIB #DOGE #TWT #XLM

A TradingView chart titled 'Crypto Total Market Cap Excluding Top 10, $, 1M' showing a 1.26% gain at $245.64B, with Fibonacci extension levels and an ascending trendline marked out to 2028.

AI visual analysis: A TradingView chart titled 'Crypto Total Market Cap Excluding Top 10, $, 1M' showing a 1.26% gain at $245.64B, with Fibonacci extension levels and an ascending trendline marked out to 2028.

Doge Tipping @Dogetothemoon · 2026-10-02T23:48:01+00:00

THIS IS TIMELESS!

Steve Ferguson @lsferguson · 2026-10-02T22:00:53+00:00

Elon was a Special Government Employee while running DOGE

DogeDesigner @cb_doge · 2026-10-02T11:58:25+00:00

Yes sir

DogeDesigner @cb_doge · 2026-10-02T07:08:39+00:00

Noah Network @NoahAINetwork · 2026-10-02T09:05:00+00:00

Hey @DogeOS we see you

A social media notification showing 'DogeOS and 18 others followed you' 9 months ago, displayed with several profile picture icons.

AI visual analysis: A social media notification showing 'DogeOS and 18 others followed you' 9 months ago, displayed with several profile picture icons.

KrissPax @krisspax · 2026-10-02T23:08:58+00:00

Ferrari 296 GTS in Dogecoin yellow on Ft. Lauderdale Beach Blvd.

苏苏Vee @btc_vee · 2026-10-02T06:06:00+00:00

Based on technical analysis DOGE is set to recreate the madness of 2021!

danny @cladzsol · 2026-10-02T21:49:27+00:00

dogecoin / catecoin of bnb 0xac62596841120397dd2727b40ff5810e71307777 cz wont give name after brocolli, and sending a random image with name "CZ Dog" is the worst thing i've ever seen easy 5m

Tesla Model Doge @TeslaModelDoge · 2026-10-02T04:50:23+00:00

$DOGE is going up

Daejin @Daejinxyz · 2026-10-02T07:16:12+00:00

Daejin is coming to the @DogeOS testnet. That means millions of @dogecoin holders will soon have a place to put their questions, opinions, and predictions on the board. And we’re only getting started. More soon.

Dramatic promotional banner with the text 'DAEJIN × DOGEOS' and 'DAEJIN COMING SOON ON DOGEOS TEST NET', featuring the Doge logo against a red and gold crystalline background.

AI visual analysis: Dramatic promotional banner with the text 'DAEJIN × DOGEOS' and 'DAEJIN COMING SOON ON DOGEOS TEST NET', featuring the Doge logo against a red and gold crystalline background.

𝐓𝐎𝐏 𝐃𝐎𝐆𝐄 @TOPDOGE007 · 2026-10-02T19:21:17+00:00

You can’t compound what you interrupt. Wealth is less about finding the next idea and more about refusing to abandon the last one.

Dilip @oxdilip · 2026-10-02T03:41:05+00:00

LETS SEE TOP @Polymarket PERBS NO2 TRADER STATS BY PNL • Trader name is trader2121 • made over +$440,524 • Total volume $4.4 billion • Current position value $5.4 million • He mostly trades apple ,amd , amezon , arb , arm , avax , bnb , btc , coinbase , circle , doge ,

A financial dashboard shows a profit of $450,281.32 on Polymarket, displaying an upward-trending line graph over time.

AI visual analysis: A financial dashboard shows a profit of $450,281.32 on Polymarket, displaying an upward-trending line graph over time.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T15:15:37+00:00

So is Dogecoin let’s combine the two 𝕏Ð.

darkspark3 @reddit · 2026-10-02T02:56:18.685000+00:00

Lets be doge-enerates.. lets get stupid with the buys this month! 1 dollar?

Wolverinu @WolverinuRH · 2026-10-02T21:49:28+00:00

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T10:42:44+00:00

Have a great morning, everyone

An ethereal digital artwork depicts a figure in a flowing white gown looking upward, surrounded by glowing blue roses, fireflies, and rays of light in a dark forest setting.

AI visual analysis: An ethereal digital artwork depicts a figure in a flowing white gown looking upward, surrounded by glowing blue roses, fireflies, and rays of light in a dark forest setting.

CKJcryptoNews @CKJCryptonews · 2026-10-02T16:45:39+00:00

It's October 2nd The day you will never ever forget @Pumpfun $Sol #Meme BULL RUN STARTS TONIGHT @coinbase @phantom @J777Crypto @untaxxable CKJ Crypto News aka #BULLZILLA123 #100KFOR100 #IBF123 $Ansem $Pump $Tel #bnb $btc $eth $algo $doge #Altcoins

₿₿ @btcbox123 · 2026-10-02T09:21:07+00:00

Seriously, altcoins have been ridiculed non-stop for the past 5 years straight. But altcoin charts are looking good now, and the overall crypto charts are solid too. We're basically winning Ethereum, XRP, Dogecoin, go up. Man, it was a long haul anyway#XRP#ETH#DOGE

Six cryptocurrency candlestick charts are displayed on a black background, showing bearish downtrend lines for ETH, XRP, SOL, BNB, LINK, and AVAX.

AI visual analysis: Six cryptocurrency candlestick charts are displayed on a black background, showing bearish downtrend lines for ETH, XRP, SOL, BNB, LINK, and AVAX.

The Dutch Doge Guy @070guy · 2026-10-02T18:40:15+00:00

Dips are made to stack more $DOGE

Paulo Vidal @inevitable360 · 2026-10-02T15:37:41+00:00

Dogecoin always was to everyone

Ben @BenX_HQ · 2026-10-02T11:31:33+00:00

Kalshi listing CFTC regulated $DOGE perpetual futures is an odd place for US retail perps to show up, and the pitch is explicitly an onshore alternative to the offshore platforms. What I keep turning over is the choice of $DOGE for it, which probably says something about where

Dogecoin Punks @dogecoinpunks · 2026-10-02T02:33:00+00:00

01100100 01101111 01100111 01100101 01110100 01101111 01100010 01100101 01110010

Tesla Model Doge @TeslaModelDoge · 2026-10-02T10:55:00+00:00

Tesla will soon accept $DOGE for the Roadster

A close-up photo of a Shiba Inu dog next to the red Tesla logo, with a gold Dogecoin (D) coin superimposed between them.

AI visual analysis: A close-up photo of a Shiba Inu dog next to the red Tesla logo, with a gold Dogecoin (D) coin superimposed between them.

₿RACKET @Bracket333 · 2026-10-02T13:46:21+00:00

Good job this week $DOG army. Have an awesome Friday.

A close-up of an embroidered military-style patch on dark fabric featuring a skull with red eyes wearing a purple hooded robe. The patch reads "$DOG ARMY LEONIDAS" in gold lettering.

AI visual analysis: A close-up of an embroidered military-style patch on dark fabric featuring a skull with red eyes wearing a purple hooded robe. The patch reads "$DOG ARMY LEONIDAS" in gold lettering.

MCK @mck_11_11 · 2026-10-02T20:29:00+00:00

$DOGE is still stuck under $0.10. Support is near $0.092. Futures interest is up. The old level keeps rejecting it. @MyDoge what’s your Dogecoin prediction for the rest of 2026? Hold under $0.10, or a real move before year-end? #Dogecoin $DOGE

A gold-colored Dogecoin commemorative coin featuring the iconic Shiba Inu dog face, surrounded by the text 'DOGECOIN', 'WOW', and '1 DOGECOIN' against a dark background.

AI visual analysis: A gold-colored Dogecoin commemorative coin featuring the iconic Shiba Inu dog face, surrounded by the text 'DOGECOIN', 'WOW', and '1 DOGECOIN' against a dark background.

Paulo Vidal @inevitable360 · 2026-10-02T23:17:44+00:00

Dogecoin .....

$SHIB Bezos $SHIB $AMC $BKKT ToTheMoon INVESTOR @BezosCrypto · 2026-10-02T14:49:02+00:00

Look what happen w/ #DOGE Heard million times #Doge wud never get to 10 cents in a 100 years! It was impossible. Guess they were all wrong? From $0.00000869 in 2015~ $0.68 STOP THE FUD $SHIB TO 1~10 CENT SOON Fixed Supply w/ Everyday Burning Mechanism plus #ShibETF HOLD

A promotional graphic titled '$SHIB To $1' and 'ShibaInu ETF POSSIBLE' in red text on a yellow banner, with three mystical symbols below and the phrase 'let the universe conspire in our favor' at the bottom.

