🤖 AI Agent Friendly: This page is available in clean token-optimized Markdown.
View as .md

$BTC Catalyst Posts

July 02, 2026

Single-day social intelligence recap and verified catalyst posts · ← Back to $BTC Profile · Market Rankings

💬 Curated Viral Posts & Community Evidence

500 source posts analyzed
Alexa @alexa__meme · 2026-07-02T12:32:19+00:00

Bitcoin since 2024:

BitcoinTreasuries.NET @BTCtreasuries · 2026-07-02T15:22:29+00:00

JUST IN: Wall Street analyst Mark Palmer just said live on CNBC that "Strategy $MSTR could surge to $570 by the end of this year if #Bitcoin reaches $95k." "Strategy's capital structure is in a remarkably strong position if BTC price were to increase."

Watcher.Guru @WatcherGuru · 2026-07-02T17:13:22+00:00

JUST IN: $4.7 trillion JPMorgan warns Michael Saylor's 'Strategy' is creating a new risk for the Bitcoin market.

The image displays the white "J.P.Morgan" logo against a black background, representing the bank that issued the warning about Michael Saylor's "Strategy" (formerly MicroStrategy) creating new risks for the Bitcoin market in light of its $4.7 trillion valuation concerns.

AI visual analysis: The image displays the white "J.P.Morgan" logo against a black background, representing the bank that issued the warning about Michael Saylor's "Strategy" (formerly MicroStrategy) creating new risks for the Bitcoin market in light of its $4.7 trillion valuation concerns.

Michael Saylor @saylor · 2026-07-02T19:11:41+00:00

This week at Goldman Sachs’ Digital Assets Conference in London, I discussed Bitcoin, Digital Credit, and the future of capital markets. Extraordinary venue. Exceptional audience.

A speaker presents at Goldman Sachs' Digital Assets Conference in London, addressing a packed auditorium in a wood-paneled amphitheater with a large screen displaying presentation slides. The setting reflects the post's mention of an "extraordinary venue" and "exceptional audience" gathered to discuss Bitcoin, digital credit, and the future of capital markets.

AI visual analysis: A speaker presents at Goldman Sachs' Digital Assets Conference in London, addressing a packed auditorium in a wood-paneled amphitheater with a large screen displaying presentation slides. The setting reflects the post's mention of an "extraordinary venue" and "exceptional audience" gathered to discuss Bitcoin, digital credit, and the future of capital markets.

Crypto Rover @cryptorover · 2026-07-02T09:00:02+00:00

THIS BITCOIN CHART LOOKS VERY SCARY. Every cycle, BTC goes through one final panic phase before the real breakout starts. 2018: $19K → $3K 2021: $69K → $15K While I don’t think we drop this low again, the bottom is probably not in yet.

Watcher.Guru @WatcherGuru · 2026-07-02T14:05:53+00:00

JUST IN Bitcoin reclaims $62,000.

A Bitcoin/USD candlestick chart shows a recent price surge from around $60,000 to $62,027.99, illustrating the cryptocurrency reclaiming the $62,000 mark. The chart displays the uptrend with green and red candles across price levels from $60,200 to $62,027.99.

AI visual analysis: A Bitcoin/USD candlestick chart shows a recent price surge from around $60,000 to $62,027.99, illustrating the cryptocurrency reclaiming the $62,000 mark. The chart displays the uptrend with green and red candles across price levels from $60,200 to $62,027.99.

TraderS | 缺德道人 @Trader_S18 · 2026-07-02T11:13:32+00:00

Just one day in, and the market seems to have reversed course entirely Yesterday, I mentioned that rate hike expectations might have already peaked, with the US dollar index topping out as well. After Powell's speech took effect, we're already seeing some results today. Powell

A Chinese financial data table showing U.S. economic indicators: the June unemployment rate at 4.30% (forecast and actual 4.30%) and non-farm payrolls at 17.2 (forecast 11), both with 5-star impact ratings.

AI visual analysis: A Chinese financial data table showing U.S. economic indicators: the June unemployment rate at 4.30% (forecast and actual 4.30%) and non-farm payrolls at 17.2 (forecast 11), both with 5-star impact ratings.

Watcher.Guru @WatcherGuru · 2026-07-02T08:04:24+00:00

JUST IN: Metaplanet buys 2,823 Bitcoin worth $170,000,000. They now hold 43,000 $BTC worth $2.58 billion.

The image displays the MetaPlanet logo featuring a stylized "M" with a geometric triangle pattern inside an orange circle. This branding accompanies news that MetaPlanet has purchased 2,823 Bitcoin ($170 million), bringing their total holdings to 43,000 BTC valued at $2.58 billion.

AI visual analysis: The image displays the MetaPlanet logo featuring a stylized "M" with a geometric triangle pattern inside an orange circle. This branding accompanies news that MetaPlanet has purchased 2,823 Bitcoin ($170 million), bringing their total holdings to 43,000 BTC valued at $2.58 billion.

Ash Crypto @AshCrypto · 2026-07-02T06:46:16+00:00

Someone bought 10,000 Bitcoin in 2011 for $7,805 when BTC was trading at $0.78. He survived multiple crashes and held for nearly 14 years without touching a single coin. Then in 2025 he sold it for over $1 Billion, making a 128,205x return.

A Bitcoin transaction history showing an original purchase of +10,000 BTC on 2011-04-02 at $0.78 per coin ($7,805 total), held untouched for nearly 14 years until being sold as -10,000.01141274 BTC on 2025-07-03 at $109,246.3 per coin, illustrating the legendary 128,205x return mentioned in the post.

AI visual analysis: A Bitcoin transaction history showing an original purchase of +10,000 BTC on 2011-04-02 at $0.78 per coin ($7,805 total), held untouched for nearly 14 years until being sold as -10,000.01141274 BTC on 2025-07-03 at $109,246.3 per coin, illustrating the legendary 128,205x return mentioned in the post.

reubs @reubs_btc · 2026-07-02T10:08:33+00:00

These are the 2026 year-to-date charts for a few @Stacks tokens that I am bidding at these levels - $BTC / sBTC (~$60k) Obvious one first, I think we chop for another few months and then see a lot higher into end of 2026 / 2027 - $STX (~0.16c / 300M FDV) Now has clear value

This image displays 2026 year-to-date charts for various Stacks tokens, including $BTC (sBTC ~$60k), $STX (~0.16c / 300M FDV), Leo, ALEX Token, Pope Coin, and Flat Earth Platinum, aligning with the provided post about bidding on these tokens.

AI visual analysis: This image displays 2026 year-to-date charts for various Stacks tokens, including $BTC (sBTC ~$60k), $STX (~0.16c / 300M FDV), Leo, ALEX Token, Pope Coin, and Flat Earth Platinum, aligning with the provided post about bidding on these tokens.

Binance @binance · 2026-07-02T06:01:47+00:00

The next Bitcoin halving is now <100,000 blocks away.

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T21:53:01+00:00

JUST IN: President Donald Trump says “crypto is a BIG deal.” “Anything we do I want to be #1 in. And we’re #1 in crypto.”

Coin Bureau @coinbureau · 2026-07-02T09:10:07+00:00

HUGE: FBI DIRECTOR CAUGHT HIDING SIX-FIGURE MSTR BUY FOR 6 MONTHS Kash Patel failed to disclose his $100K-$250K Strategy stock $MSTR purchase on time after what his team called a "miscommunication." Under the STOCK Act, senior officials must report trades above $1,000 within

A man identified as FBI Director Kash Patel stands in profile wearing a navy FBI jacket with the agency patch visible, set against a flag backdrop. The image accompanies news about his late disclosure of a $100K-$250K purchase of MicroStrategy ($MSTR) stock, as required by the STOCK Act.

AI visual analysis: A man identified as FBI Director Kash Patel stands in profile wearing a navy FBI jacket with the agency patch visible, set against a flag backdrop. The image accompanies news about his late disclosure of a $100K-$250K purchase of MicroStrategy ($MSTR) stock, as required by the STOCK Act.

102.btc @102BTC · 2026-07-02T12:15:18+00:00

Is this why Harland has so many fans?

Dylan LeClair @DylanLeClair · 2026-07-02T07:07:09+00:00

Metaplanet now holds 43,000 BTC ($2.6B), with total debt and prefs at 23% of BTC NAV. The balance sheet is robust, the capital channels are being built, and the asset we exist to accumulate is on sale. Forward. $BTC $MPJPY

The image is a Metaplanet announcement graphic with the tagline "Secure the Future with Bitcoin" and headline stating "Metaplanet Acquires 2823 BTC; Achieves BTC Yield of 9.59% YTD; Now Holds 43000 BTC," visually reinforcing the post's news of the company's expanded Bitcoin treasury holdings and ongoing accumulation strategy.

AI visual analysis: The image is a Metaplanet announcement graphic with the tagline "Secure the Future with Bitcoin" and headline stating "Metaplanet Acquires 2823 BTC; Achieves BTC Yield of 9.59% YTD; Now Holds 43000 BTC," visually reinforcing the post's news of the company's expanded Bitcoin treasury holdings and ongoing accumulation strategy.

Francis CGL @francis_cgl · 2026-07-02T14:22:22+00:00

Every strong ecosystem grows one connection at a time. Today, the TRON story added another chapter. Through the latest integration, users can now access TRX, JST, SUN, USDD, and WBTC on JustLend DAO directly via @BinanceWallet . It’s more than adding support for a few assets.

Alex Mason @AlexMasonCrypto · 2026-07-02T15:14:54+00:00

Mark my words. Bitcoin will close the FVG at $67K. Then the real move begins. Here is how Bitcoin plays out from here: - Rally to $67K - 10–14 days of distribution - Dump below $58K - Flush to $47K - Final bottom test in the $37K–$45K zone Most people think the

𝗰𝘆𝗰𝗹𝗼𝗽 @nobrainflip · 2026-07-02T20:16:08+00:00

I've been trading for 9 years and never seen so much stacked long liquidity on a single level Once we reach 58K, dump will be brutal There will be $2B liquidations with a final huge crash that will mark this cycle bottom Throughout this cycles' market has been purely driven by

Simon Gerovich @gerovich · 2026-07-02T09:03:03+00:00

Metaplanet acquired an additional 2,823 BTC in Q2. Total holdings: 43,000 BTC. Still climbing. Never stopping.

A treasury dashboard shows Metaplanet's Bitcoin holdings reaching 43,000 BTC (valued at $2,599,350,257.46) following a 7-day and 30-day increase of 2,823 BTC ($170,650,350.18), with a balance history chart illustrating steady accumulation from May through July that reinforces the post's message of continuous, aggressive BTC accumulation.

AI visual analysis: A treasury dashboard shows Metaplanet's Bitcoin holdings reaching 43,000 BTC (valued at $2,599,350,257.46) following a 7-day and 30-day increase of 2,823 BTC ($170,650,350.18), with a balance history chart illustrating steady accumulation from May through July that reinforces the post's message of continuous, aggressive BTC accumulation.

Metaplanet Inc. @Metaplanet · 2026-07-02T06:34:04+00:00

Metaplanet adds another 2,823 BTC of Bitcoin, bringing total holdings to 43,000 BTC

A MetaPlanet advertisement with the tagline 'Secure the Future with Bitcoin,' showing a glowing Bitcoin sphere and Japanese text announcing the acquisition of 2,823 BTC, achieving a 9.59% BTC yield year-to-date, bringing holdings to 43,000 BTC.

AI visual analysis: A MetaPlanet advertisement with the tagline 'Secure the Future with Bitcoin,' showing a glowing Bitcoin sphere and Japanese text announcing the acquisition of 2,823 BTC, achieving a 9.59% BTC yield year-to-date, bringing holdings to 43,000 BTC.

Crypto Rover @cryptorover · 2026-07-02T06:42:00+00:00

BITCOIN BULLISH DIVERGENCE!!!

Vivek Sen @Vivek4real_ · 2026-07-02T18:47:00+00:00

BREAKING: RUSSIA'S CENTRAL BANK FINALLY JUST ANNOUNCED TO LEGALIZE BITCOIN AND CRYPTO FOR INTERNATIONAL TRADE HERE WE GO

In this image, Vladimir Putin makes a gesture with his finger against the backdrop of the Russian flag. This visually connects to the breaking news that Russia's central bank is reportedly legalizing Bitcoin and crypto for international trade.

AI visual analysis: In this image, Vladimir Putin makes a gesture with his finger against the backdrop of the Russian flag. This visually connects to the breaking news that Russia's central bank is reportedly legalizing Bitcoin and crypto for international trade.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T18:39:12+00:00

BREAKING: RUSSIA CENTRAL BANK JUST ANNOUNCED IT WILL LEGALIZE #BITCOIN AND CRYPTO FOR INTERNATIONAL TRADE AS EARLY AS SEPTEMBER RUSSIA IS ABOUT TO PASS A MAJOR CRYPTO LAW BEFORE AMERICA THIS IS A DIRECT MOVE TO BYPASS WESTERN SANCTIONS AND THE US DOLLAR NATION-STATE GAME

This image displays the iconic Bitcoin (BTC) logo against an orange background, visually representing the subject of the accompanying post about Russia announcing the legalization of Bitcoin and crypto for international trade.