AI visual analysis: A promotional graphic titled '$SHIB To $1' and 'ShibaInu ETF POSSIBLE' in red text on a yellow banner, with three mystical symbols below and the phrase 'let the universe conspire in our favor' at the bottom.

MEXC_華語 @MEXCZH · 2026-10-02T10:35:00+00:00

MEXC Contract Position Limits Raised Again This adjustment covers: BTC, ETH, SOL, XRP, DOGE, SUI, WLD, PEPE, LINK, ADA, TAO, XLM, DOT, INJ, SHIB Among them, BTCUSDT position limits for certain tiers can reach up to 160 million USDT, and ETHUSDT up to 130 million USDT

A MEXC cryptocurrency exchange notification screen displaying the Chinese characters '通知' (Notification) on a blue button.

AI visual analysis: A MEXC cryptocurrency exchange notification screen displaying the Chinese characters '通知' (Notification) on a blue button.

_KaiserSoze_ @reddit · 2026-10-02T14:14:06.531000+00:00

[WTS][WTT] YPS Pours/Year of the C**k/Generics Hello again, Back up for discussion trying to increase my flair and cure my boredom. Up for sale, ideally for trade. Deliberately priced high to induce some wheel and deal banter trading! Let me know what you got, willing to work with you! Cash can be added or received for any trade. Interested in vintage 10oz bars, ASEs, $5 Gold Indian, cool toners, unique rounds. Up for consideration: 4x 3oz Doge YPS pours ($200/ea) 2x 3oz BTC YPS pours ($200/ea) 1x 1oz 2005 Year of the C**k Lunar series ($70) 1x 2oz Legacies of Freedom coin set including 1oz ASE and 1oz Brittania ($140)

BullishMarketCap @BullishMarktCap · 2026-10-02T21:02:53+00:00

CRYPTO PULSE · 24H $BTC $84,464 ▼0.17% $ETH $2,663 ▼1.30% $SOL $117.81 ▼0.25% $XRP $1.47 ▼1.64% $BNB $763.89 ▼0.72% $DOGE $0.0913 ▼3.37% Top mover: $DOGE −3.37% #Crypto #Bitcoin #Altcoins

A "Crypto Pulse - 24H" dashboard from BullishMarketCap News showing price drops for Bitcoin ($84,464), Ethereum ($2,663), Solana ($117.81), XRP ($1.47), BNB ($763.89), and Dogecoin ($0.0913, marked as Top Mover) on Oct 2.

AI visual analysis: A "Crypto Pulse - 24H" dashboard from BullishMarketCap News showing price drops for Bitcoin ($84,464), Ethereum ($2,663), Solana ($117.81), XRP ($1.47), BNB ($763.89), and Dogecoin ($0.0913, marked as Top Mover) on Oct 2.

sashinmeena @sashinmeena · 2026-10-02T15:54:49+00:00

Three rugs. Three times they said “filtering bots.” Doge looked at me and said: “You’re not early. You’re the exit.” Fourth CA in hand. This one either prints… or buries me. @ptsdshow

Paulo Vidal @inevitable360 · 2026-10-02T13:44:18+00:00

Probably making a Dogecoin Game based on this Nintendo NES game "A Boy and his BLOB"

A Nintendo Entertainment System game cartridge of 'A Boy and His Blob: Trouble on Blobolonia' sits on a green cutting mat alongside a small crocheted figure.

AI visual analysis: A Nintendo Entertainment System game cartridge of 'A Boy and His Blob: Trouble on Blobolonia' sits on a green cutting mat alongside a small crocheted figure.

Tesla Model Doge @TeslaModelDoge · 2026-10-02T20:16:25+00:00

Who wants to start a $DOGE company together?

SIMBA @Simba_Doges · 2026-10-02T15:02:58+00:00

도지코인

A news article titled 'Elon Musk Announces Imminent Public Launch of X Money Payments Platform' announces X Money's upcoming public release with Visa partnership, 38 U.S. state licenses, and Q1 2026 nationwide rollout.

AI visual analysis: A news article titled 'Elon Musk Announces Imminent Public Launch of X Money Payments Platform' announces X Money's upcoming public release with Visa partnership, 38 U.S. state licenses, and Q1 2026 nationwide rollout.

DogeRoninToshimasa | 48 @toshimasazap · 2026-10-02T13:47:46+00:00

#Dogecoin The employment stats were as bad as my high school Japanese language score (27), So I was like, Dogecoin's in trouble too lolllll, But surprisingly, the market seems to have taken it positively, and it's broken past 15.3 yen. I'd be thrilled if it keeps rising to

[caption-failed: image unfetchable or no caption]

AI visual analysis: [caption-failed: image unfetchable or no caption]

Sunny哥 @BTC__Sunny · 2026-10-02T10:33:29+00:00

I don't need any traffic, nor do I need anyone's approval I only persist in doing the things I love Checking Bitcoin prices and regularly investing in Doge has become a habit every day.

A cryptocurrency trading app screenshot showing DOGE/USDT trading pair at price 0.09655, up 2.36%, with technical indicators like BOLL, SAR, and a candlestick chart on a black background.

AI visual analysis: A cryptocurrency trading app screenshot showing DOGE/USDT trading pair at price 0.09655, up 2.36%, with technical indicators like BOLL, SAR, and a candlestick chart on a black background.

foundercity @Foundercitygame · 2026-10-02T13:38:49+00:00

FounderCity side story is live: Elon on Line One. 2021: CZ suggests a name for Elon's coin, MarsCoin. Elon: "There will definitely be a MarsCoin!" So we flew a Doge rocket to the Moon, then on to Mars, to deliver it. It goes live in half an hour—that is, at 10:00 Beijing time.

A digital illustration showing CZ on the left and Elon Musk on the right, both smiling and texting, separated by a Mars planet and a rocket.

AI visual analysis: A digital illustration showing CZ on the left and Elon Musk on the right, both smiling and texting, separated by a Mars planet and a rocket.

Olivier D. @Dark64 · 2026-10-02T07:04:40+00:00

$DOGE weekly : as weird as it seems $0.12 >>COULD<< trigger the next bullish leg

A complex TradingView candlestick chart displaying technical analysis with trendlines, support/resistance levels, and various Fibonacci retracement annotations.

AI visual analysis: A complex TradingView candlestick chart displaying technical analysis with trendlines, support/resistance levels, and various Fibonacci retracement annotations.

Paulo Vidal @inevitable360 · 2026-10-02T16:58:22+00:00

- What do we want? To Buy and Sell things in #Dogecoin $DOGE - Wen do we want it? Now!

A four-panel 'What do we want?' meme featuring cartoon characters shouting: 'TO BUY AND SELL THINGS IN DOGE COIN!' / 'WEN DO WE WANT IT?' / 'NOW!'.

AI visual analysis: A four-panel 'What do we want?' meme featuring cartoon characters shouting: 'TO BUY AND SELL THINGS IN DOGE COIN!' / 'WEN DO WE WANT IT?' / 'NOW!'.

𝐓𝐎𝐏 𝐃𝐎𝐆𝐄 @TOPDOGE007 · 2026-10-02T22:38:17+00:00

POV: You ape your entire paycheck into $DOGE

Your Crypto DJ @yourcryptodj · 2026-10-02T17:00:01+00:00

2013 - You missed $BTC 2014 - You missed $DOGE 2015 - You missed $XRP 2016 - You missed $ETH 2017 - You missed $ADA 2018 - You missed $BNB 2019 - You missed $LINK 2020 - You missed $DOT 2021 - You missed $SHIB In 2025, don't miss $_____

luka @LukaDoge · 2026-10-02T11:50:58+00:00

Dogecoin $DOGE

A retro-style poster featuring the Dogecoin Shiba Inu dog wearing pixelated 'thug life' sunglasses, with 'DOGECOIN - TO THE MOON!' text in neon styling against a vaporwave aesthetic.

AI visual analysis: A retro-style poster featuring the Dogecoin Shiba Inu dog wearing pixelated 'thug life' sunglasses, with 'DOGECOIN - TO THE MOON!' text in neon styling against a vaporwave aesthetic.

DogeDesigner @cb_doge · 2026-10-02T13:14:40+00:00

Sunny哥 @BTC__Sunny · 2026-10-02T08:50:06+00:00

统计时间! Doge过去5个月的周五数据: 5月周五统计:上涨3次,下跌2次 1.05-02(周五):+1.27% 2. 05-09(周五):-0.83% 3. 05-16(周五):+2.14% 4. 05-23(周五):-1.61% 5. 05-30(周五):+0.90% 6月:周五统计:上涨1次,下跌3次 1. 06-06(周五):-2.32% 2. 06-13(周五):+1.05% 3.

AC哥 @0xphoenix00 · 2026-10-02T05:20:19+00:00

攤牌了 其實我是 $DOGE 大戶 很早以前就持有狗了 看著Doge的大起大落 我還是忍不住出來發聲 體質很好 共識強 老馬背書 勸你們持有一點 要起飛了

Doge Norway @DogecoinNorway · 2026-10-02T23:16:04+00:00

When Elon Musk and Optimus lands on the Moon. By Grok Imagine

DogeTrader @btc694200 · 2026-10-02T08:23:57+00:00

Dogecoin $DOGE

A cryptocurrency price chart for DOGE/USDT showing the price at 0.09770 USDT (¥0.655567, +3.86%) on the MEME hot list, with a 15-minute candlestick chart displaying an upward trend.

AI visual analysis: A cryptocurrency price chart for DOGE/USDT showing the price at 0.09770 USDT (¥0.655567, +3.86%) on the MEME hot list, with a 15-minute candlestick chart displaying an upward trend.

Pop in Ðoge @popindoge · 2026-10-02T07:03:34+00:00

If you’ve been meaning to get into COOKduku, this is your little reminder You’ve got just about one more day to play for free, so take advantage of it while you can. Get a few games in, learn the flow and see how far you can push yourself up that leaderboard. The Weekly

A promotional ad for "COOKDUKU" shows a hand holding a smartphone displaying a "Level Cleared!" screen for a free puzzle game, with text "Free practice before weekly jackpots" and a "PLAY FOR FREE" button.

AI visual analysis: A promotional ad for "COOKDUKU" shows a hand holding a smartphone displaying a "Level Cleared!" screen for a free puzzle game, with text "Free practice before weekly jackpots" and a "PLAY FOR FREE" button.

Tina @tinaa2526 · 2026-10-02T10:00:00+00:00

Dogecoin is trying to become more than just DOGE transfers. DogeOS just opened its public testnet, giving developers an EVM compatible application layer on top of Dogecoin. Teams are already building lending, perps, stablecoins and prediction market tools. A memecoin chain

A physical commemorative Dogecoin (DOGE) silver coin featuring the Shiba Inu dog face and text including 'wow', 'much coin', 'how money', and 'so crypto to the moon'.

AI visual analysis: A physical commemorative Dogecoin (DOGE) silver coin featuring the Shiba Inu dog face and text including 'wow', 'much coin', 'how money', and 'so crypto to the moon'.

METATRONICS @metatronics_ · 2026-10-02T09:11:24+00:00

CRYPTO & AI MARKET UPDATE The crypto market is moving — and AI is becoming a deeper part of financial infrastructure. Here’s what this METATRONICS update covers: Crypto market snapshot Fresh CoinMarketCap data for BTC, ETH, SOL, XRP, BNB and DOGE, including current

luka @LukaDoge · 2026-10-02T11:03:27+00:00

Dogecoin

A meme featuring a Shiba Inu dog with text announcing 'U.S. UNEMPLOYMENT DATA DROPS TODAY AT 8:30 AM ET!' and 'PREVIOUS: 4.1%' and 'FORECAST: 4.1%'.

AI visual analysis: A meme featuring a Shiba Inu dog with text announcing 'U.S. UNEMPLOYMENT DATA DROPS TODAY AT 8:30 AM ET!' and 'PREVIOUS: 4.1%' and 'FORECAST: 4.1%'.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T13:36:37+00:00

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T18:54:33+00:00

チャート研ニキ【暗号資産・日本株・アメリカ株】 @NeocandleBTC · 2026-10-02T09:22:35+00:00

ドージコイン上がってきた!!

Dogecoin (DOGEUSD) price chart showing $0.097383 USD, up +0.003060 (+3.24%) today, with a candlestick graph spanning from around 10:30 to 18:00.

AI visual analysis: Dogecoin (DOGEUSD) price chart showing $0.097383 USD, up +0.003060 (+3.24%) today, with a candlestick graph spanning from around 10:30 to 18:00.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T15:23:04+00:00

𝕏Ð

Humorous meme with the text 'Job interview: "What's this gap on your resume?" Me:' showing a wizard walking alone in a desert, leaving footprints behind him.

AI visual analysis: Humorous meme with the text 'Job interview: "What's this gap on your resume?" Me:' showing a wizard walking alone in a desert, leaving footprints behind him.

luka @LukaDoge · 2026-10-02T21:34:08+00:00

Dogecoin

Doginal Dogs Sales Bot @DDSalesBot · 2026-10-02T15:40:45+00:00

New @doginaldogs sale! Doginal Dog #605 62500 DOGE ($5937 USD) market.doginaldogs.com/inscription/87 …

A pixel art character with a black horned helmet and glowing red eyes stands against a pink background, resembling a superhero figure.

AI visual analysis: A pixel art character with a black horned helmet and glowing red eyes stands against a pink background, resembling a superhero figure.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T20:54:59+00:00

Shibsy @shibesdoggo · 2026-10-02T09:39:43+00:00

Gm $DOGE family Understand it's not about purism It's about information and communication & transparency. I have 4 years of experiencing dogecoin EVMs I dont want @DogeOS & @MyDoge to disappear in 4 years, I want them to still be here in 20 years. Have a good day today shibes

Tesla Model Doge @TeslaModelDoge · 2026-10-02T08:02:00+00:00

If you could only save 1 $DOGE

A four-panel digital illustration features Elon Musk running from a burning door, looking at melting figures topped with Bitcoin and Dogecoin logos, and later carrying a Dogecoin coin away from a burning building.

AI visual analysis: A four-panel digital illustration features Elon Musk running from a burning door, looking at melting figures topped with Bitcoin and Dogecoin logos, and later carrying a Dogecoin coin away from a burning building.

SSteele @88breess · 2026-10-02T11:51:58+00:00

QT Halloween Bat TFTI @FreshCopy4_You All welcome Invite @Ynohtnareklaw @roterfeenstaub @JoeyDoge42069 @Chelle_Ai_ @CLEETX627 @zukeworks

A vibrant, fantastical illustration of a Halloween bat with flowing pink and turquoise fur, featuring large pointed ears and outstretched wings, appears as a decorative NFT-style artwork for the "QT Halloween Bat" Twitter post. The background blends warm reds, oranges, and blues to create an ethereal atmosphere fitting the seasonal theme.

AI visual analysis: A vibrant, fantastical illustration of a Halloween bat with flowing pink and turquoise fur, featuring large pointed ears and outstretched wings, appears as a decorative NFT-style artwork for the "QT Halloween Bat" Twitter post. The background blends warm reds, oranges, and blues to create an ethereal atmosphere fitting the seasonal theme.

Paulo Vidal @inevitable360 · 2026-10-02T17:48:53+00:00

#Dogecoin can only succeed if people use $Doge as a means of exchange. There are endless tools and ways to use $Doge , but no one uses as it should. How can X or otehr big brands implement Dogecoin payments if no ones uses it today? What is missing for you?

The image is a "Days Without" meme featuring a Simpsons character holding up two zeros on a sign, with the text altered to read "DAYS WITHOUT USING DOGECOIN PEOPLE," humorously highlighting the irony that nobody actually uses Dogecoin as a medium of exchange. This perfectly complements the post's point about Dogecoin's lack of real-world utility, mocking the disconnect between its hype and its actual adoption as a payment method.

AI visual analysis: The image is a "Days Without" meme featuring a Simpsons character holding up two zeros on a sign, with the text altered to read "DAYS WITHOUT USING DOGECOIN PEOPLE," humorously highlighting the irony that nobody actually uses Dogecoin as a medium of exchange. This perfectly complements the post's point about Dogecoin's lack of real-world utility, mocking the disconnect between its hype and its actual adoption as a payment method.

Tesla Model Doge @TeslaModelDoge · 2026-10-02T12:46:00+00:00

This was Elon with $DOGE in 2021

An edited image of Elon Musk recreating the famous "Titanic" pose, but instead of holding a woman, he is holding the Shiba Inu dog associated with the Dogecoin cryptocurrency, with a sunset ocean in the background.