AI visual analysis: This image displays the iconic Bitcoin (BTC) logo against an orange background, visually representing the subject of the accompanying post about Russia announcing the legalization of Bitcoin and crypto for international trade.

zerohedge @zerohedge · 2026-07-02T18:06:09+00:00

Worst two days on record for memory Best two days for Bitcoin since the Iran war started

Vivek Sen @Vivek4real_ · 2026-07-02T17:42:00+00:00

ELON MUSK: “I'M NOT GOING TO BE PROMOTING CRYPTO, AT MOST, IN A JOKING WAY. IF YOU SEE ME PUMPING CRYPTO, IT'S NOT ME. I DO THINK THERE'S MERIT IN BITCOIN. I'VE SORT OF GOT A SOFT SPOT FOR DOGECOIN BECAUSE I LIKE DOGS AND MEMES.”

Kalshi Crypto @Kalshi_Crypto · 2026-07-02T17:16:11+00:00

JUST IN: JPMorgan warns Michael Saylor's 'Strategy' is a risk for Bitcoin

Kalshi @Kalshi · 2026-07-02T20:27:18+00:00

JUST IN: 15% chance Bitcoin hits $100K this year

BITCOINLFG® @bitcoinlfgo · 2026-07-02T02:55:29+00:00

PRESIDENT TRUMP: “#BITCOIN AND CRYPTO WILL SKYROCKET LIKE NEVER BEFORE, BEYOND YOUR EXPECTATIONS.” BULL MARKET COMING

This image shows a digitally rendered gold Bitcoin coin, with flames licking its edges to symbolize a "bull market" or significant price increase, as suggested by the accompanying post. The text visible on the coin reads "BITCOIN DIGITAL DECENTRALIZED".

AI visual analysis: This image shows a digitally rendered gold Bitcoin coin, with flames licking its edges to symbolize a "bull market" or significant price increase, as suggested by the accompanying post. The text visible on the coin reads "BITCOIN DIGITAL DECENTRALIZED".

*Walter Bloomberg @DeItaone · 2026-07-02T16:56:49+00:00

TIGER RESEARCH TURNS MORE BULLISH ON BITCOIN Tiger Research says it is becoming more constructive on Bitcoin, arguing the market is likely in the final stage of its bear cycle. The firm believes most of the selloff has already occurred, with any further weakness likely limited.

PlanB @100trillionUSD · 2026-07-02T11:44:40+00:00

Bitcoin metrics used to cost thousands per year. BlockHorizon just opened everything up, 100% FREE data & charts: All metrics, daily updates Full historic data Unlimited alerts CSV+XLS+JSON downloads Same data as other providers. No paywall blockhorizon.io

A BlockHorizon dashboard displaying Bitcoin metrics including PlanB stock-to-flow, realized prices (currently $19,803), percentage supply in profit (around 75%), and spent output age bands, promoting the platform's free access to crypto analytics data at blockhorizon.io.

AI visual analysis: A BlockHorizon dashboard displaying Bitcoin metrics including PlanB stock-to-flow, realized prices (currently $19,803), percentage supply in profit (around 75%), and spent output age bands, promoting the platform's free access to crypto analytics data at blockhorizon.io.

Ash Crypto @AshCrypto · 2026-07-02T13:39:58+00:00

Bitcoin just hit $62,000. ETH is back above $1,700. $140M shorts liquidated in 60 minutes. $135 Billion added to Crypto in 2 days.

A Binance BTC/USDT price chart shows Bitcoin at $62,003.99, up 5.22%, with a 24-hour high of $62,053.00, visually confirming the post's claim that Bitcoin has just hit the $62,000 milestone.

AI visual analysis: A Binance BTC/USDT price chart shows Bitcoin at $62,003.99, up 5.22%, with a 24-hour high of $62,053.00, visually confirming the post's claim that Bitcoin has just hit the $62,000 milestone.

Aralez @0xAralez · 2026-07-02T13:30:29+00:00

DON'T SHORT $BTC HERE $BTC to $62K - just start of FVG pullback... I'm planning to open the biggest short position of my life: Entry: $69k Take Profit: $59k / $50k Stop Loss: $78k Limit orders are set - waiting for market reaction Turn on notifs so you don't miss next

Emin Yurumazu (エミンユルマズ) @yurumazu · 2026-07-02T17:41:58+00:00

Semiconductor stocks are being sold off, and money is flowing into old economy stocks, Bitcoin, and gold, huh.

John Bollinger @bbands · 2026-07-02T18:39:35+00:00

Here is a chart highlighting a developing 'W' pattern in $BTC . Note that it is perfectly fractal. The are small 'w's at the nadirs and a small 'm' at the apex. For extra credit look at the weekly to see a higher time frame fractal 'W'.

Ash Crypto @AshCrypto · 2026-07-02T09:49:16+00:00

Bitcoin has reclaimed $61,00 ETH is back above $1,600 Looks like we might get a Summer pump before the final Sept-Oct bottom dump.

A Binance BTC/USDT trading chart shows Bitcoin at $61,149.34, up 3.86% with a 24-hour high of $61,334.00, visually confirming the post's claim that Bitcoin has reclaimed the $61,000 level.

AI visual analysis: A Binance BTC/USDT trading chart shows Bitcoin at $61,149.34, up 3.86% with a 24-hour high of $61,334.00, visually confirming the post's claim that Bitcoin has reclaimed the $61,000 level.

WIZZ @CryptoWizardd · 2026-07-02T17:43:51+00:00

Many ask me wizz what you think btc will do. Well my view didnt change yet. As long as we remain 60/59 k as bottom. I see this happening the coming months. Until now still valid. #BTC

A Bitcoin/USD chart showing BTC at $60,481.54 (-0.90%), with annotations predicting a "next bearmarket bottom below" the current support level around $60-59K, consistent with the poster's view that as long as $60/59K holds as a bottom, further bearish action is expected in the coming months.

AI visual analysis: A Bitcoin/USD chart showing BTC at $60,481.54 (-0.90%), with annotations predicting a "next bearmarket bottom below" the current support level around $60-59K, consistent with the poster's view that as long as $60/59K holds as a bottom, further bearish action is expected in the coming months.

OP_CAT Layer | Mainnet Live @op_catlayer · 2026-07-02T14:04:00+00:00

The mission of OP_CAT Layer is to unlock Bitcoin’s execution layer.

Two performers perched atop a tall pole or mast against a backdrop of glass skyscrapers, with a large blue flag bearing a white circle logo flying beside them.

AI visual analysis: Two performers perched atop a tall pole or mast against a backdrop of glass skyscrapers, with a large blue flag bearing a white circle logo flying beside them.

大宇 @BTCdayu · 2026-07-02T03:53:17+00:00

"I told you long ago, Little Za, you can't sell computing power!"

The image shows a man in a black jacket surrounded and pointed at by a crowd of men in suits, with visible sponsor signs including "TESLA" and "Nokia Summit." 

The scene visually echoes the post's caption about Mark Zuckerberg being criticized by tech industry figures for selling compute power, depicting a tense confrontation where the central figure is being accused and surrounded by aggressive onlookers.

AI visual analysis: The image shows a man in a black jacket surrounded and pointed at by a crowd of men in suits, with visible sponsor signs including "TESLA" and "Nokia Summit." The scene visually echoes the post's caption about Mark Zuckerberg being criticized by tech industry figures for selling compute power, depicting a tense confrontation where the central figure is being accused and surrounded by aggressive onlookers.

isa @isabellasg3 · 2026-07-02T15:25:17+00:00

the bitcoin culture is dead and nobody wants to admit it

Ash Crypto @AshCrypto · 2026-07-02T12:13:07+00:00

Bitcoin pump to $80k in August ? In the 2022 bear market: - BTC local bottom of $17,600 in June - Then +42% pump through August - Made its ultimate cycle bottom in November 2022 around $15,500. We're seeing a similar setup now. If history repeats, Bitcoin could rally into

The image shows two side-by-side Bitcoin price charts comparing the 2022 and 2026 market cycles, highlighting analogous patterns: a "Peak" at the top of each chart, a "June Local Bottom" (with $17,600 marked in 2022 and June 2026), and a projected "+42%" rally toward August with "???" near the $69,000 level, mirroring the historical post-June bottom recovery before the cycle low in November 2022 around $15,500.

AI visual analysis: The image shows two side-by-side Bitcoin price charts comparing the 2022 and 2026 market cycles, highlighting analogous patterns: a "Peak" at the top of each chart, a "June Local Bottom" (with $17,600 marked in 2022 and June 2026), and a projected "+42%" rally toward August with "???" near the $69,000 level, mirroring the historical post-June bottom recovery before the cycle low in November 2022 around $15,500.

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T19:30:58+00:00

JUST IN: SEC Chairman Paul Atkins delivers speech on the Clarity Act: "We are taking historic steps to modernize our rules and regulations to facilitate markets' moving on-chain."

Anonim Muhabir @anonimuhabir · 2026-07-02T17:39:25+00:00

The young person who wanted to pay off a 1 million TL debt by selling satarak, showed the sales made in 1 day: "I'm responding to the messages from the ad I opened yesterday. I got my first order, the king took two. I'm immediately checking all the messages on Instagram one by

Killa @KillaXBT · 2026-07-02T18:46:26+00:00

Nothing has changed with my $BTC swing long. I'm expecting to hold this for 1.5–2 years. I expect BTC above 80K in Q1 next year, and above 110K around Q4 2027. ~488 days to go. If you can't be patient, don't follow me. However, you might regret it later.

A candlestick chart of Bitcoin (BTC) showing key levels including an ETA 100K REQION around $102,939, ETA 110K REQION near $141,744, ETA 80K REQION at $92,321, and a swing entry leverage level near $95,727, with a "manipulation period" shaded at the bottom illustrating the trader's long-term bullish swing position outlined in the post.

AI visual analysis: A candlestick chart of Bitcoin (BTC) showing key levels including an ETA 100K REQION around $102,939, ETA 110K REQION near $141,744, ETA 80K REQION at $92,321, and a swing entry leverage level near $95,727, with a "manipulation period" shaded at the bottom illustrating the trader's long-term bullish swing position outlined in the post.

Crypto Rover @cryptorover · 2026-07-02T19:22:00+00:00

FED CHAIR KEVIN WARSH: "Bitcoin doesn't make me nervous." "If you're under 40, Bitcoin is your new gold."

I can't help identify the specific individuals in the image. However, I can describe what I see: a man wearing sunglasses, a navy blue suit, white shirt, and dark tie, waving with his hand raised, accompanied by a woman with curly dark hair in dark attire, both walking outdoors with green foliage in the background. If you could confirm the identities, I'd be happy to help craft a caption that connects the image to the post about Federal Reserve Chair Kevin Warsh's comments on Bitcoin.

AI visual analysis: I can't help identify the specific individuals in the image. However, I can describe what I see: a man wearing sunglasses, a navy blue suit, white shirt, and dark tie, waving with his hand raised, accompanied by a woman with curly dark hair in dark attire, both walking outdoors with green foliage in the background. If you could confirm the identities, I'd be happy to help craft a caption that connects the image to the post about Federal Reserve Chair Kevin Warsh's comments on Bitcoin.

based16z @based16z · 2026-07-02T06:46:22+00:00

Bitcoin 250k in one monthly candle after Trump takes 20% Strategy stake

Lucky @LLuciano_BTC · 2026-07-02T16:59:21+00:00

High leverage meets perfect technical timing. Bitcoin is pushing an aggressive recovery toward a crucial breakout. Let's see how this plays out.

A TradingView chart of Bitcoin (BTC) against USDT on a 4-hour timeframe, marked by analyst Lucky (@LLuciano_BTC), displays a descending channel pattern with multiple circled points indicating resistance touches along the upper trendline and a labeled "BreakOut" near $61,798, with a green arrow highlighting an aggressive recovery push — visually reinforcing the post's claim of "high leverage meets perfect technical timing" as price tests the channel's upper boundary.

AI visual analysis: A TradingView chart of Bitcoin (BTC) against USDT on a 4-hour timeframe, marked by analyst Lucky (@LLuciano_BTC), displays a descending channel pattern with multiple circled points indicating resistance touches along the upper trendline and a labeled "BreakOut" near $61,798, with a green arrow highlighting an aggressive recovery push — visually reinforcing the post's claim of "high leverage meets perfect technical timing" as price tests the channel's upper boundary.

CryptoReviewing @CryptoReviewing · 2026-07-02T13:46:38+00:00

This is genuinely insane. On Monday, $BTC pumped from $58,800 to $60,600 liquidating $287M! On Tuesday, $BTC dumped back to $57,700 liquidating another $268M! Then yesterday, $BTC immediately pumped back to $61,200 liquidating $527M more! And today, $BTC pumped further to

Bitcoin Archive @BitcoinArchive · 2026-07-02T12:53:19+00:00

- Classic Bullish Divergence on the Bitcoin weekly chart. - This signalled the bottom of the last bear market. Don't be left behind...

A TradingView Bitcoin/U.S. Dollar chart from July 2, 2026, annotated with 'Bullish Divergence' showing price making higher lows while the RSI indicator makes lower lows, with BTC at $61,383.

AI visual analysis: A TradingView Bitcoin/U.S. Dollar chart from July 2, 2026, annotated with 'Bullish Divergence' showing price making higher lows while the RSI indicator makes lower lows, with BTC at $61,383.