AI visual analysis: An edited image of Elon Musk recreating the famous "Titanic" pose, but instead of holding a woman, he is holding the Shiba Inu dog associated with the Dogecoin cryptocurrency, with a sunset ocean in the background.

Ɖoge_Alb @doge_albania · 2026-10-02T22:59:03+00:00

A meme featuring SpongeBob SquarePants in an oversized Carhartt jacket holding a spoon, with text reading 'When the homie that thrifts enters the room'.

AI visual analysis: A meme featuring SpongeBob SquarePants in an oversized Carhartt jacket holding a spoon, with text reading 'When the homie that thrifts enters the room'.

Paulo Vidal @inevitable360 · 2026-10-02T17:43:00+00:00

He have #Dogecoin

A two-panel meme from a tropical setting featuring two men at an outdoor table, with text reading 'HE HAVE DOGECOIN' in the top panel and 'SEE NOBODY CARES' in the bottom panel.

AI visual analysis: A two-panel meme from a tropical setting featuring two men at an outdoor table, with text reading 'HE HAVE DOGECOIN' in the top panel and 'SEE NOBODY CARES' in the bottom panel.

Lunc Community @Pi_Community0 · 2026-10-02T02:18:17+00:00

Meme supercycle will send: $DOGE 1000x $SHIB 5000x $PEPE 3000x $FLOKI 6000x $BONK 8000x $LUNC 1000x $BABYDOGE 30000x What's your prediction??

MuchWowDoge @MuchWowOnDoge · 2026-10-02T17:34:55+00:00

Much wow

Roll @Rollmeta · 2026-10-02T20:14:23+00:00

When in doubt Doginal Dog it out

A pixel art image of a black cat-like figure with red eyes, wearing a colorful orange sombrero.

AI visual analysis: A pixel art image of a black cat-like figure with red eyes, wearing a colorful orange sombrero.

Paulo Vidal @inevitable360 · 2026-10-02T21:51:30+00:00

Progress #DogeGo ( DogeGo.org) - Much Faster Full Dogecoin Node is closer to be ready for the first full working beta version and to solve CGNAT and Testnet problems from CORE. Also will include solo mining $DOGE using any normal computer

A screenshot of the Doggo mainnet explorer showing the "BlockStep" page with a timeline highlighting Block #49,396,983 from Oct 2, 2026.

AI visual analysis: A screenshot of the Doggo mainnet explorer showing the "BlockStep" page with a timeline highlighting Block #49,396,983 from Oct 2, 2026.

Don @DonWedge · 2026-10-02T18:02:51+00:00

$DOGE will melt faces

Ɖoge_Alb @doge_albania · 2026-10-02T15:21:19+00:00

Sigh ...

A four-panel Wojak-style meme featuring a complex spherical object with faces and the text 'Be not afraid', alongside a smoking Wojak with text 'OK', 'Really?', and 'I got a lot going on man'; watermarked with '@templarpllled'.

AI visual analysis: A four-panel Wojak-style meme featuring a complex spherical object with faces and the text 'Be not afraid', alongside a smoking Wojak with text 'OK', 'Really?', and 'I got a lot going on man'; watermarked with '@templarpllled'.

Paulo Vidal @inevitable360 · 2026-10-02T17:08:11+00:00

#Dogecoin

A three-panel meme featuring Moe Szyslak from The Simpsons, labeling the characters as 'DOGECOIN', 'GOVERNMENT', and 'DOGECOIN'.

AI visual analysis: A three-panel meme featuring Moe Szyslak from The Simpsons, labeling the characters as 'DOGECOIN', 'GOVERNMENT', and 'DOGECOIN'.

Rand Group @randgroup · 2026-10-02T11:27:55+00:00

It has been a long time coming for $DOGE

The Dutch Doge Guy @070guy · 2026-10-02T02:20:00+00:00

There’s a new dawn for crypto

A stylized illustration of a red and white Shiba Inu dog wearing a blue and white uniform with a red star emblem, set against a backdrop featuring a large red sun, clouds, and a city skyline.

AI visual analysis: A stylized illustration of a red and white Shiba Inu dog wearing a blue and white uniform with a red star emblem, set against a backdrop featuring a large red sun, clouds, and a city skyline.

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T13:27:35+00:00

A retro 1980s/90s-style collage features four panels with nostalgic imagery including an arcade, a TV with kids playing, kids with bicycles, and people with neon decorations.

AI visual analysis: A retro 1980s/90s-style collage features four panels with nostalgic imagery including an arcade, a TV with kids playing, kids with bicycles, and people with neon decorations.

Paulo Vidal @inevitable360 · 2026-10-02T12:17:28+00:00

Don't worry @Nike , #Dogecoin will fix it wen you allow the integration of $Doge payments. I can do it on all your platforms easly

An infographic comparing asset prices from 5 years ago to today, showing DOGECOIN dropping 57% from $0.223 to $0.096 and NIKE (NKE) stock dropping 76% from $149.60 to $35.22, sourced from COINGECKO.

AI visual analysis: An infographic comparing asset prices from 5 years ago to today, showing DOGECOIN dropping 57% from $0.223 to $0.096 and NIKE (NKE) stock dropping 76% from $149.60 to $35.22, sourced from COINGECKO.

ÐÐĐOGE Steve @dogecoinsteve · 2026-10-02T12:16:55+00:00

HOÐL Dogecoin $DOGE

A digitally manipulated image of a Shiba Inu dog with an exaggerated, elongated body in an awkward seated pose against a black background, resembling the Doge meme.

AI visual analysis: A digitally manipulated image of a Shiba Inu dog with an exaggerated, elongated body in an awkward seated pose against a black background, resembling the Doge meme.

Ɖoge_Alb @doge_albania · 2026-10-02T23:53:24+00:00

DOGE

A Shiba Inu dog wearing a red samurai armor costume stands on its hind legs against a metal fence.

AI visual analysis: A Shiba Inu dog wearing a red samurai armor costume stands on its hind legs against a metal fence.

Spreek @spreekaway · 2026-10-02T00:28:57+00:00

No evidence of foul play but it's interesting that coinbase has been rotating keys for cbBTC roles last few days (and the other cbXRP, cbDOGE, etc). First time they've rotated since token launch. Hopefully just precautionary

A screenshot of Ethereum blockchain transactions showing details like Transaction Hash, Method, Block, Age, From, To, Amount, and TxN Fee, with recent activity involving a Coinbase address.

AI visual analysis: A screenshot of Ethereum blockchain transactions showing details like Transaction Hash, Method, Block, Age, From, To, Amount, and TxN Fee, with recent activity involving a Coinbase address.

luka @LukaDoge · 2026-10-02T19:05:29+00:00

Dogecoin

Diario฿itcoin @DiarioBitcoin · 2026-10-02T12:23:09+00:00

DOGE cayó menos que Nike en cinco años Dogecoin bajó 57%, de USD 0,223 a USD 0,096. Nike retrocedió 76%, de USD 149,60 a USD 35,22. Ambos activos perdieron valor. La diferencia refleja el periodo comparado, no una ganancia ni una predicción.

A meme image shows a battered cartoon dog in boxing gloves facing a worn Nike sneaker, with Spanish text reading 'DOGE perdió menos que Nike en cinco años, aunque ambos activos terminaron a la baja' and a -57% decline chart.

AI visual analysis: A meme image shows a battered cartoon dog in boxing gloves facing a worn Nike sneaker, with Spanish text reading 'DOGE perdió menos que Nike en cinco años, aunque ambos activos terminaron a la baja' and a -57% decline chart.

AndyOS @MyDogeVN · 2026-10-02T05:56:35+00:00

You would be really bored without the internet. You should consider this before contacting Delta to do something completely ridiculous. You won't know what @elonmusk is saying on 𝕏.

A social media post on an X (Twitter) interface with comments in an Asian language displayed on a dark blue background.

AI visual analysis: A social media post on an X (Twitter) interface with comments in an Asian language displayed on a dark blue background.

paper-corner @reddit · 2026-10-02T10:05:48.708000+00:00

Balance shows in USD after a DOGE deposit, are my coins still DOGE? I have some dogecoin from 2021 and I want to use a small part of it in the best dogecoin casino games. I don't want to sell it first, because the fees on exchanges eat a lot. I checked stake, and fortune jack. All of them accept dogecoin. But on some of them the balance is shown in usd after deposit, so I am not sure if they convert my coins inside. If they convert, I lose on the rate when I deposit and again when I withdraw. That means a small win can turn into a loss. Does anyone know which one keep the balance in doge for real?