Digital Asset Investor @digitalassetbuy · 2026-07-02T11:01:19+00:00

He can talk about Bitcoin He can talk about Dogecoin He can talk about Ethereum He can't talk about XRP @elonmusk

Channel 4 News @Channel4News · 2026-07-02T14:59:06+00:00

'Right now it's touching 500 million people - there's no reason it can't touch 5 billion people.' His company owns nearly 850,000 Bitcoins worth tens of billions of dollars - with the price of the coins dropping by nearly 50% in just one year we spoke to Michael Saylor at the

Teddy - PolyBackTest.com @Bitcoin_Teddy · 2026-07-02T23:07:00+00:00

He believed he was being kind...

zerohedge @zerohedge · 2026-07-02T13:17:04+00:00

Kospi tumbles, bitcoin spikes

Metaplanet Inc. @Metaplanet · 2026-07-02T06:48:38+00:00

*Metaplanet Acquires Additional 2,823 Bitcoin, Total Holdings Reach 43,000 BTC*

A Metaplanet announcement graphic with a glowing Bitcoin sphere in space, stating 'Metaplanet Acquires 2823 BTC; Achieves BTC Yield of 9.59% YTD; Now Holds 43000 BTC' under the tagline 'Secure the Future with Bitcoin'.

AI visual analysis: A Metaplanet announcement graphic with a glowing Bitcoin sphere in space, stating 'Metaplanet Acquires 2823 BTC; Achieves BTC Yield of 9.59% YTD; Now Holds 43000 BTC' under the tagline 'Secure the Future with Bitcoin'.

Bitcoin Intelligence @BitcoinIntelX · 2026-07-02T21:35:38+00:00

Giving away 0.1 $BTC to a random person! As promised, I’m sending 0.1 BTC (~$6,000) to one lucky follower. Like, retweet and comment 'BTC' to enter. * If you’re not following, you will be disqualified. Winner announced in 24h! Comments will be locked after 24 hours, the

A dark promotional graphic features orange Bitcoin coin icons and bold white text reading "0.1 BTC GIVEAWAY for the Bitcoin Halving!" with decorative gold dot accents, accompanying an announcement of a 0.1 BTC (~6,000) giveaway where followers must like, retweet, comment "BTC," and follow to enter.

AI visual analysis: A dark promotional graphic features orange Bitcoin coin icons and bold white text reading "0.1 BTC GIVEAWAY for the Bitcoin Halving!" with decorative gold dot accents, accompanying an announcement of a 0.1 BTC (~6,000) giveaway where followers must like, retweet, comment "BTC," and follow to enter.

Mr.₿itcoin @coinspace_ · 2026-07-02T11:55:00+00:00

#Bitcoin will bottom out in just a few more months and usher in a 3-year bull market. At that time, those who know nothing will call us lucky. But that's not true. We've tasted the despair you never knew, and being in the minority wasn't easy. We deserve to be

Ryker @Ryker_Crypto · 2026-07-02T12:25:49+00:00

ETH/BTC break out is a sign of Altcoin season Focus on low-cap under $50M market cap is so safe and big opportunity 5x 10x

The image shows an Ethereum/Bitcoin (ETH/BTC) 1-day Binance chart displaying a breakout above a descending trendline from a horizontal support zone around 0.035 BTC, with a green arrow projecting upward price movement. This visualizes the post's claim that the ETH/BTC breakout signals the onset of an altcoin season, suggesting that low-cap altcoins under $50M market cap could deliver 5x–10x returns.

AI visual analysis: The image shows an Ethereum/Bitcoin (ETH/BTC) 1-day Binance chart displaying a breakout above a descending trendline from a horizontal support zone around 0.035 BTC, with a green arrow projecting upward price movement. This visualizes the post's claim that the ETH/BTC breakout signals the onset of an altcoin season, suggesting that low-cap altcoins under $50M market cap could deliver 5x–10x returns.

先手 · Ahead @yangyue992125 · 2026-07-02T04:51:25+00:00

Justin Sun’s controversies are so massive I don’t need to spell them out, but if you pull up everything he’s said over the past couple of years and check them against reality, you’ll spot one thing: he really nails his bets. In 2016, at age 26, he wrote *The Road to Financial

Mike Alfred @mikealfred · 2026-07-02T12:53:12+00:00

It was literally just 5 days ago when “Bitcoiners” were holding Spaces to circle jerk each other in to a frenzy about the impending collapse of Strategy. Now MSTR is back near $100 and SATA and STRC are headed back to target. Another perfect example of why most people aren’t rich

Edward T. Winslow @EdwardTWinz · 2026-07-02T09:52:27+00:00

I said that if $BTC reached $61,000, I’d give away $20,000 in Bitcoin to 15 people. Well, we made it. As promised, I’m giving away $20,000 in $BTC to 15 lucky winners today. To enter: Like Retweet Comment “BTC” Entries close in 24 hours. Good luck!

A Binance BTC/USDT trading chart shows Bitcoin's price at $61,149.34, up 3.86%, with a recent high of $61,213.81—visually confirming that BTC has surpassed the $61,000 threshold the poster promised as the trigger for their $20,000 Bitcoin giveaway to 15 winners.

AI visual analysis: A Binance BTC/USDT trading chart shows Bitcoin's price at $61,149.34, up 3.86%, with a recent high of $61,213.81—visually confirming that BTC has surpassed the $61,000 threshold the poster promised as the trigger for their $20,000 Bitcoin giveaway to 15 winners.

Grant Cardone @GrantCardone · 2026-07-02T02:00:58+00:00

RECORD: Whales load up 270,000 BTC

华尔街没有名字 @WallStreet0Name · 2026-07-02T09:45:44+00:00

Storage Plummets, Yet Bitcoin Stands Tall What's going on? Teachers

Xaif Crypto @Xaif_Crypto · 2026-07-02T18:02:46+00:00

BOOM!!!! White House War Room Director Ian Kelley's financial disclosure shows $XRP holdings ($1K–$15K range) via Coinbase wallet, alongside BTC, ETH,

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T20:47:39+00:00

JUST IN: $383 million Miller Value Partners tells CNBC that the fundamental case for Bitcoin "has never been stronger" “Bitcoin is a hedge against” an inflationary debt spiral

Thomas (Tom) Lee (not drummer) FundstratDirect.com @fundstrat · 2026-07-02T17:12:32+00:00

There are reason for $ETH / $BTC price ratio to rise in 2H2026 - in short, ETH is money narrative likely gains traction See below

The image displays a 1-month candlestick chart of the ETHBTC trading pair on Binance, showing Ethereum's price relative to Bitcoin at 0.02753 BTC, with a 2.69% gain today but a 1.99% decline over the past month. This ratio visualization supports the post's bullish thesis on ETH/BTC for 2H2026, illustrating the current depressed valuation that could appreciate if Ethereum's "money" narrative gains traction.

AI visual analysis: The image displays a 1-month candlestick chart of the ETHBTC trading pair on Binance, showing Ethereum's price relative to Bitcoin at 0.02753 BTC, with a 2.69% gain today but a 1.99% decline over the past month. This ratio visualization supports the post's bullish thesis on ETH/BTC for 2H2026, illustrating the current depressed valuation that could appreciate if Ethereum's "money" narrative gains traction.

Francis CGL @francis_cgl · 2026-07-02T14:53:14+00:00

A sharp BTC call turned into a fast move. Spotting momentum early, a long position on BTCUSDT perpetual was opened at around $59.8K using 20x cross. Hours later, the position is up +55.89% and still running. This is what happens when timing and conviction align with leverage

The image shows an HTX trade confirmation for a BTCUSDT perpetual long position with 20x cross leverage, showing a PnL of +55.89% after entering at $59,791.2 with the current price at $61,462.3. It visually reinforces the post's claim of a successful momentum trade, highlighting the entry price, leverage, and unrealized gains from a well-timed BTC long.

AI visual analysis: The image shows an HTX trade confirmation for a BTCUSDT perpetual long position with 20x cross leverage, showing a PnL of +55.89% after entering at $59,791.2 with the current price at $61,462.3. It visually reinforces the post's claim of a successful momentum trade, highlighting the entry price, leverage, and unrealized gains from a well-timed BTC long.

bull market genius @bull_genius · 2026-07-02T11:48:19+00:00

insilico leledc indicator painted an EXTREMELY rare green dorito on the $BTC weekly chart. massive rsi bull div forming as well on HTF first green dorito in 4 years, last time it flashed in nov 2022 at cycle bottom zoom out, keep it simple cleanse your mind a new

A weekly Bitcoin/USDT perpetual contract chart on Binance showing BTC's price journey from 2020 to 2027, peaking around $123,300 in 2025 before declining to approximately $57,758, with a rare green "dorito" indicator marking a potential cycle bottom alongside an RSI bull divergence near 35.24.

AI visual analysis: A weekly Bitcoin/USDT perpetual contract chart on Binance showing BTC's price journey from 2020 to 2027, peaking around $123,300 in 2025 before declining to approximately $57,758, with a rare green "dorito" indicator marking a potential cycle bottom alongside an RSI bull divergence near 35.24.

Benjamin Cowen @benjamincowen · 2026-07-02T13:00:46+00:00

NFA Live! Bitcoin Hit a New Low

▶ Video Content Summary

[video-unavailable: could not fetch or sample]

Ash Crypto @AshCrypto · 2026-07-02T03:42:22+00:00

BREAKING : BlackRock ETF has sold $219,410,000 worth of Bitcoin.

A close-up shows an older man in a dark suit, purple tie, and glasses looking downward with a somber expression. The serious demeanor aligns with the breaking news that BlackRock's ETF has sold $219,410,000 worth of Bitcoin, suggesting a heavy moment for the financial or crypto industry.

AI visual analysis: A close-up shows an older man in a dark suit, purple tie, and glasses looking downward with a somber expression. The serious demeanor aligns with the breaking news that BlackRock's ETF has sold $219,410,000 worth of Bitcoin, suggesting a heavy moment for the financial or crypto industry.

Shibetoshi Nakamoto @BillyM2k · 2026-07-02T18:35:22+00:00

A meme with text reading "Me: Drinking from a soggy straw to save the planet" and "Taylor Swift:" above an image of a large military cargo plane (B-52) dropping bombs.

AI visual analysis: A meme with text reading "Me: Drinking from a soggy straw to save the planet" and "Taylor Swift:" above an image of a large military cargo plane (B-52) dropping bombs.

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T17:21:03+00:00

JUST IN: Bitcoin is performing the strongest it EVER has in a bear market HODL

A chart titled "BEAR MARKETS ARE GETTING SHALLOWER" showing Bitcoin's historical bear market drawdowns: -94% (2011), -86% (2013), -84% (2017), -78% (2022), and a projected -54% (2026), illustrating progressively milder declines that support the claim of Bitcoin's strongest-ever bear market performance, sponsored by Duelbits and Bet the Numbers.

AI visual analysis: A chart titled "BEAR MARKETS ARE GETTING SHALLOWER" showing Bitcoin's historical bear market drawdowns: -94% (2011), -86% (2013), -84% (2017), -78% (2022), and a projected -54% (2026), illustrating progressively milder declines that support the claim of Bitcoin's strongest-ever bear market performance, sponsored by Duelbits and Bet the Numbers.

Killa @KillaXBT · 2026-07-02T10:48:48+00:00

As expected, $BTC is up 5% from the monthly open pivot. We saw a clear bearish narrative form, making it a high probability area for a bounce based on the previous 5 occurrences.

A candlestick chart of BTC price action displays 5 instances of bullish bounces (highlighted in teal) and bearish moves (highlighted in pink) from monthly open pivots, with the most recent occurrence showing a 5% upward bounce, illustrating the recurring pattern referenced in the post.

AI visual analysis: A candlestick chart of BTC price action displays 5 instances of bullish bounces (highlighted in teal) and bearish moves (highlighted in pink) from monthly open pivots, with the most recent occurrence showing a 5% upward bounce, illustrating the recurring pattern referenced in the post.

南宫远 @nangongyuan · 2026-07-02T06:06:00+00:00

Finally found this old picture. Chang Jie talks about Bitcoin from the early days. "I've been through the phase from $35 to $2; that was truly a hopeless darkness."

A Weibo screenshot shows a post by user "aisen" (管理员) reading "我经历过35美元到2美元的阶段,那真是毫无希望的黑暗。" with the account tagged "@布道财经wtwo" and source "weibo.com/brnngy", relating to early Bitcoin's volatile price history.

AI visual analysis: A Weibo screenshot shows a post by user "aisen" (管理员) reading "我经历过35美元到2美元的阶段,那真是毫无希望的黑暗。" with the account tagged "@布道财经wtwo" and source "weibo.com/brnngy", relating to early Bitcoin's volatile price history.

Versan | Black Swan Capitalist @VersanAljarrah · 2026-07-02T14:41:52+00:00

Catherine Austin Fitts: “XRP and @Ripple will be exceptionally important to whatever the train tracks they’re building. I don’t see Bitcoin as being an important part of that.” She made clear that Bitcoin is not an efficient payment system and lacks fundamental utility for the

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T15:55:20+00:00

BREAKING: $100 BILLION ROBINHOOD JUST ANNOUNCED THAT YOU CAN NOW LET AI AGENTS TRADE #BITCOIN AND CRYPTO DIRECTLY IN YOUR ACCOUNT AI CAN NOW SPOT AND EXECUTE PROFITABLE TRADING PATTERNS 24/7 THIS IS AN ABSOLUTE GAME CHANGER FOR BTC THE FUTURE IS HERE

Ash Crypto @AshCrypto · 2026-07-02T15:55:21+00:00

Bitcoin just hit $62,000. Me who bought at $126,000:

Ash Crypto @AshCrypto · 2026-07-02T19:36:15+00:00

Bought the dip nobody wanted. Held through multiple -50% crashes. Stayed when everyone said it was over. Kept adding when it hurt the most. Compounded during the years nobody talks about. It took years of patience to reach here. And one day, people will still call us

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T12:40:02+00:00

JUST IN: There's now a 60% chance Bitcoin will pump back to $65,000 this month, according to Polymarket

A glowing gold Bitcoin coin is displayed alongside a rising green candlestick chart and an upward-pointing arrow, symbolizing bullish market momentum. The imagery visually reinforces the prediction of a potential Bitcoin rally back to $65,000 this month with a 60% probability according to Polymarket.

AI visual analysis: A glowing gold Bitcoin coin is displayed alongside a rising green candlestick chart and an upward-pointing arrow, symbolizing bullish market momentum. The imagery visually reinforces the prediction of a potential Bitcoin rally back to $65,000 this month with a 60% probability according to Polymarket.

CryptoTelugu @CryptoTeluguO · 2026-07-02T09:27:27+00:00

One stone two birds strategy Simple guide on @arcus_xyz Spot DEX @arcus_xyz Spot is live on Robinhood chain This is new DEX from @dydxfoundation So don't skip DEX on beta phase Expect bugs & glitches Super early No confirmed rewards Steps

Crypto Rover @cryptorover · 2026-07-02T08:11:12+00:00

NEW: Metaplanet buys 2,823 Bitcoin worth $170 million after a 3-month buying pause. They now hold 43,000 $BTC worth $2.58 billion.

A headshot of a smiling man with dark hair wearing a dark green polo shirt, likely representing a figure associated with Metaplanet's recent Bitcoin acquisition announcement. No text or identifying details are visible in the image.

AI visual analysis: A headshot of a smiling man with dark hair wearing a dark green polo shirt, likely representing a figure associated with Metaplanet's recent Bitcoin acquisition announcement. No text or identifying details are visible in the image.

Lookonchain @lookonchain · 2026-07-02T15:13:25+00:00

July 2 Update: #Bitcoin ETFs: 1D NetFlow: -6,165 $BTC (-$379.59M) 7D NetFlow: -32,807 $BTC (-$2.02B) #Ethereum ETFs: 1D NetFlow: +21,568 $ETH (+$36.6M) 7D NetFlow: -54,411 $ETH (-$92.34M) x.com/lookonchain/st …

The image is a data table from Lookonchain showing ETF net inflows for July 2, 2026, indicating that Bitcoin ETFs experienced net outflows of -6,165 BTC (-$379.59M) for 1D and -32,807 BTC (-$2.02B) for 7D, while Ethereum ETFs had a 1D inflow of +21,568 ETH (+$36.6M) but a 7D outflow of -54,411 ETH (-$92.34M). Major holdings are listed by issuer, with BlackRock's IBIT leading BTC holdings at 730,613 BTC and Grayscale's ETFs being the largest ETH holders.

AI visual analysis: The image is a data table from Lookonchain showing ETF net inflows for July 2, 2026, indicating that Bitcoin ETFs experienced net outflows of -6,165 BTC (-$379.59M) for 1D and -32,807 BTC (-$2.02B) for 7D, while Ethereum ETFs had a 1D inflow of +21,568 ETH (+$36.6M) but a 7D outflow of -54,411 ETH (-$92.34M). Major holdings are listed by issuer, with BlackRock's IBIT leading BTC holdings at 730,613 BTC and Grayscale's ETFs being the largest ETH holders.

0xNobler @CryptoNobler · 2026-07-02T19:48:30+00:00

BREAKING TRUMP TO MAKE A "HUGE" ANNOUNCEMENT AFTER A POLICY MEETING AT 6:00 PM ET TODAY. INSIDERS EXPECT HIM TO OFFICIALLY ANNOUNCE A NEW 15% UNIVERSAL TARIFF. THIS IS BAD NEWS FOR BITCOIN AND RISK ASSETS IF TRUE...

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T14:02:03+00:00

JUST IN: $62,000 Bitcoin

An orange line chart on a dark background showing a rising trend from ~60000 to ~62000, with the current value labeled 62000.00 on the right axis.

AI visual analysis: An orange line chart on a dark background showing a rising trend from ~60000 to ~62000, with the current value labeled 62000.00 on the right axis.

Mike Alfred @mikealfred · 2026-07-02T12:35:13+00:00

Job market strong. Oil dropping. DXY topping. Japanese yen steadying. AI ripping. Bitcoin has bottomed. Valhalla coming in to focus. Only the strong will survive but this is a market where even the weak can make money. Do not be the idiot who fumbles the ball at the 3 yard line.

DANNY @Danny_Crypton · 2026-07-02T19:42:50+00:00

BITCOIN HAS 12 HOURS LEFT Every 2 red 6M candles were followed by a 3-year uptrend. The second candle closes soon. Don't say you weren't warned..

The image displays the Bitcoin "₿" logo on a vibrant orange background, serving as a bold visual representation of Bitcoin that aligns with the post's urgent warning about an imminent 3-year uptrend following a closing 6-month candle.

AI visual analysis: The image displays the Bitcoin "₿" logo on a vibrant orange background, serving as a bold visual representation of Bitcoin that aligns with the post's urgent warning about an imminent 3-year uptrend following a closing 6-month candle.

The Wolf Of All Streets @scottmelker · 2026-07-02T16:17:24+00:00

"270,000 Bitcoin accumulated by whales at $59,000. The largest single accumulation spike ever recorded onchain. Bigger than the COVID bottom. Bigger than the FTX bottom" "ETF outflows hit $4.5 billion in June. But the smart money, the whales who sold above $120,000, are now

静香小姐 @btc_jx · 2026-07-02T12:15:10+00:00

Good luck, good luck, please land in the palm of my hand Sponsored by @bcgame

A young woman in a traditional floral kimono and decorative hairpiece uses a wooden ladle at a Japanese temple purification fountain, participating in the ritual of washing hands before prayer—a gesture of seeking good fortune. The "BC.GAME" logo is overlaid on the image, connecting the temple blessing to the sponsor's wish for luck.

AI visual analysis: A young woman in a traditional floral kimono and decorative hairpiece uses a wooden ladle at a Japanese temple purification fountain, participating in the ritual of washing hands before prayer—a gesture of seeking good fortune. The "BC.GAME" logo is overlaid on the image, connecting the temple blessing to the sponsor's wish for luck.

John Squire @TheCryptoSquire · 2026-07-02T09:21:00+00:00

Exchange your #Bitcoin for #XRP if you haven’t already.

Bitmine (NYSE-BMNR) $ETH @BitMNR · 2026-07-02T17:07:15+00:00

As 2H 2026 starts, a key ratio is $ETH / $BTC price ratio - given growth in stablecoins, tokenization, new @ethereum spinoffs - these favor this ratio rising macro should be on balance friendlier - oil declines = less inflation - crypto still a downstream story to AI - Clarity

The image shows the ETHBTC price chart on Binance at 0.02753 BTC, up 2.69% today but down 1.99% over the past month, with the trading pair consolidating in the 0.026–0.028 range. The chart visualizes the Ethereum-to-Bitcoin ratio mentioned in the post, providing a technical reference point for the author's bullish thesis on ETH outperforming BTC as 2H 2026 begins.

AI visual analysis: The image shows the ETHBTC price chart on Binance at 0.02753 BTC, up 2.69% today but down 1.99% over the past month, with the trading pair consolidating in the 0.026–0.028 range. The chart visualizes the Ethereum-to-Bitcoin ratio mentioned in the post, providing a technical reference point for the author's bullish thesis on ETH outperforming BTC as 2H 2026 begins.

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T11:40:00+00:00

JUST IN: Japan's Metaplanet buys 2,823 Bitcoin worth $172.7 million They now own 43,000 BTC

A dashboard displaying Metaplanet's Bitcoin holdings of 43,000 BTC ($2.631 billion), with a balance history chart showing accumulation from 0 BTC in May 2024 to over 40,000 BTC by July 2025, including a recent 7-day increase of 2,823 BTC ($172.7 million).

AI visual analysis: A dashboard displaying Metaplanet's Bitcoin holdings of 43,000 BTC ($2.631 billion), with a balance history chart showing accumulation from 0 BTC in May 2024 to over 40,000 BTC by July 2025, including a recent 7-day increase of 2,823 BTC ($172.7 million).

Documenting Saylor @saylordocs · 2026-07-02T17:01:00+00:00

" Ignored my wife, and my parents. I bought Bitcoin at 15K in 2022. now Bitcoin at $61K and everyone’s congrat me. " " and ? " " They just don’t know I took profit at 20K, fomo bought back at 126k "

Crypto Rover @cryptorover · 2026-07-02T20:33:00+00:00

If I send you 1 $BTC , would it change your life?

FinancialFreedom @FinFreedom414 · 2026-07-02T20:01:37+00:00

John Bollinger the inventor of the Bollinger Band is bullish on Bitcoin.

Killa @KillaXBT · 2026-07-02T14:22:59+00:00

Appreciate you all tuning in. We peaked at 1,110 viewers. In a few months, when the $BTC bull market begins, I'll be streaming much more often, with a facecam.

Leonardo DiCaprio as Jordan Belfort addresses a crowd, mirroring the excitement of the recent 1,110 peak viewership for a stream about the $BTC bull market.

AI visual analysis: Leonardo DiCaprio as Jordan Belfort addresses a crowd, mirroring the excitement of the recent 1,110 peak viewership for a stream about the $BTC bull market.

BITCOINLFG® @bitcoinlfgo · 2026-07-02T14:57:55+00:00

JUST IN MICHAEL SAYLOR SAYS #BITCOIN WILL BECOME THE WORLD’S LARGEST ASSET WITHIN THE NEXT 48 MONTHS EXTREMELY BULLISHH

A man with gray hair and a beard wearing black sunglasses, a dark suit, and an orange tie against an orange backdrop, accompanying a post about Michael Saylor predicting Bitcoin will become the world's largest asset within 48 months, with his orange tie mirroring the post's bullish tone and orange background.

AI visual analysis: A man with gray hair and a beard wearing black sunglasses, a dark suit, and an orange tie against an orange backdrop, accompanying a post about Michael Saylor predicting Bitcoin will become the world's largest asset within 48 months, with his orange tie mirroring the post's bullish tone and orange background.

John Bollinger @bbands · 2026-07-02T18:50:08+00:00

$BTC has seen a series of bullish patterns broken, evidence of the power of the downtrend. Will this 'W' be the one that breaks the trend?

Crypto Rover @cryptorover · 2026-07-02T14:00:45+00:00

BREAKING: Bitcoin hits $62,000. $500,000,000 worth of late shorts liquidated over the last 24 hours. Welcome to the "July Relief Rally."

A Bitcoin/Tether (BTC/USDT) candlestick chart displays a sharp upward price rally, with an annotated green arrow tracing the surge from approximately $58,000 to $62,200, visually emphasizing the breakout above the $62,000 level highlighted on the right axis. The "BITCOIN" label accompanies the chart, illustrating the momentum behind the reported relief rally and $500 million in short liquidations.

AI visual analysis: A Bitcoin/Tether (BTC/USDT) candlestick chart displays a sharp upward price rally, with an annotated green arrow tracing the surge from approximately $58,000 to $62,200, visually emphasizing the breakout above the $62,000 level highlighted on the right axis. The "BITCOIN" label accompanies the chart, illustrating the momentum behind the reported relief rally and $500 million in short liquidations.

Mr.₿itcoin @coinspace_ · 2026-07-02T06:38:43+00:00

【Breaking News】 Metaplanet, Acquires an Additional 2,823 #Bitcoin Total Holdings Reach 43,000 BTC.

The image is a promotional announcement from Metaplanet titled "Secure the Future with Bitcoin," featuring a glowing Bitcoin-shaped emblem against a cosmic background. Japanese text and a corporate filing dated 2026 reveal that the company has acquired an additional 2,823 BTC, bringing its year-to-date BTC yield to 9.59% and total holdings to 43,000 BTC, aligning with the post's breaking news.

AI visual analysis: The image is a promotional announcement from Metaplanet titled "Secure the Future with Bitcoin," featuring a glowing Bitcoin-shaped emblem against a cosmic background. Japanese text and a corporate filing dated 2026 reveal that the company has acquired an additional 2,823 BTC, bringing its year-to-date BTC yield to 9.59% and total holdings to 43,000 BTC, aligning with the post's breaking news.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T12:00:03+00:00

Saylor knows exactly what people are saying about him here on X. "The guy said don't sell your Bitcoin. And then his company sold his Bitcoin. What the heck." Instead of dodging it, he leans in. The trending memes, the outrage, the accusations of hypocrisy, he addresses all of

Crypto Rover @cryptorover · 2026-07-02T17:18:00+00:00

NOW: BITCOIN IS TESTING THE 200W MOVING AVERAGE.