BullishMarketCap @BullishMarktCap · 2026-10-02T07:11:58+00:00

CRYPTO PULSE · 24H $BTC $85,972 ▲2.25% $ETH $2,728 ▲0.53% $SOL $121.74 ▲2.16% $XRP $1.52 ▲1.16% $BNB $777.13 ▲0.85% $DOGE $0.0959 ▲0.08% Top mover: $BTC +2.25% #Crypto #Bitcoin #Altcoins

A 'Crypto Pulse - 24H' dashboard from Bullish Marketcap shows price gains for major cryptocurrencies: Bitcoin ($85,972, +2.25%), Ethereum ($2,728, +0.53%), Solana ($121.74, +2.16%), XRP ($1.52, +1.16%), BNB ($777.13, +0.85%), and Dogecoin ($0.0959, +0.08%).

AI visual analysis: A 'Crypto Pulse - 24H' dashboard from Bullish Marketcap shows price gains for major cryptocurrencies: Bitcoin ($85,972, +2.25%), Ethereum ($2,728, +0.53%), Solana ($121.74, +2.16%), XRP ($1.52, +1.16%), BNB ($777.13, +0.85%), and Dogecoin ($0.0959, +0.08%).

Tensei.Nguyen @TenseiNguyen · 2026-10-02T04:05:00+00:00

DOGE chính thức bước vào cuộc đua EVM & DeFi với DogeOS: Public Testnet Chikyū vừa lên sóng, mang ZK Rollup tương thích EVM lên Dogecoin. Giờ đây, DOGE không chỉ dừng lại ở chuyển khoản hay meme, mà chính thức dùng làm phí Gas cho cả một hệ sinh thái DeFi.

An infographic titled 'DOGEOS: A NEW DEFI PIECE FOR DOGECOIN' showing a three-layer architecture (Dogecoin L1, Dogeos L2 with 'Chikyu TESTNET', and DeFi ecosystem) alongside a 'NARRATIVE SHIFT' section and 'KEY LIMITATIONS & CURRENT STATE'.

AI visual analysis: An infographic titled 'DOGEOS: A NEW DEFI PIECE FOR DOGECOIN' showing a three-layer architecture (Dogecoin L1, Dogeos L2 with 'Chikyu TESTNET', and DeFi ecosystem) alongside a 'NARRATIVE SHIFT' section and 'KEY LIMITATIONS & CURRENT STATE'.

DogeRoninToshimasa | 48 @toshimasazap · 2026-10-02T09:51:45+00:00

It's just as Luka's chart predicted, but I think this is the real turning point. If it drops again here, I'll end up clutching my head like, "Oh no, it's the usual thing again," but since we've entered October, I want to keep my hopes up. #DOGE #ドージコイン #Dogecoin #仮想通貨

Sidney M Brewer @Dr_sidneybrewer · 2026-10-02T20:36:01+00:00

#ALTSEASON 2027 BULL RUN HAS NOW STARTED $Bitcoin to $250.000 $ETH to $10.000 $BNB to $5000 $XRP to $10 $DOGE to $1 $SHIB to $0.5 $PEPE to $0.1 $XLM to $3 $FLOKI to $1.50 $BONK to $1 $LUNC to $0.01 #bitcoin #sol #eth

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T14:15:41+00:00

A close-up of a translucent beetle with glowing cyan blue markings on its shell resting on a green leaf.

AI visual analysis: A close-up of a translucent beetle with glowing cyan blue markings on its shell resting on a green leaf.

FluxFinds $ADA $NIGHT $DOG @FluxFindsCrypto · 2026-10-02T05:30:39+00:00

$NIGHT IS GROWING RAPIDLY!!!

A screenshot of a SuperGrok response detailing $NIGHT token holder growth on Cardano, showing an increase from about 44,000 holders at launch to 134,428 now.

AI visual analysis: A screenshot of a SuperGrok response detailing $NIGHT token holder growth on Cardano, showing an increase from about 44,000 holders at launch to 134,428 now.

AndyOS @MyDogeVN · 2026-10-02T04:03:51+00:00

It would be fantastic if you were on v3.

A gold thermos branded 'MyDoge' alongside a laptop displaying 'Me/MyDoge Social Wallet / People's Currency,' set against an ocean backdrop.

AI visual analysis: A gold thermos branded 'MyDoge' alongside a laptop displaying 'Me/MyDoge Social Wallet / People's Currency,' set against an ocean backdrop.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T14:18:35+00:00

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T22:08:19+00:00

A dark, gothic fantasy digital artwork depicting two ethereal, glowing figures embracing beneath a blood-red moon, set among ancient stone ruins shrouded in mist.

AI visual analysis: A dark, gothic fantasy digital artwork depicting two ethereal, glowing figures embracing beneath a blood-red moon, set among ancient stone ruins shrouded in mist.

DogeRoninToshimasa | 48 @toshimasazap · 2026-10-02T12:18:53+00:00

It's 15 minutes before the employment stats release, and there's no movement yet, huh. I think it'll start moving after 9:30 PM, so I'm getting all excited! #DOGE #ドージコイン #雇用統計 #仮想通貨 #暗号資産 #Dogecoin

This image shows a TradingView 15-minute chart for Dogecoin (DOGE/JPY) on Binance, displaying a current price of 15.09 JPY with various technical indicators (RSI 60.26, MACD, Bollinger Bands) and horizontal support/resistance levels around 14.00-16.00 JPY. The chart's pre-market quiet activity before the 9:30 PM employment statistics release aligns with the poster's anticipation of imminent volatility in Dogecoin following the U.S. jobs report.

AI visual analysis: This image shows a TradingView 15-minute chart for Dogecoin (DOGE/JPY) on Binance, displaying a current price of 15.09 JPY with various technical indicators (RSI 60.26, MACD, Bollinger Bands) and horizontal support/resistance levels around 14.00-16.00 JPY. The chart's pre-market quiet activity before the 9:30 PM employment statistics release aligns with the poster's anticipation of imminent volatility in Dogecoin following the U.S. jobs report.

Tinna @ix_tinna · 2026-10-02T12:11:23+00:00

| ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄ ̄| Build on DogeOS! |______________| \ (•◡•) / \ / —— | | |_ |_ Still trending by the

A news feed headline reading 'DogeOS Launches Public Testnet for Dogecoin App Builders' posted 1 day ago with 6.9K posts.

AI visual analysis: A news feed headline reading 'DogeOS Launches Public Testnet for Dogecoin App Builders' posted 1 day ago with 6.9K posts.

Charles (ccc t-shirt) @ccctshirt · 2026-10-02T00:03:51+00:00

Elon, Doge and Fury Cat short vid. #grok #ai #doge @elonmusk

DogeRoninToshimasa | 48 @toshimasazap · 2026-10-02T09:49:59+00:00

【ドージコイン、15円の攻防戦www】 17時くらいに15.3円を超えたけど、今は15円。 15.3円を超えるのって、こんなに大変なのかよ 現在15.29円。でも、魔犬AIを見ると短期は上昇寄り。 ただし、問題はここから。 15.00円:絶対に居座りたい場所 15.33円:下降トレンドラインとの決戦

A TradingView candlestick chart of Dogecoin (DOGE) on Binance, dated October 2, 2026, showing price around 14.89 JPY with various technical indicators and a '最大AI v11' AI signal panel.

AI visual analysis: A TradingView candlestick chart of Dogecoin (DOGE) on Binance, dated October 2, 2026, showing price around 14.89 JPY with various technical indicators and a '最大AI v11' AI signal panel.

The Dogecoin Family @FamilyDogecoin · 2026-10-02T08:48:30+00:00

ÐOGE-EMPIRE.𝕏 @CryptoSLE10 · 2026-10-02T02:23:50+00:00

All on $DOGE

The image features a Dogecoin (DOGE) logo—a Shiba Inu dog's face in a yellow rounded square—next to the bold pixelated text "DOGEOS," referencing both the Dogecoin ticker ($DOGE) mentioned in the post and a play on the cryptocurrency's name.

AI visual analysis: The image features a Dogecoin (DOGE) logo—a Shiba Inu dog's face in a yellow rounded square—next to the bold pixelated text "DOGEOS," referencing both the Dogecoin ticker ($DOGE) mentioned in the post and a play on the cryptocurrency's name.