The image displays a Bitcoin daily candlestick chart from TradingView, with the BTC/USD pair currently trading at $61,084.9 (-3.50%), showing a 200-week moving average (blue line) that the price is testing as support, indicated by a white arrow pointing to the key technical level.

AI visual analysis: The image displays a Bitcoin daily candlestick chart from TradingView, with the BTC/USD pair currently trading at $61,084.9 (-3.50%), showing a 200-week moving average (blue line) that the price is testing as support, indicated by a white arrow pointing to the key technical level.

Crypto Rover @cryptorover · 2026-07-02T15:32:00+00:00

What is your price target for Bitcoin, once the Clarity Act passes?

Crypto Rover @cryptorover · 2026-07-02T16:02:00+00:00

BITCOIN IS TESTING THE GOLDEN POCKET. Draw the fib from the 2022 bottom to the cycle top. The 0.618 sits at 57,800. The 0.65 at 54,200. That zone, the golden pocket, is where major bull runs find their floor. Price is sitting right on it now. If this holds, the

Rekt Fencer @rektfencer · 2026-07-02T18:07:24+00:00

BITCOIN ALREADY HAS ITS NEXT BOTTOM DATE Every major $BTC bull market lasted 1064 days. Every following bear market lasted 364 days. 2015 ➜ 2017: 1064 days up 2017 ➜ 2018: 364 days down 2018 ➜ 2021: 1064 days up 2021 ➜ 2022: 364 days down 2022 ➜ 2025: 1064 days up

Saifedean Ammous @saifedean · 2026-07-02T12:52:14+00:00

In retrospect, all the hype about the US govt bitcoin strategic reserve turns out to have just been kayfabe to launch memecoin scams & sell pardons for shitcoins.

Crypto Rover @cryptorover · 2026-07-02T14:12:00+00:00

WARNING TO CRYPTO HOLDERS! BITCOIN FALLING WEDGE BREAKOUT!

A TradingView candlestick chart of Bitcoin (BTC/USD) shows a descending price pattern with red and green trendlines converging into a falling wedge formation, alongside text reading "Bitcoin_FallingWedge" and "BTCUSD" at the top, visually illustrating the post's claim of a breakout from this technical pattern.

AI visual analysis: A TradingView candlestick chart of Bitcoin (BTC/USD) shows a descending price pattern with red and green trendlines converging into a falling wedge formation, alongside text reading "Bitcoin_FallingWedge" and "BTCUSD" at the top, visually illustrating the post's claim of a breakout from this technical pattern.

苏苏Vee @btc_vee · 2026-07-02T02:15:34+00:00

Let me emphasize it again!! Don't be the sucker catching the knife at the peak! Listen up, I'm only saying this once! The 0.5 Fibonacci retracement level is the line of life and death! From 2020 until now, it's already played out a full 4 times! Right now, the fourth harvest of

Mercy @Mercy_okx · 2026-07-02T14:46:29+00:00

Become the first one-person company (OPC) to achieve $1 million in annual revenue on the OKX.AI platform, and you'll receive a bonus greater than one BTC donated personally by the boss! Looking forward to witnessing the moment our first batch of experience

アンゴロウ@暗号資産 @angorou7 · 2026-07-02T08:14:44+00:00

Japanese company Metaplanet has made additional Bitcoin purchases, now just 515 coins away from reaching the world No. 2 spot Purchased amount: 2823 BTC (35.8 billion yen) Total holdings: 43,000 BTC (417.9 billion yen) Steadfastly increasing holdings even as Bitcoin prices

This table shows the ranking of listed companies by Bitcoin holdings, with Metaplanet at 3rd place holding 43,000 BTC. The post's mention of Metaplanet's recent Bitcoin purchases and their goal of reaching the #2 spot is directly reflected in this chart, highlighting their current position.

AI visual analysis: This table shows the ranking of listed companies by Bitcoin holdings, with Metaplanet at 3rd place holding 43,000 BTC. The post's mention of Metaplanet's recent Bitcoin purchases and their goal of reaching the #2 spot is directly reflected in this chart, highlighting their current position.

Crypto Rover @cryptorover · 2026-07-02T16:42:00+00:00

JULY KEEPS MARKING THE START OF RELIEF FOR BITCOIN. 2018. 2022. 2026. All midterm years. We are in the window now.

Arkham @arkham · 2026-07-02T15:06:49+00:00

$30M OF CLIFTON COLLINS’ BTC JUST MOVED Clifton Collins is an Irish beekeeper turned drug dealer, who made over $400M on Bitcoin - and then “lost” it all. Irish Police recovered $30M of his BTC and sent it to Coinbase back in March. Now, another $30M just moved. Was this seized

A screenshot of the Arkham Intelligence dashboard showing a Bitcoin address labeled "Clifton Collins (Cliff Bee)" with a balance of 6,372.218492 BTC (approximately $677,258,492.70), alongside transaction history and balance charts, supporting the post's claim that $30M of his seized Bitcoin has recently moved on-chain.

AI visual analysis: A screenshot of the Arkham Intelligence dashboard showing a Bitcoin address labeled "Clifton Collins (Cliff Bee)" with a balance of 6,372.218492 BTC (approximately $677,258,492.70), alongside transaction history and balance charts, supporting the post's claim that $30M of his seized Bitcoin has recently moved on-chain.

Ted @TedPillows · 2026-07-02T18:01:47+00:00

$80,000 BTC is the most popular bet for this month. The most popular bet for the end of Q3 is a $BTC price range of $50,000 to $60,000. It seems like big money is expecting a Bitcoin relief rally this month and then a new bottom.

Whale Alert @whale_alert · 2026-07-02T22:04:38+00:00

984 $BTC (60,608,450 USD) transferred from unknown wallet to Coinbase Institutional whale-alert.io/tx/bitcoin/ac5 …

Rekt Fencer @rektfencer · 2026-07-02T08:40:20+00:00

JUST IN: EL SALVADOR NOW HOLDS 7,700 $BTC WORTH $465M. THEY HAVE BEEN BUYING 1 BITCOIN EVERY DAY SINCE 2022. NAYIB BUKELE IS THE FIRST TRUE BITCOIN PRESIDENT.

CoinGecko @coingecko · 2026-07-02T10:18:34+00:00

JUST IN: Bitcoin reclaims $61,000 for the first time in a week.

A CoinGecko screenshot showing Bitcoin (BTC) trading at $61,158.00, up 4.2% over 24 hours, with a green price chart trending upward over the past day—visually confirming the breaking news that BTC has reclaimed the $61,000 level for the first time in a week.

AI visual analysis: A CoinGecko screenshot showing Bitcoin (BTC) trading at $61,158.00, up 4.2% over 24 hours, with a green price chart trending upward over the past day—visually confirming the breaking news that BTC has reclaimed the $61,000 level for the first time in a week.

Documenting Saylor @saylordocs · 2026-07-02T11:39:00+00:00

MICHAEL SAYLOR SAID IF MICROSTRATEGY ACCUMULATES 5% OF ALL BITCOIN, BTC COULD HIT $1,000,000. AT 7%, THE MODEL IMPLIES $10,000,000 PER BITCOIN. ABSOLUTELY INSANE NUMBERS.

Crypto Rover @cryptorover · 2026-07-02T18:02:00+00:00

Red June means Green July for Bitcoin. Told you.

A Coinglass heatmap shows Bitcoin's monthly returns (%) by year from 2013-2026, with the June column highlighted—revealing a median June return of -0.4% and an average of -1.59%, while July's average return is +7.48%. This supports the post's claim that historically negative June performance tends to precede positive July performance for Bitcoin.

AI visual analysis: A Coinglass heatmap shows Bitcoin's monthly returns (%) by year from 2013-2026, with the June column highlighted—revealing a median June return of -0.4% and an average of -1.59%, while July's average return is +7.48%. This supports the post's claim that historically negative June performance tends to precede positive July performance for Bitcoin.

EliZ @eliz883 · 2026-07-02T13:04:39+00:00

As planned, and quite simply, the strategy was a success. The 65k–69k range remains my profit-taking target. From there, I’ll assess how the market reacts. If, on the other hand, we were to break below the range, I’ll still exit with a profit and wait for new opportunities.

A BTCUSD 12H candlestick chart shows a sharp drop from ~$78,000 down through the $70,519 resistance level, followed by consolidation between roughly $58,000 and $69,000, with a highlighted $60,000–$62,000 demand zone and key levels marked at $70,519.22 and $63,518.92 — visually reinforcing the strategy of profit-taking in the $65k–$69k range while staying alert to a breakdown below support.

AI visual analysis: A BTCUSD 12H candlestick chart shows a sharp drop from ~$78,000 down through the $70,519 resistance level, followed by consolidation between roughly $58,000 and $69,000, with a highlighted $60,000–$62,000 demand zone and key levels marked at $70,519.22 and $63,518.92 — visually reinforcing the strategy of profit-taking in the $65k–$69k range while staying alert to a breakdown below support.

Ash Crypto @AshCrypto · 2026-07-02T08:06:49+00:00

BULLISH: Metaplanet has bought $170M worth of bitcoin after 3 months of inactivity. They now holds 43,000 BTC worth $2.59 billion and is currently the third-largest BTC treasury company in the world.

The Metaplanet company logo featuring a stylized black 'M' design on an orange background.

AI visual analysis: The Metaplanet company logo featuring a stylized black 'M' design on an orange background.

Crypto Rover @cryptorover · 2026-07-02T05:00:16+00:00

BREAKING: BlackRock SELLS $220,000,000 worth of Bitcoin...

I can't identify the person in the image based on their facial features. 

I can describe what I see: a man with thinning gray hair, wearing glasses and a dark suit, with his hands clasped together near his face in a contemplative pose against a dark background.

If you could tell me who this is, I'd be happy to help write a caption connecting the image to the post about BlackRock's $220 million Bitcoin sale.

AI visual analysis: I can't identify the person in the image based on their facial features. I can describe what I see: a man with thinning gray hair, wearing glasses and a dark suit, with his hands clasped together near his face in a contemplative pose against a dark background. If you could tell me who this is, I'd be happy to help write a caption connecting the image to the post about BlackRock's $220 million Bitcoin sale.

CryptosRus @CryptosR_Us · 2026-07-02T10:00:23+00:00

BITCOIN WHALES HAVE ACCUMULATED OVER 270,000 BTC. Wallets holding 1,000–10,000 $BTC have added more than 270,000 $BTC over the past 30 days. That's the largest 30-day whale accumulation since 2013. CryptoQuant

A CryptoQuant chart displays Bitcoin's price declining from approximately $125K to $60K between July 2025 and June 2026, alongside a total balance of 2.2–2.6M BTC and showing a sharp drop in 30-day % change around late 2025/early 2026, corresponding to the post's claim of 270,000 BTC whale accumulation—the largest 30-day accumulation since 2013—occurring during this period of price volatility.

AI visual analysis: A CryptoQuant chart displays Bitcoin's price declining from approximately $125K to $60K between July 2025 and June 2026, alongside a total balance of 2.2–2.6M BTC and showing a sharp drop in 30-day % change around late 2025/early 2026, corresponding to the post's claim of 270,000 BTC whale accumulation—the largest 30-day accumulation since 2013—occurring during this period of price volatility.

Crypto Rover @cryptorover · 2026-07-02T16:36:22+00:00

For my EU followers: @okx ‘s €10M deposit pool ran out so fast they raised it to €50M. That's the MiCA migration in numbers. First global exchange with a full licence, 8% bonus to switch. Good time to claim your share.

A promotional advertisement by OKX with the headline "Europe's Rewards Levelled Up" features a large "€50M" displayed over a darkened image of the Brandenburg Gate, offering an "8% DEPOSIT BONUS." The image directly reinforces the post's message about OKX expanding its European deposit pool to €50 million following its MiCA licensing as a Malta-registered CASP.

AI visual analysis: A promotional advertisement by OKX with the headline "Europe's Rewards Levelled Up" features a large "€50M" displayed over a darkened image of the Brandenburg Gate, offering an "8% DEPOSIT BONUS." The image directly reinforces the post's message about OKX expanding its European deposit pool to €50 million following its MiCA licensing as a Malta-registered CASP.

Paul White Gold Eagle @PaulGoldEagle · 2026-07-02T03:42:33+00:00

BREAKING: BRAD GARLINGHOUSE SAYS BITCOIN EXPERIMENT IS DONE!! XRP IS NOW THE ANSWER, $XRP IS DESIGNED FOR $10,0000

Coin Bureau @coinbureau · 2026-07-02T13:25:36+00:00

JUST IN: BITCOIN HAS OFFICIALLY ERASED ITS DROP TO $58K Bitcoin is now back above $61.8K, fully recovering its June 25 drop to $58K. That selloff marked BTC’s first move to $58K since September 17, 2024. The rebound comes after the U.S. added just 57K jobs in June, while

A Bitcoin/U.S. Dollar (BTC/USD) candlestick chart on a 45-minute timeframe shows a sharp recovery from around $60,000, with BTC currently trading at $61,094.46 (+1.41%). The green candles illustrate the rebound that pushed Bitcoin back above the $61.8K level, fully erasing its earlier drop to $58K.

AI visual analysis: A Bitcoin/U.S. Dollar (BTC/USD) candlestick chart on a 45-minute timeframe shows a sharp recovery from around $60,000, with BTC currently trading at $61,094.46 (+1.41%). The green candles illustrate the rebound that pushed Bitcoin back above the $61.8K level, fully erasing its earlier drop to $58K.

EliZ @eliz883 · 2026-07-02T11:52:25+00:00

Before long, you’ll see everyone talking about 170k as the next target. But remember one thing: what we’re seeing now is simply a reaction following a long period of weakness. After such a prolonged decline, it’s perfectly normal to see rebounds and periods of consolidation.

Crypto Rover @cryptorover · 2026-07-02T22:03:00+00:00

July could bring more relief for Bitcoin. But I do think, $BTC ends up lower this bear market.

Merlijn The Trader @MerlijnTrader · 2026-07-02T09:00:01+00:00

BITCOIN IS BREAKING OUT! Everyone gave up on the bulls right before this. Falling wedge just snapped. $63K in play. The move always starts when the crowd stops looking. This time, you saw it first.

Coin Bureau @coinbureau · 2026-07-02T22:45:00+00:00

BILL MILLER SAYS BITCOIN’S LONG-TERM CASE IS STRONGER THAN EVER Bitcoin is still around 50% below its all-time high, but Miller Value Partners’ Bill Miller IV says the fundamental case remains strong. With the CBO projecting a $1.9 TRILLION deficit, Miller said Bitcoin

Teddy - PolyBackTest.com @Bitcoin_Teddy · 2026-07-02T12:03:00+00:00

FACT: SWITZERLAND NOW OFFERS 0% CAPITAL GAINS TAX ON BITCOIN AND CRYPTO BULLISH

A scenic view of the Matterhorn mountain in Switzerland, with a traditional wooden chalet in the foreground flying the Swiss flag.

AI visual analysis: A scenic view of the Matterhorn mountain in Switzerland, with a traditional wooden chalet in the foreground flying the Swiss flag.

₿itcoin hodler @morrisoi37 · 2026-07-02T15:16:29+00:00

Financial Illiteracy Surpasses 2 Million

A Korean news article from "뉴스원" (News1) dated July 2, 2026, by reporter Kim Min-soo, reports that the government's "청년미래적금" (Youth Future Savings) program attracted an additional 500,000 subscribers within two days, causing 2 million applicants to fail to join in the first week, with the article noting that even financial support proposals for "출산" (childbirth) have received no budget.

AI visual analysis: A Korean news article from "뉴스원" (News1) dated July 2, 2026, by reporter Kim Min-soo, reports that the government's "청년미래적금" (Youth Future Savings) program attracted an additional 500,000 subscribers within two days, causing 2 million applicants to fail to join in the first week, with the article noting that even financial support proposals for "출산" (childbirth) have received no budget.

Ted @TedPillows · 2026-07-02T17:08:22+00:00

$1,250,000,000,000 has now been wiped out from the US stock market in last 3 hours. This is more than the entire market cap of Bitcoin.

A stock market heatmap displays widespread red across major US stocks, with notable declines including NVDA (-2.26%), GOOG (-2.07%), TSLA (-8.06%), META (-4.61%), and AAPL (-10.05%), visually illustrating the massive $1.25 trillion market value wipeout referenced in the post.

AI visual analysis: A stock market heatmap displays widespread red across major US stocks, with notable declines including NVDA (-2.26%), GOOG (-2.07%), TSLA (-8.06%), META (-4.61%), and AAPL (-10.05%), visually illustrating the massive $1.25 trillion market value wipeout referenced in the post.

John @CryptoGodJohn · 2026-07-02T13:46:13+00:00

Bitcoin and Solana longs cooking with the gang @WealthGroup

A trading screenshot showcasing a SOLUSDT Long 30.0X position with an impressive +588.80% ROI, alongside a Bitcoin long position at $61,913.70 (up from a $59,708.60 entry), crediting @Johnny, which complements the post's celebration of Bitcoin and Solana longs performed alongside @WealthGroup.

AI visual analysis: A trading screenshot showcasing a SOLUSDT Long 30.0X position with an impressive +588.80% ROI, alongside a Bitcoin long position at $61,913.70 (up from a $59,708.60 entry), crediting @Johnny, which complements the post's celebration of Bitcoin and Solana longs performed alongside @WealthGroup.

*Walter Bloomberg @DeItaone · 2026-07-02T10:00:57+00:00

HYPERSCALE DATA BUYS 67 BITCOIN BRINGING BITCOIN TREASURY TO APPROXIMATELY 849 BITCOIN

XO @Trader_XO · 2026-07-02T18:29:02+00:00

$HYPE Closed the swing short from 75s at 62s last week... (see previous tweet) This is looking promising for another stab at the highs again should bitcoin continue pushing on... that will be key for me... currently long Secondary confluential factor is price is

A TradingView candlestick chart of USOIL (WTI crude oil) showing price action between roughly $46 and $78, with a current price highlighted at $63.40, illustrating the trader's long position following a swing short that closed in the $62s after peaking near $75.

AI visual analysis: A TradingView candlestick chart of USOIL (WTI crude oil) showing price action between roughly $46 and $78, with a current price highlighted at $63.40, illustrating the trader's long position following a swing short that closed in the $62s after peaking near $75.

Tony Research @TonyResearch_ · 2026-07-02T13:38:17+00:00

Everything is going exactly as I told you $BTC will close the FVG at $70K Then the real move begins My plan hasn’t changed: 1. Rally to $68K–$70K 2. 7–14 days of distribution 3. Breakdown below $56K 4. Flush to $48K 5. Final bottom test in the $38K–$44K zone Most people

Adam Back @adam3us · 2026-07-02T07:31:30+00:00

bitcoin immutability has to be watered from time to time with the tears of reactionary people who want to bend it to their confused ideas.

0xNobler @CryptoNobler · 2026-07-02T16:26:46+00:00

BREAKING SATOSHI ERA WHALE JUST DUMPED $520,000,000.00 $BTC AFTER 15 YEARS OF HODLING. HE REFUSED TO SELL DURING THE MT. GOX HACK, THE COVID CRASH, THE LUNA & FTX COLLAPSES - BUT DUMPED ALL 8,600 BITCOINS TODAY. HE DEFINITELY KNOWS BITCOIN WILL CRASH EVEN LOWER SOON...

Crypto Rover @cryptorover · 2026-07-02T06:03:00+00:00

Korea's stock market is crashing. Bitcoin is holding, even bouncing. Worth watching closely.

Kalshi Crypto @Kalshi_Crypto · 2026-07-02T14:07:40+00:00

JUST IN: Bitcoin reclaims $62,000 12% chance it hits $100,000 this year

Crypto Rover @cryptorover · 2026-07-02T11:24:00+00:00

THE FIRST BITCOIN TREASURY COMPANY HAS OFFICIALLY GONE UNDER. K Wave Media, a Nasdaq listed South Korean company, has sold its remaining 88 $BTC to repay $6 million in debt, reducing its Bitcoin holdings to ZERO. Just months ago, the company announced plans to build a 10,000

The image displays the "K WAVE Media" logo, which corresponds to the Nasdaq-listed South Korean company mentioned in the post as the first Bitcoin treasury company to sell off its remaining 88 BTC, reducing its holdings to zero to repay $6 million in debt.

AI visual analysis: The image displays the "K WAVE Media" logo, which corresponds to the Nasdaq-listed South Korean company mentioned in the post as the first Bitcoin treasury company to sell off its remaining 88 BTC, reducing its holdings to zero to repay $6 million in debt.

COLDCARD @COLDCARDwallet · 2026-07-02T13:31:43+00:00

Whale Alert @whale_alert · 2026-07-02T02:04:14+00:00

1,044 $BTC (62,795,084 USD) transferred from #Kraken to unknown wallet whale-alert.io/tx/bitcoin/333 …

Sunny Po @sunny051488 · 2026-07-02T22:44:22+00:00

Literally every smart person I know is buying bitcoin right now it's honestly wild

Crypto Rover @cryptorover · 2026-07-02T13:36:00+00:00

Bitcoin holders, Welcome to the macro-accumulation zone. The rules are simple. DCA Bitcoin, OR regret for the next 2-3 years. The choice is yours.

Reflection @0xReflection · 2026-07-02T12:19:21+00:00

$BTC is moving exactly as I promised Hold $61.5k ➜ $65k Break $66k = bear trap is officially over

A BTCUSDT.P 3D Binance candlestick chart shows Bitcoin's price action with an "X" marking a failed breakout near $80k, followed by a sharp decline and a highlighted "Bear Trap" zone between roughly $60k-$66k, with current price at $61,307.4—aligning with the post's call to hold $61.5k toward $65k and break $66k to confirm the bear trap is over.

AI visual analysis: A BTCUSDT.P 3D Binance candlestick chart shows Bitcoin's price action with an "X" marking a failed breakout near $80k, followed by a sharp decline and a highlighted "Bear Trap" zone between roughly $60k-$66k, with current price at $61,307.4—aligning with the post's call to hold $61.5k toward $65k and break $66k to confirm the bear trap is over.

Cheds Trading @BigCheds · 2026-07-02T23:44:01+00:00

$BTC now hidden bearish divergence with RSI on daily Price below local overhead 62.5k zone

A Bitcoin/USD TradingView chart showing BTC trading at $61,391.41 (+1.43%) with multiple moving averages (21, 13, 55 SMA) and Bollinger Bands overlaid on the daily candles. The RSI indicator at the bottom displays a hidden bearish divergence pattern, with price making a higher low near the $60,492 resistance zone while RSI prints a lower low, visually confirming the bearish setup noted in the caption.

AI visual analysis: A Bitcoin/USD TradingView chart showing BTC trading at $61,391.41 (+1.43%) with multiple moving averages (21, 13, 55 SMA) and Bollinger Bands overlaid on the daily candles. The RSI indicator at the bottom displays a hidden bearish divergence pattern, with price making a higher low near the $60,492 resistance zone while RSI prints a lower low, visually confirming the bearish setup noted in the caption.

Crypto Rover @cryptorover · 2026-07-02T18:42:00+00:00

Bitcoin looks to be interested in this Topside Liquidity.

The image shows a Binance BTC/USDT Perpetual 2-week Liquidation Heatmap with a price range of ~$57,817 to $71,805, highlighting a dense band of liquidation leverage around the $63,000-$65,000 area sitting just above current price action. The visible concentrated yellow-green liquidation zones above current levels align with the post's note that "Bitcoin looks to be interested in this Topside Liquidity," as price would need to rally upward into these leveraged positions to trigger them.

AI visual analysis: The image shows a Binance BTC/USDT Perpetual 2-week Liquidation Heatmap with a price range of ~$57,817 to $71,805, highlighting a dense band of liquidation leverage around the $63,000-$65,000 area sitting just above current price action. The visible concentrated yellow-green liquidation zones above current levels align with the post's note that "Bitcoin looks to be interested in this Topside Liquidity," as price would need to rally upward into these leveraged positions to trigger them.

0xMarioNawfal @RoundtableSpace · 2026-07-02T04:15:00+00:00

This guy used Claude Fable 5 to improve a Polymarket quant bot that has made $288,872 since April 30. It averages $6,878 in daily profit running around 30 trades per hour across short-term Bitcoin up and down markets, with a 56% win rate across 30,670 predictions in 42 days.

SalsaTekila @SalsaTekila · 2026-07-02T00:48:48+00:00

Ok I don't want to be judged. I just want straight answers. Is it worth to do this surgery? Planning to pivot to heightmaxxing while waiting for 700k BTC.

The image shows a medical illustration titled "Internal Nail in an Adult's Femur," depicting a femur bone stabilized by a metal nail secured with screws at both ends, near the knee. The illustration is credited to Sinai Hospital of Baltimore (2019) and is relevant to the post as it depicts leg-lengthening surgery hardware, which the user is apparently considering as part of a "heightmaxxing" plan.

AI visual analysis: The image shows a medical illustration titled "Internal Nail in an Adult's Femur," depicting a femur bone stabilized by a metal nail secured with screws at both ends, near the knee. The illustration is credited to Sinai Hospital of Baltimore (2019) and is relevant to the post as it depicts leg-lengthening surgery hardware, which the user is apparently considering as part of a "heightmaxxing" plan.

*Walter Bloomberg @DeItaone · 2026-07-02T13:44:33+00:00

CRYPTO STOCKS RALLY AS BITCOIN CLIMBS Bitcoin hit a one-week high, lifting crypto-related stocks: • $MSTR : +9.8% • $COIN : +8.0% • $MARA : +4.0% • $HUT : +1.0% • $IBIT : +3.3% • $BITO : +3.3%

Toobit @Toobit_official · 2026-07-02T05:34:57+00:00

Bitcoin goes above $60K. What's the first number you're watching next? #Crypto #BTC #Toobit

Miles Franklin Precious Metals @MilesFranklinCo · 2026-07-02T18:00:00+00:00

Catherine Austin Fitts ( @solari_the ) challenges the entire Bitcoin narrative. She tells @MichelleMakori that Bitcoin was not simply a grassroots freedom technology but a prototype for “programmable money” and “the digital control grid.” Her warning: many early believers thought

Crypto Rover @cryptorover · 2026-07-02T13:01:00+00:00

BITCOIN ETFs: THE LARGEST DRAWDOWN EVER!