TESLA-비더플 @richvirus2 · 2026-10-02T01:56:53+00:00

Crypto October Bull Run Start!!! Just 1 year ago, October 2025 (Upbit basis) ♧ Bitcoin about 180 million KRW (25/10/9) ♧ Ethereum about 6.79 million KRW (25/10/7) ♧ XRP 4,368 KRW (25/10/3) ♧ Solana about 337,000 KRW (25/10/6) ♧ Doge 384 KRW (25/10/6)

A financial graphic showing '52주최고 179,869,000 (2025.10.09)' in red and '52주최저 88,342,000 (2026.08.14)' in blue, indicating 52-week high and low values.

AI visual analysis: A financial graphic showing '52주최고 179,869,000 (2025.10.09)' in red and '52주최저 88,342,000 (2026.08.14)' in blue, indicating 52-week high and low values.

Grease @greasemeta · 2026-10-02T17:36:28+00:00

Can I buy someone coffee please Doge addy! Or just DM please!

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T10:57:11+00:00

A field of tall, pale grass with scattered teal flowers sits beneath a dramatic sky filled with dark, heavy storm clouds, with a bird's wing visible in the upper right.

AI visual analysis: A field of tall, pale grass with scattered teal flowers sits beneath a dramatic sky filled with dark, heavy storm clouds, with a bird's wing visible in the upper right.

Ð @DogeMemery · 2026-10-02T01:45:42+00:00

A meme featuring a central squirrel wearing a red hat and apron, surrounded by various dog faces, with the word 'patience' written on the left.

AI visual analysis: A meme featuring a central squirrel wearing a red hat and apron, surrounded by various dog faces, with the word 'patience' written on the left.

CRYPTO KEN aka the Coin King @daCoinKing · 2026-10-02T11:11:07+00:00

New song 'Outside Again' is definitely a banger from @iamdjdefi new album steam it freee yall #btc $eth $doge $shib $pepe $icp $ALGO $dot $LYX $trx $ada $npc $pepe $xrp $link $ROSE $tel $amp $rsr $BCH $LTC $hype $zec $qnt

HeadingToMars @HeadingTooMars · 2026-10-02T13:00:16+00:00

GM Martians $ELON @DogelonMars

mspace @mspace67 · 2026-10-02T18:36:59+00:00

Pair it with spcx tsla or $DOGE imo @elonmusk is very important for @anoncoinit Bullish on $mooncoin @mooncoin_it

Screenshot of the 'anon coin' app interface showing 'Create Coin Anonymously' with options to pair with SPCX, TSLA, and DOGE, plus a 'SIGN IN ANONYMOUSLY' button, and displaying $271.0M market cap.

AI visual analysis: Screenshot of the 'anon coin' app interface showing 'Create Coin Anonymously' with options to pair with SPCX, TSLA, and DOGE, plus a 'SIGN IN ANONYMOUSLY' button, and displaying $271.0M market cap.

Ɖoge_Alb @doge_albania · 2026-10-02T15:20:41+00:00

A courtroom meme featuring a Shiba Inu dog sitting at the witness stand holding a phone, with two uniformed guards behind it, captioned 'Mom come pick me up' and 'They put me on trial for being based.'

AI visual analysis: A courtroom meme featuring a Shiba Inu dog sitting at the witness stand holding a phone, with two uniformed guards behind it, captioned 'Mom come pick me up' and 'They put me on trial for being based.'

Donny Ðoge @DogeDonny2013 · 2026-10-02T19:14:34+00:00

This might be my favorite @re_generates I own, but idk, I have so many good ones! This is one of the best communities I’ve ever been apart of…

A pixel art style portrait of a character with brown hair and red eyes wearing a black jacket over a white shirt, with a yellow bar above their head against a teal background.

AI visual analysis: A pixel art style portrait of a character with brown hair and red eyes wearing a black jacket over a white shirt, with a yellow bar above their head against a teal background.

PennybagsCX @PennybagsCX · 2026-10-02T20:46:23+00:00

He's right ... you know $DOGE $NKE #Dogecoin #CryptoMarkets

A CoinGecko infographic compares 5-year performance between Oct 2, 2021 and Oct 2, 2026, showing Dogecoin down 57% from $0.223 to $0.096 and Nike (NKE) down 76% from $149.60 to $35.22.

AI visual analysis: A CoinGecko infographic compares 5-year performance between Oct 2, 2021 and Oct 2, 2026, showing Dogecoin down 57% from $0.223 to $0.096 and Nike (NKE) down 76% from $149.60 to $35.22.

mspace @mspace67 · 2026-10-02T18:33:26+00:00

Study this Anoncoins now also paired with $TSLA and soon also $doge imo $mooncoin will reach orbit @mooncoin_it @MooncoinOnAnon

A screenshot of an X (formerly Twitter) thread where users question Grok about who the "interim CEO of @X" is, and Grok replies "Elon Musk," referencing a meme where the CTO is the CEO.

AI visual analysis: A screenshot of an X (formerly Twitter) thread where users question Grok about who the "interim CEO of @X" is, and Grok replies "Elon Musk," referencing a meme where the CTO is the CEO.

luka @LukaDoge · 2026-10-02T11:26:20+00:00

Crazy...

PennybagsCX @PennybagsCX · 2026-10-02T19:00:27+00:00

Nobody: Absolutely nobody: $DOGE holders at 3am checking a coin they've held for years: "gm" Dedication isn't scheduled. It's a lifestyle. #Dogecoin #Memecoin

A Shiba Inu dog wearing a blue shirt sits on a kitchen floor, looking at a smartphone displaying a stock chart, with a 'KIKO' branded bowl nearby.

AI visual analysis: A Shiba Inu dog wearing a blue shirt sits on a kitchen floor, looking at a smartphone displaying a stock chart, with a 'KIKO' branded bowl nearby.

叮叮加密貨幣研究筆記|Crypto.DingDing @dingding_TW666 · 2026-10-02T04:36:46+00:00

#DOGE $DOGE Dogecoin 叮叮技術分析 (2026/10/02) 關鍵信號:多週期窄幅拉鋸,等待收盤突破 【核心觀點】:日線維持主升後回調守住多方分水嶺,4H與1H處於箱體整理,短線等待突破確認後續方向。 今日操作主軸: • 波段:依正式進場區間等待,不推測當前是否已進入 • 短線:等待收盤觸發

Emilia_Ea @Ea_19961117 · 2026-10-02T20:13:48+00:00

Up 3%: I’m a genius; time to quit my job. Down 3%: Just a healthy pullback diamond hands. Down 8%: Time to start studying "technical analysis." Down 15%: Technical analysis is a scam; I’m going to church. Rebound 2%: We’re all going to get rich. $BTC $ETH $DOGE $PEPE

Ɖoge_Alb @doge_albania · 2026-10-02T11:55:20+00:00

Good morning legends Happy Friday and I hope you have an amazing day ahead

A digital illustration depicts a flock of birds flying in a pale sky above a chain-link fence adorned with pixelated padlocks of the Dogecoin cryptocurrency logo, with green rolling hills in the background; a watermark reads 'cr0c0-a1bania'.

AI visual analysis: A digital illustration depicts a flock of birds flying in a pale sky above a chain-link fence adorned with pixelated padlocks of the Dogecoin cryptocurrency logo, with green rolling hills in the background; a watermark reads 'cr0c0-a1bania'.

Tito Greisten @Greisten · 2026-10-02T08:40:44+00:00

Green Morgning $DOGE

Wade Douglas @WadeDouglas12 · 2026-10-02T23:25:08+00:00

GN @X Let's have a great night's rest And truly give % in the morning Stay blessed $DOGE

A gritty illustration of a muscular bald man covered in tattoos sitting next to a Shiba Inu dog, both appearing battle-worn in a dark setting with a heavy dumbbell in the foreground.

AI visual analysis: A gritty illustration of a muscular bald man covered in tattoos sitting next to a Shiba Inu dog, both appearing battle-worn in a dark setting with a heavy dumbbell in the foreground.

DogeRoninToshimasa | 48 @toshimasazap · 2026-10-02T11:31:58+00:00

Hey hey! Doge Army, everyone! Tonight's big event, the employment report, is coming up in one hour! 【Tonight, DOGE folks, tune in at 21:30】 Today, October 2 (Fri), the US employment report is scheduled Japan time 21:30 Keep an eye on these three!

The Dogecoin Family @FamilyDogecoin · 2026-10-02T04:29:14+00:00

A medieval fantasy illustration shows two armored knights clasping hands before a stone monument built in a pixelated style, surrounded by soldiers, peasants, and floral tributes under a sunset sky.