Kabuki @kabukistory · 2026-07-02T15:38:33+00:00

Everyone celebrating Bitcoin bounce at $62K No one's asking what happens at $67K $67K is a powerful psychological mark. It won't break that easy. After reaching this target $Btc will dump like this: $67K → $62K → $52K → $45K If you think the bear market is over I have some

EliZ @eliz883 · 2026-07-02T10:23:43+00:00

$BTC Spot-on analysis Good job

A Bitcoin (BTCUSDT) 1-hour candlestick chart on TradingView shows price action trading around $61,146.95 with moving averages (60,417.34 and 60,324.77), highlighting a recent bounce from the $59,668.57 support level that validates the poster's bullish spot analysis.

AI visual analysis: A Bitcoin (BTCUSDT) 1-hour candlestick chart on TradingView shows price action trading around $61,146.95 with moving averages (60,417.34 and 60,324.77), highlighting a recent bounce from the $59,668.57 support level that validates the poster's bullish spot analysis.

pepeXBT @pepeXBT · 2026-07-02T09:14:15+00:00

second green dorito is beginning to form

A TradingView chart of XBT/USD on Coinbase shows the price forming a series of peaks (red triangles) and troughs (green triangles), with the most recent "green dorito" pattern emerging at the bottom of a sharp decline near $50,000, supporting the post's claim that a second bullish reversal signal is beginning to form.

AI visual analysis: A TradingView chart of XBT/USD on Coinbase shows the price forming a series of peaks (red triangles) and troughs (green triangles), with the most recent "green dorito" pattern emerging at the bottom of a sharp decline near $50,000, supporting the post's claim that a second bullish reversal signal is beginning to form.

Jack Mallers @jackmallers · 2026-07-02T20:37:01+00:00

Bitcoin bear markets are brutal. Ego gets punished. Leverage gets punished. Fraud gets punished. Illusion gets cleared. But if you let them, they make you better. Do not ask Bitcoin to be gentle. Ask it to be honest and then become the type of person who can handle the truth.

𝕯𝖔𝖔𝖉𝖑𝖊 @DoodleScr · 2026-07-02T14:06:49+00:00

$ETH and $BTC #Gold has started to rise. Everyone is asking why. Let's take a look together. Actually, the declines began with the increasing rhetoric about raising interest rates on the US side. Trump, who has been pressuring the Fed chair to cut interest rates for 2 years, is

Chiefy @0xChiefy · 2026-07-02T16:10:34+00:00

Everything is going EXACTLY according to plan. I warned that Bitcoin would bounce to $62K–$63K before the next dump. Now every level is breaking exactly as expected. The plan is simple: $62K → $55K → $52K → $45K Most people still think every bounce is the start of a

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T02:33:00+00:00

MEXICAN BILLIONAIRE RICARDO SALINAS GIVING THE BEST #BITCOIN FINANCIAL ADVICE: MORTGAGE YOUR HOUSE AND BUY BTC "I CONVINCED MY WIFE TO MORTGAGE THE HOUSE TO BUY BTC" "FOR MOST PEOPLE, THEIR BIGGEST INVESTMENT IS THEIR HOME EQUITY" "FIND A WAY TO TRANSFORM THAT INTO BTC"

The white Bitcoin logo (₿) displayed on an orange gradient background.

AI visual analysis: The white Bitcoin logo (₿) displayed on an orange gradient background.

Cointelegraph @Cointelegraph · 2026-07-02T21:10:16+00:00

TODAY: Bitcoin has surpassed Samsung, Micron and SK Hynix by market cap as it returns above the $1.2T level.

A market cap ranking chart shows Bitcoin at $1.239T (rank 16) just ahead of Samsung ($1.213T), Micron Technology ($1.179T), and Berkshire Hathaway ($1.079T), confirming Bitcoin's resurgence above $1.2T and surpassing these major companies in market value.

AI visual analysis: A market cap ranking chart shows Bitcoin at $1.239T (rank 16) just ahead of Samsung ($1.213T), Micron Technology ($1.179T), and Berkshire Hathaway ($1.079T), confirming Bitcoin's resurgence above $1.2T and surpassing these major companies in market value.

Crypto Rover @cryptorover · 2026-07-02T13:07:00+00:00

I'm going to announce the winner of my $1,000 $BTC Giveaway in my private community in a moment. You can join here: discord.gg/alphacartel After that, I'll share the handle on X too.

A Bitcoin wallet screenshot showing a balance of $1,000.00 (0.016708 BTC) with BTC priced at $59,868.98 on a 1-day declining chart, seemingly used as visual proof of the promised $1,000 BTC giveaway mentioned in the post.

AI visual analysis: A Bitcoin wallet screenshot showing a balance of $1,000.00 (0.016708 BTC) with BTC priced at $59,868.98 on a 1-day declining chart, seemingly used as visual proof of the promised $1,000 BTC giveaway mentioned in the post.

Cointelegraph @Cointelegraph · 2026-07-02T16:09:23+00:00

Will Bitcoin fall below $50K? Bitcoin quantitative analyst @TheRealPlanC doesn't think so, and explains why in our latest interview. Watch from 4:26.

0xMarioNawfal @RoundtableSpace · 2026-07-02T09:55:03+00:00

BTC IS BACK ABOVE $61K WE’RE SO FKING BACK!

A 5-minute BTCUSDT candlestick chart from Binance shows Bitcoin recovering from a low of $60,104.00 to $61,095.32, surpassing the previous local high of $61,121.78 as the price climbed back above the $61,000 level—matching the post's celebration of BTC's return to $61K.

AI visual analysis: A 5-minute BTCUSDT candlestick chart from Binance shows Bitcoin recovering from a low of $60,104.00 to $61,095.32, surpassing the previous local high of $61,121.78 as the price climbed back above the $61,000 level—matching the post's celebration of BTC's return to $61K.

Core DAO @Coredao_Org · 2026-07-02T18:01:06+00:00

Bitcoin staking. Bitcoin neobanking. Bitcoin financial products. All run on CORE.

CryptoReviewing @CryptoReviewing · 2026-07-02T14:05:57+00:00

$BTC whales absolutely wiped out! An insanely large amount of 'big money' orders between $60,100 to $62,000 were just wiped out in the latest $BTC flash pump to $62k. Now, $62,000 - $64,000 above has thin $BTC whale orders remaining that could be swept quickly.

Lucky @LLuciano_BTC · 2026-07-02T08:30:00+00:00

Metaplanet is buying Bitcoin again. After a three-month pause, the Japanese public company added another 2,823 BTC to its treasury. Treasury now holds 43,000 BTC after the latest acquisition. Approximately $221 million was deployed to purchase 2,823 BTC during the

The image features the "METAPLANET" logo in white text on a bright orange background, with the letter "A" stylized as a triangle, representing the Japanese public company that has resumed its Bitcoin acquisitions.

AI visual analysis: The image features the "METAPLANET" logo in white text on a bright orange background, with the letter "A" stylized as a triangle, representing the Japanese public company that has resumed its Bitcoin acquisitions.

Healthy Pockets @healthy_pockets · 2026-07-02T19:36:53+00:00

BOMBSHELL BLOOMBERG JUST REPORTED THAT THE U.S. SENATE IS EXPECTED TO RELEASE THE FINAL TEXT FOR THE CLARITY ACT ON #BITCOIN IN DAYS "THE TEXT WILL BE RELEASED DURING THE JULY 4TH WEEKEND"

Michaël van de Poppe @CryptoMichNL · 2026-07-02T18:51:20+00:00

"Buy Bitcoin. Leave it there forever and your grandchildren will thank you." That's the line everyone will clip from Michael @saylor . But the sentence right before it is the one that actually matters: "Take the money you don't need for four years or longer." That condition is

The Daily Block @thedailyblock · 2026-07-02T12:22:57+00:00

BREAKING: METAPLANET ADDS 2,823 BITCOIN IN Q2 Metaplanet has purchased 2,823 BTC during the second quarter, increasing its total Bitcoin holdings to 43,000 BTC. The company continues to expand one of the world's largest corporate Bitcoin treasuries, although its latest

Attendees gather in front of a Metaplanet booth displaying the "Secure the Future with Bitcoin" tagline, evoking the company's aggressive Bitcoin acquisition strategy highlighted by its 2,823 BTC purchase in Q2.

AI visual analysis: Attendees gather in front of a Metaplanet booth displaying the "Secure the Future with Bitcoin" tagline, evoking the company's aggressive Bitcoin acquisition strategy highlighted by its 2,823 BTC purchase in Q2.

Whale Insider @WhaleInsider · 2026-07-02T19:41:27+00:00

JUST IN: Bitcoin warning signs flash as $BTC inflows surge above 50,000 per day, signaling incoming volatility - CryptoQuant.

The image is a CryptoQuant chart titled "Bitcoin: Exchange Inflow (Total) - All Exchanges," tracking BTC exchange inflows (with a 7-day SMA) against Bitcoin's USD price from January to June, showing four instances—circled in red—where inflows spiked above the 50K BTC threshold (highlighted by a dashed horizontal line near $80K price levels), which the accompanying post identifies as warning signs for incoming volatility in $BTC.

AI visual analysis: The image is a CryptoQuant chart titled "Bitcoin: Exchange Inflow (Total) - All Exchanges," tracking BTC exchange inflows (with a 7-day SMA) against Bitcoin's USD price from January to June, showing four instances—circled in red—where inflows spiked above the 50K BTC threshold (highlighted by a dashed horizontal line near $80K price levels), which the accompanying post identifies as warning signs for incoming volatility in $BTC.

ᴀʟᴛꜱᴛʀᴇᴇᴛ ʙᴇᴛꜱ @AltstreetBet · 2026-07-02T05:38:25+00:00

300-500k

Lookonchain @lookonchain · 2026-07-02T01:54:01+00:00

Things aren't looking good for trader 0x50b3. His $ETH short and $BTC long are now down over $5.5M. Over the past month, he made more than 100 trades, won 90% of them, and earned $4.96M in profit. But this one trade wiped out all his profits. hyperbot.network/trader/0x50b30 …

A dashboard for trader "0x50b3...9f20" showing an account total value of $116,083,249.49, with their $ETH short (-$4,348,474.04, down 13.86%) and $BTC long (-$1,189,752.48, down 86.88%) positions resulting in a 1W total P&L of -$4,480,227.93 and uPnL of -$5,536,226.52, illustrating how these losing trades have wiped out their prior $4.96M in profits.

AI visual analysis: A dashboard for trader "0x50b3...9f20" showing an account total value of $116,083,249.49, with their $ETH short (-$4,348,474.04, down 13.86%) and $BTC long (-$1,189,752.48, down 86.88%) positions resulting in a 1W total P&L of -$4,480,227.93 and uPnL of -$5,536,226.52, illustrating how these losing trades have wiped out their prior $4.96M in profits.

Crypto Rover @cryptorover · 2026-07-02T07:18:00+00:00

Bitcoin long term holder supply PUMPS higher. Long term holders accumulate $BTC during bear markets.

The image displays a dual-axis chart titled "Bitcoin: Long Term Holder Supply" from Bitcoin Magazine Pro, tracking Long Term Holder Supply (light blue) in millions alongside BTC price (black) in USD from 2012 to 2026, reaching approximately 16M supply held and $100K BTC price. The chart visually supports the post's claim by showing long-term holder supply steadily climbing to new highs while BTC price trades near peak levels, illustrating how holders have accumulated through past bear markets.

AI visual analysis: The image displays a dual-axis chart titled "Bitcoin: Long Term Holder Supply" from Bitcoin Magazine Pro, tracking Long Term Holder Supply (light blue) in millions alongside BTC price (black) in USD from 2012 to 2026, reaching approximately 16M supply held and $100K BTC price. The chart visually supports the post's claim by showing long-term holder supply steadily climbing to new highs while BTC price trades near peak levels, illustrating how holders have accumulated through past bear markets.

ardizor @ardizor · 2026-07-02T11:30:01+00:00

THE NEXT 6 MONTHS DEFINE THE ENTIRE CYCLE Final stages of the bear market are almost over here's exactly how I see it playing out JUL → distribution phase continues AUG → downtrend accelerates, drop to $48K SEP → cycle bottom around $45K, accumulation begins OCT → first

The image features a white Bitcoin "₿" symbol centered on a bright orange gradient background, visually reinforcing the post's bullish narrative of a completed bear market cycle and an impending price bottom around $45K before a new accumulation phase begins.

AI visual analysis: The image features a white Bitcoin "₿" symbol centered on a bright orange gradient background, visually reinforcing the post's bullish narrative of a completed bear market cycle and an impending price bottom around $45K before a new accumulation phase begins.

Cointelegraph @Cointelegraph · 2026-07-02T15:00:40+00:00

INSIGHT: From Ethereum’s Glamsterdam and Solana’s Alpenglow, to proposed post quantum security changes for Bitcoin, 2026’s key crypto upgrades are some of the most significant in years. Via Cointelegraph Magazine

The image shows the white Bitcoin (₿) and Ethereum (Ξ) logos on a black background, representing the two largest cryptocurrencies mentioned in the post. The accompanying text discusses major upcoming crypto upgrades for 2026, including Ethereum's "Glamsterdam" and proposed post-quantum security changes for Bitcoin, highlighting significant protocol developments for these networks.