AI visual analysis: A medieval fantasy illustration shows two armored knights clasping hands before a stone monument built in a pixelated style, surrounded by soldiers, peasants, and floral tributes under a sunset sky.

Ɖoge_Alb @doge_albania · 2026-10-02T23:13:24+00:00

A humorous vintage photograph showing multiple women cut out and arranged to physically block each other in the frame, captioned "blocking someone" back in the days.

AI visual analysis: A humorous vintage photograph showing multiple women cut out and arranged to physically block each other in the frame, captioned "blocking someone" back in the days.

PennybagsCX @PennybagsCX · 2026-10-02T17:00:40+00:00

Robinhood is now running hourly $DOGE price prediction markets. Kalshi does daily closes. Polymarket takes everything. Three separate regulated venues letting people price dog money's every move. In 2013 this coin was a joke about a webcam dog. The joke has an order book now

A vibrant scene of a stock trading floor celebrating the 'DOGE BELL RINGING' and 'MARKET CLOSE: DOGE WINS!', with a Shiba Inu dog standing on a podium ringing the bell as confetti falls.

AI visual analysis: A vibrant scene of a stock trading floor celebrating the 'DOGE BELL RINGING' and 'MARKET CLOSE: DOGE WINS!', with a Shiba Inu dog standing on a podium ringing the bell as confetti falls.

darkspark3 @reddit · 2026-10-02T03:53:54.458000+00:00

I picked 2 out of all these... doge os will be the foot print.

darkspark3 @reddit · 2026-10-02T03:44:01.699000+00:00

My man with doge os stage 1

darkspark3 @reddit · 2026-10-02T02:58:56.467000+00:00

Where's my doge-enerates at? Lets get this party trolling! I need a rarri!

Wade Douglas @WadeDouglas12 · 2026-10-02T23:20:42+00:00

We always keep it moving $DOGE

A dark, gothic-style digital artwork features a man in a long black trench coat standing beside a large grey wolf with glowing red eyes, set in a dimly lit cathedral-like space with red lighting and a containment cylinder holding a figure in the background.

AI visual analysis: A dark, gothic-style digital artwork features a man in a long black trench coat standing beside a large grey wolf with glowing red eyes, set in a dimly lit cathedral-like space with red lighting and a containment cylinder holding a figure in the background.

BullishMarketCap @BullishMarktCap · 2026-10-02T08:06:58+00:00

DOGEOS: The project has opened its public testnet to bring Ethereum Virtual Machine applications to Dogecoin. READ FULL ARTICLE ON BULLISHMARKETCAP #Dogecoin #DogeOS #Testnet @DogeOS

A promotional banner for "DogeOS" announcing it has "OPENS PUBLIC TESTNET" to bring EVM applications to Dogecoin, with the Dogecoin logo on the right.

AI visual analysis: A promotional banner for "DogeOS" announcing it has "OPENS PUBLIC TESTNET" to bring EVM applications to Dogecoin, with the Dogecoin logo on the right.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T20:37:23+00:00

I am still waiting for @DairyQueen to promote @dogecoin with a Do Only Good Everyday Blizzard. It would be so yummy I just know it

A Dairy Queen promotional advertisement reading 'Do Only Good Everyday BLIZZARD'S', featuring a dog mascot wearing sunglasses alongside several Blizzard ice cream cups and a cone.

AI visual analysis: A Dairy Queen promotional advertisement reading 'Do Only Good Everyday BLIZZARD'S', featuring a dog mascot wearing sunglasses alongside several Blizzard ice cream cups and a cone.

Dogecoin 𝕏 Post @DogecoinXPost · 2026-10-02T21:39:34+00:00

Waiting for 𝕏 Money and Doge to happen

A skeleton sits on a weathered wooden bench in a grassy field, but its skull is replaced with an Iron Man-style helmet containing a Shiba Inu dog's face instead of a human head.

AI visual analysis: A skeleton sits on a weathered wooden bench in a grassy field, but its skull is replaced with an Iron Man-style helmet containing a Shiba Inu dog's face instead of a human head.

Ð @DogeMemery · 2026-10-02T01:02:00+00:00

Up, pwease!

A CoinGecko Global Stats mobile screenshot displaying a Global Market Cap of $2,982,604,930,714 (up 0.7%), 24H Volume of $96,902,276,631, and a line chart tracking prices between $2,950,000,000,000 and $2,990,000,000,000.

AI visual analysis: A CoinGecko Global Stats mobile screenshot displaying a Global Market Cap of $2,982,604,930,714 (up 0.7%), 24H Volume of $96,902,276,631, and a line chart tracking prices between $2,950,000,000,000 and $2,990,000,000,000.

Doctor Doge @officialdrdoge · 2026-10-02T08:31:07+00:00

She kept growing. So did his arms.

Tarek_web3 @Yaaaati_M1 · 2026-10-02T10:29:12+00:00

good afternoon X family, DogeOS launching its testnet is one of those crypto updates that makes me look at Dogecoin a little differently. for years, DOGE has mostly been the meme people hold, trade, and joke about. now DogeOS is trying to build an app layer around that

A man in an orange shirt watches a massive green cargo ship arrive at port, surrounded by Shiba Inu dogs, with a thought bubble reading 'DOGE IS FINALLY GETTING ITS OWN CHAIN'.

AI visual analysis: A man in an orange shirt watches a massive green cargo ship arrive at port, surrounded by Shiba Inu dogs, with a thought bubble reading 'DOGE IS FINALLY GETTING ITS OWN CHAIN'.

Crypto Hogwarts @HogwartsCrypto · 2026-10-02T08:05:00+00:00

uptober is here. but are we actually bullish… or just desperate to be? either way, I’d rather be prepared than caught sidelined. crypto on my radar for Q4 2026 & beyond: $BTC $ETH $SOL $LINK $DOGE $HYPE $TAO $ONDO $ZEC

A fantasy-style illustration features Dumbledore reviewing a 'Q4 WATCHLIST' scroll listing crypto tickers (BTC, ETH, SOL, LINK, DOGE, HYPE, TAO, ONDO, ZEC), with the word 'UPTOBER?' magically floating above.

AI visual analysis: A fantasy-style illustration features Dumbledore reviewing a 'Q4 WATCHLIST' scroll listing crypto tickers (BTC, ETH, SOL, LINK, DOGE, HYPE, TAO, ONDO, ZEC), with the word 'UPTOBER?' magically floating above.

X-Ray..Shadows everywhere @RayNoodlesFSM · 2026-10-02T22:27:21+00:00

Special good night for @aldonamusica and the rest of the Doge family with good will and happiness in life and heart like as @gabbie_dogeA7x & @MyDogeCTO and many more. LOVE YOU BUNCH FAMZ. Good night from the Netherlands dear

Eden @builderdogecoin · 2026-10-02T16:20:39+00:00

Are you prepared?

Pop in Ðoge @popindoge · 2026-10-02T06:09:59+00:00

Kenshi Doge will be building on DogeOS

Smile @ZF01 · 2026-10-02T09:38:11+00:00

$TART $AKE $RIV $ASTER $HermesWorld $SPT $ANSEM $MIM $VELVET $ALTSZN $ROLL $HYPE $GENIUS $BTC $ETH $XRP $SOL $DOGE $TRON $ADA $BNB $TWT $GIGGLE #BabyDoge $TRUMP $WLFI

BullishMarketCap @BullishMarktCap · 2026-10-02T15:29:00+00:00

DOGECOIN: Dogecoin ( $DOGE ) rose 3%, supported by the launch of the DogeOS public testnet for EVM applications and whale accumulation.

Ð @DogeMemery · 2026-10-02T05:13:06+00:00

A.I. is cool, but S.I. does seem to give out more golden age type vibes.

Thrive @thrivemeta · 2026-10-02T22:46:57+00:00

WHAT YOUR TOP 5 COINS? ASKING FOR A FRIEND Woof Woof

The Dogecoin cryptocurrency logo, featuring the Shiba Inu dog image overlaid with a large white 'D' on a gold-colored coin background.

AI visual analysis: The Dogecoin cryptocurrency logo, featuring the Shiba Inu dog image overlaid with a large white 'D' on a gold-colored coin background.

Interplanetary Dogecoin Advisor @johncarter6016 · 2026-10-02T15:04:12+00:00

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T19:59:30+00:00

I knew it!

A news-style meme with the headline 'SOUTH FLORIDA MOTHER CLAIMS DRINKING TOO MUCH COFFEE CAUSED HER BABY TO BE BORN BLACK,' showing a couple with their newborn in a hospital and Starbucks coffees in the corner (Prime Wire).

AI visual analysis: A news-style meme with the headline 'SOUTH FLORIDA MOTHER CLAIMS DRINKING TOO MUCH COFFEE CAUSED HER BABY TO BE BORN BLACK,' showing a couple with their newborn in a hospital and Starbucks coffees in the corner (Prime Wire).

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T18:58:37+00:00

A surreal close-up of a person's ear, showing miniature soldiers in camouflage uniforms marching in formation into the ear canal against a dark background.

AI visual analysis: A surreal close-up of a person's ear, showing miniature soldiers in camouflage uniforms marching in formation into the ear canal against a dark background.

Tang17 | TLuumd @Tang17vn · 2026-10-02T13:55:59+00:00

FROM DOGE TO DOGEOS Exploring a New Ecosystem Built Around DOGE @DogeOS

The Dogecoin Family @FamilyDogecoin · 2026-10-02T05:26:37+00:00

Gm

A white paper cup and a black Motorola two-way radio resting on a ledge beside an indoor swimming pool.

AI visual analysis: A white paper cup and a black Motorola two-way radio resting on a ledge beside an indoor swimming pool.

Kush @KushMetaX · 2026-10-02T03:09:19+00:00

Doginal Dogs Legends Brackets DDL Academy Bracket 11 Finalists @Lxpold vs @Reefmetax 0/2 Battling reigning champ @anthemhayek vs @Reefmetax 2/3 Champion @Reefmetax Congrats fam

A promotional graphic with a flame background announces 'DOGINAL DOGS LEGENDS BRACKETS DDL ACADEMY BRACKET II' with Finalists 'LX vs Reef 0/2', 'BATTLING REIGNING CHAMP Anthem vs Reef 2/3', and 'CHAMPION Reef'.

AI visual analysis: A promotional graphic with a flame background announces 'DOGINAL DOGS LEGENDS BRACKETS DDL ACADEMY BRACKET II' with Finalists 'LX vs Reef 0/2', 'BATTLING REIGNING CHAMP Anthem vs Reef 2/3', and 'CHAMPION Reef'.

Ð @DogeMemery · 2026-10-02T04:08:15+00:00

A little doge sunshine...for your thoughts.

Holistic ƉOGE 𝕏 @Doge4Faithful · 2026-10-02T01:40:51+00:00

You’re much wow Grok!basically

A digital illustration from Google depicting him with brown hair and a beard, wearing a red robe over a tan tunic, with his right hand raised in a gesture of greeting or blessing.

AI visual analysis: A digital illustration from Google depicting him with brown hair and a beard, wearing a red robe over a tan tunic, with his right hand raised in a gesture of greeting or blessing.

Ɖoge_Alb @doge_albania · 2026-10-02T17:01:57+00:00

Dogecoin

Rand Group @randgroup · 2026-10-02T10:21:36+00:00

Time to release the $DOGE to new highs

Lazo @lazodoge · 2026-10-02T02:48:58+00:00

Lock everything ✓

Kenshi Ðoge @KenshiDoge · 2026-10-02T05:59:43+00:00

Kenshi Doge on DogeOS soon

Mia_LinhChi @Mia_Linh01 · 2026-10-02T21:34:57+00:00

It's interesting to see how $DOGE took a dip despite its popularity. What do you think might be driving these fluctuations in its value?

JoeyDoge42069 @JoeyDoge42069 · 2026-10-02T21:08:42+00:00

QT with your Pumpkin art x.com/StormriderStor…

A pumpkin patch at sunset with vibrant purple and blue pumpkins scattered across the field, featuring a wooden fence and rustic barn in the background.

AI visual analysis: A pumpkin patch at sunset with vibrant purple and blue pumpkins scattered across the field, featuring a wooden fence and rustic barn in the background.

@Number6Weyoun @Number6Weyoun · 2026-10-02T20:38:19+00:00

Doge

A cyberpunk-style digital illustration featuring a Shiba Inu dog wearing futuristic armor and tech implants, set against a backdrop of a neon-lit cityscape.

AI visual analysis: A cyberpunk-style digital illustration featuring a Shiba Inu dog wearing futuristic armor and tech implants, set against a backdrop of a neon-lit cityscape.

XO @Ortix008 · 2026-10-02T18:08:27+00:00

Don’t miss out FOMO is high! Thank You Elon LFG

J U B A @JubaJeeves · 2026-10-02T10:26:35+00:00

Doge money best money

TurGox @Turkoinimchat · 2026-10-02T13:06:37+00:00

Dogeos Testnet Test Ağını Ekle portal.testnet.dogeos.comTest Tokeni Talep faucet.testnet.dogeos.comBridge İşlemi Yap portal.testnet.dogeos.com/bridgeEkosistem Projelerinde İşlem dogeos.com/ecosystemTestnet Nedir t.me/turkoinim/4534 .

A graphic featuring the Dogeos logo, the text 'such testnet,' the handwritten word 'wow,' and a 3D cube made of smaller blocks with dog faces and the words 'test' and 'net' on their faces.

AI visual analysis: A graphic featuring the Dogeos logo, the text 'such testnet,' the handwritten word 'wow,' and a 3D cube made of smaller blocks with dog faces and the words 'test' and 'net' on their faces.

Yuna Han @YunaElira · 2026-10-02T23:37:33+00:00

$DOG

Vee @veemeta · 2026-10-02T23:30:34+00:00

Doge is a winner

ALTF4 @0xALTF4 · 2026-10-02T12:06:41+00:00

doge stays loud

smolHedwig @smolKevinWcrumb · 2026-10-02T13:35:34+00:00

If there was ever a time to run a meme coin paired to Doge it be now… Just saying Hold and get paid doge . Doge to 1$ goal $4.20 Doeg to 1$ goal $4.20 31c4KhoLoYEfB9bUGysSYQcZ8EwgE8rZXeEDrLG7pump

Dogecoin marketing image with text 'Trade Dogecoin Earn Dogecoin' featuring two Doge Shiba Inu dogs, one holding a green up-arrow sign, alongside stacked gold Dogecoin coins.

AI visual analysis: Dogecoin marketing image with text 'Trade Dogecoin Earn Dogecoin' featuring two Doge Shiba Inu dogs, one holding a green up-arrow sign, alongside stacked gold Dogecoin coins.

John Pham @VPhm23380671 · 2026-10-02T08:39:49+00:00

DogeOS? Sounds like a paw-sitive upgrade

Ni - lucky @ni_celeb · 2026-10-02T14:26:18+00:00

doge with utility finally? interesting play

Self Made @madenotgiven · 2026-10-02T22:02:20+00:00

$DOG > $DOGE

奶牛叔 @WWTLitee · 2026-10-02T02:21:20+00:00

Beating the dog every day and still getting to claim dividends—pretty unexpected.

TroubleLow3825 @reddit · 2026-10-02T18:04:10.923000+00:00

$PEP is your next 1000x gem $PEP is a frog themed memeCOIN (NOT TOKEN!) with its own blockchain. It's simply better and has better use cases than all the other pepe themed tokens. A lot of people already use it as it has cheap transaction fees, it's merge mineable with DOGE and LTC, you can mint NFTs on it etc etc. It's a whole ecosystem not just a token made for pump and dump. The project has been around since January of 2024 and the devs are still working on it and delivering just like they did from day one. It's a legit crypto project and community just like DOGE was in It's early days.

Lynn @NKLinhzk · 2026-10-02T17:21:47+00:00

whales going hard on $DOGE

DeRizvi @Rizvi_On_X · 2026-10-02T15:32:35+00:00

DogeOS testnet sounds fun, but I need to see real usage.

smolHedwig @smolKevinWcrumb · 2026-10-02T08:17:16+00:00

We could have all just bought Doeg pushed it and got it to actually run . Zero sell pressure from KOLs. Yet we chose fast money. And ended rugged. Return to tradition return holding and bulliving Doge to 1$ Doeg to 1$ .

A parody of Michelangelo's 'The Creation of Adam' where the figure of Adam has been humorously replaced with a Shiba Inu dog meme.

AI visual analysis: A parody of Michelangelo's 'The Creation of Adam' where the figure of Adam has been humorously replaced with a Shiba Inu dog meme.

Lynn @NKLinhzk · 2026-10-02T01:39:28+00:00

doge is taking the leap tbh