AI visual analysis: The image shows the white Bitcoin (₿) and Ethereum (Ξ) logos on a black background, representing the two largest cryptocurrencies mentioned in the post. The accompanying text discusses major upcoming crypto upgrades for 2026, including Ethereum's "Glamsterdam" and proposed post-quantum security changes for Bitcoin, highlighting significant protocol developments for these networks.

SOU @SOU_BTC · 2026-07-02T12:35:59+00:00

Being able to cut your losses is impressive. Nothing but respect.

The image shows a Japanese stock trading screen for Geo Japan (285A) displaying credit short sale (信用返済売) order details, with a current price of 76,400 yen (down 11,730 or -13.31%) and a realized loss of approximately -56.27 million yen from 5,000 shares. The caption reflects on the post's theme of cutting losses, highlighting how the trader accepted a substantial -56M yen loss to exit a short position rather than letting it spiral further—a disciplined approach to risk management.

AI visual analysis: The image shows a Japanese stock trading screen for Geo Japan (285A) displaying credit short sale (信用返済売) order details, with a current price of 76,400 yen (down 11,730 or -13.31%) and a realized loss of approximately -56.27 million yen from 5,000 shares. The caption reflects on the post's theme of cutting losses, highlighting how the trader accepted a substantial -56M yen loss to exit a short position rather than letting it spiral further—a disciplined approach to risk management.

VIKTOR @thedefivillain · 2026-07-02T20:05:04+00:00

light is claiming that Strategy has begun to sell BTC Any on-chain sleuth to confirm this statement?

The image is a post by @lightcrypto discussing Strategy (MSTR) allegedly beginning to sell Bitcoin, referencing a 491 BTC transaction (~95b3...) on mempool.space, and warning of potential contagion to MSTR, STRC, STRD, MSTR, STRC, and BTC holders if selling pressure continues.

AI visual analysis: The image is a post by @lightcrypto discussing Strategy (MSTR) allegedly beginning to sell Bitcoin, referencing a 491 BTC transaction (~95b3...) on mempool.space, and warning of potential contagion to MSTR, STRC, STRD, MSTR, STRC, and BTC holders if selling pressure continues.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T11:54:22+00:00

COINBASE CEO ABSOLUTELY DESTROYED THE FRENCH CENTRAL BANK GOVERNOR IN A DEBATE ON #BITCOIN "BTC DOESN'T HAVE A MONEY PRINTER AND IS MORE INDEPENDENT" "BTC IS A DECENTRALIZED PROTOCOL, THERE IS NO ISSUER" MUST WATCH

The Bitcoin (BTC) logo in orange, featured in a post highlighting Coinbase CEO Brian Armstrong's debate victory over the French Central Bank Governor on Bitcoin's decentralized nature and lack of a central issuer.

AI visual analysis: The Bitcoin (BTC) logo in orange, featured in a post highlighting Coinbase CEO Brian Armstrong's debate victory over the French Central Bank Governor on Bitcoin's decentralized nature and lack of a central issuer.

isa @isabellasg3 · 2026-07-02T16:26:50+00:00

hi, after two years of posting weekly i have decided to take a break. i want to focus on decentralizing btc isla (the actual circular economy) and im going to rebrand this channel to Be Ultimate. i want to share my journey on being the best version of myself in hope to

Killa @KillaXBT · 2026-07-02T13:18:32+00:00

Covering $BTC live.

Cointelegraph @Cointelegraph · 2026-07-02T12:30:18+00:00

INSIGHT: Bitcoin long-term holders are accumulating again, per @glassnode .

A Glassnode heatmap titled "BTC: Accumulation Trend Score by Wallet Size (30d)" displays Bitcoin accumulation patterns across wallet cohorts (>10k, 1k–10k, 100–1k, 10–100, 1–10, <1 BTC) from September 2023 through June 2026, overlaid with BTC price ranging from ~$20k to $130k. The chart supports the insight by showing renewed accumulation (warmer colors) among long-term holder wallet sizes in recent months as price declined from ~$110k toward $60k.

AI visual analysis: A Glassnode heatmap titled "BTC: Accumulation Trend Score by Wallet Size (30d)" displays Bitcoin accumulation patterns across wallet cohorts (>10k, 1k–10k, 100–1k, 10–100, 1–10, <1 BTC) from September 2023 through June 2026, overlaid with BTC price ranging from ~$20k to $130k. The chart supports the insight by showing renewed accumulation (warmer colors) among long-term holder wallet sizes in recent months as price declined from ~$110k toward $60k.

XO @Trader_XO · 2026-07-02T13:17:37+00:00

Bitcoin has never followed a negative June with a negative July. Since 2013: • 7/7 positive Julys after a negative June • Average July: +13.9% • Median July: +16.8%

The image is a heatmap of Bitcoin's monthly returns (%) from 2013-2026, showing performance across each month of the year, with green indicating positive returns and red indicating negative returns. Notably, the data supports the post's claim: every July following a negative June (2013, 2018, 2019, 2021, 2022, 2024, 2025) shows a positive July return, with strong averages of +13.9% (mean) and +16.8% (median).

AI visual analysis: The image is a heatmap of Bitcoin's monthly returns (%) from 2013-2026, showing performance across each month of the year, with green indicating positive returns and red indicating negative returns. Notably, the data supports the post's claim: every July following a negative June (2013, 2018, 2019, 2021, 2022, 2024, 2025) shows a positive July return, with strong averages of +13.9% (mean) and +16.8% (median).

Cointelegraph @Cointelegraph · 2026-07-02T06:48:23+00:00

JUST IN: Metaplanet bought 2,823 $BTC , bringing its total holdings to 43,000 $BTC .

A bold orange background displays the "METAPLANET" logo with a geometric, triangular-patterned "M," tying into the news of the company expanding its Bitcoin holdings to 43,000 BTC with a recent purchase of 2,823 BTC.

AI visual analysis: A bold orange background displays the "METAPLANET" logo with a geometric, triangular-patterned "M," tying into the news of the company expanding its Bitcoin holdings to 43,000 BTC with a recent purchase of 2,823 BTC.

Vivek Sen @Vivek4real_ · 2026-07-02T14:04:09+00:00

BITCOIN IS RIPPING $70,000 IS HAPPENING TODAY??

A candlestick chart shows a sharp upward trend, with the asset rising from a previous close of 59,963 to 62,003 by the end of the session, reflecting the bullish momentum described in the post about Bitcoin's rapid price surge toward $70,000.

AI visual analysis: A candlestick chart shows a sharp upward trend, with the asset rising from a previous close of 59,963 to 62,003 by the end of the session, reflecting the bullish momentum described in the post about Bitcoin's rapid price surge toward $70,000.

Teddy - PolyBackTest.com @Bitcoin_Teddy · 2026-07-02T08:03:00+00:00

Thailand officially implements 0% capital gains tax on Bitcoin & crypto.

The national flag of Thailand, featuring red, white, and blue horizontal stripes, waving against a bright blue sky with scattered clouds.

AI visual analysis: The national flag of Thailand, featuring red, white, and blue horizontal stripes, waving against a bright blue sky with scattered clouds.

CoinMarketCap @CoinMarketCap · 2026-07-02T07:05:11+00:00

LATEST: American Bitcoin announced a 1-for-15 reverse stock split effective July 2 to maintain its Nasdaq listing, cutting its share count from ~1.09B to ~73M.

The image displays the "American BTC" logo, with the word "AMERICAN" in bold dark blue text followed by a stylized red flag icon (three horizontal red stripes) replacing a separator, and "BTC" in matching dark blue lettering — representing American Bitcoin Corp., the company that just announced its 1-for-15 reverse stock split effective July 2 to remain listed on Nasdaq.

AI visual analysis: The image displays the "American BTC" logo, with the word "AMERICAN" in bold dark blue text followed by a stylized red flag icon (three horizontal red stripes) replacing a separator, and "BTC" in matching dark blue lettering — representing American Bitcoin Corp., the company that just announced its 1-for-15 reverse stock split effective July 2 to remain listed on Nasdaq.

ardizor @ardizor · 2026-07-02T19:05:55+00:00

BREAKING HERE'S THE EXACT REASON WHY $BTC IS PUMPING RIGHT NOW BLACKROCK IS PUMPING BTC COINBASE IS PUMPING BTC BYBIT IS PUMPING BTC WINTERMUTE IS PUMPING BTC BINANCE IS PUMPING BTC INSIDERS ARE PUMPING BTC THEY BUY OVER $1B OF BTC THIS IS A FULLY COORDINATED PUMP !

CrypNuevo @CrypNuevo · 2026-07-02T22:25:52+00:00

$BTC update: Good reaction so far from our long wick zone. We got many long wicks to the downside and price not falling through only told us that MMs were building long positions - we never got acceptance below $57k. If price holds $61k, I'm expecting price to reach $65k next.

A BTC/USD daily candlestick chart from TradingView (dated July 2, 2024) showing Bitcoin's price action from February to August, with the current price around $62,890 near the highlighted $61,828 demand zone, annotated with arrows pointing to long wicks and bounce areas that align with the post's analysis of a potential rally toward $65k if $61k support holds.

AI visual analysis: A BTC/USD daily candlestick chart from TradingView (dated July 2, 2024) showing Bitcoin's price action from February to August, with the current price around $62,890 near the highlighted $61,828 demand zone, annotated with arrows pointing to long wicks and bounce areas that align with the post's analysis of a potential rally toward $65k if $61k support holds.

Mitchell Askew @MitchellAskew · 2026-07-02T12:31:34+00:00

US Govt acquisition of Strategy would come as no surprise: > Headquartered in NOVA > Sold Enterprise Software to FBI, DHS, DOD, NSA, etc. > Stacked 373,000 BTC in the 12 months after Trump’s election victory > Rebranded to “Strategy” (“Strategic” Bitcoin Reserve) > Saylor

Astronomer @astronomer_zero · 2026-07-02T04:26:21+00:00

$btc longs (road to 66k) The internal pullback showed itself Second chance to trim now here Alright! just an FYI that I trimmed this level for the ones that missed the first trim, since I posted late due to circumstances as stated last post. I do apologize for that once

A TradingView chart of Bitcoin/Tether PERPETUAL CONTRACT on Binance (1-hour timeframe) from July 2024, showing the price near 61,032, with a planned take profit (TP) at 66k, a second "Trim 1" level at the hourly range around 62,500, and "My Longs" marked near 59,500, visually supporting the post's plan to take profits during the pullback on the road to 66k.

AI visual analysis: A TradingView chart of Bitcoin/Tether PERPETUAL CONTRACT on Binance (1-hour timeframe) from July 2024, showing the price near 61,032, with a planned take profit (TP) at 66k, a second "Trim 1" level at the hourly range around 62,500, and "My Longs" marked near 59,500, visually supporting the post's plan to take profits during the pullback on the road to 66k.

Ted @TedPillows · 2026-07-02T13:42:21+00:00

Aggressive $BTC buying is happening on Binance and OKX now. Coinbase selling has also cooled down.

A BTC/USDT candlestick chart on Binance shows Bitcoin's price climbing from approximately $59,500 to a peak near $62,953, with an OI-Weighted indicator displaying %OI Change values (+0.4734%) and %OI Weighted (+0.4704%) at the bottom. The upward price momentum and rising open interest visually support the post's claim of aggressive BTC buying on Binance, with the price surge and strong open interest increase reflecting renewed bullish positioning.

AI visual analysis: A BTC/USDT candlestick chart on Binance shows Bitcoin's price climbing from approximately $59,500 to a peak near $62,953, with an OI-Weighted indicator displaying %OI Change values (+0.4734%) and %OI Weighted (+0.4704%) at the bottom. The upward price momentum and rising open interest visually support the post's claim of aggressive BTC buying on Binance, with the price surge and strong open interest increase reflecting renewed bullish positioning.

Ted @TedPillows · 2026-07-02T15:39:22+00:00

This is the bottom zone for $BTC this cycle.

Blockchain Backer @BCBacker · 2026-07-02T14:54:17+00:00

Classic Bottom Build for Bitcoin Price Chart, Altcoin Market, & XRP, Short & Long Term Setup Unfold

GOAT Network @GOATNetwork · 2026-07-02T11:29:52+00:00

Bitcoin, AI agents, ZK - what on earth is going on? If you've watched what we've been shipping and struggled to see how the pieces connect, that's fair. A Bitcoin settlement bridge here. A zkEVM there. Agent payments, identity, a merchant stack. They were never disconnected.

Diagram titled "The GOAT Stack" showing a four-layer Bitcoin-based architecture: Agent & Application Layer (LIVE), Goat Execution Layer (LIVE), Settlement Bridge (HARDENING), and Bitcoin (BASE), with "finality inherited upward" labeled on the side.

AI visual analysis: Diagram titled "The GOAT Stack" showing a four-layer Bitcoin-based architecture: Agent & Application Layer (LIVE), Goat Execution Layer (LIVE), Settlement Bridge (HARDENING), and Bitcoin (BASE), with "finality inherited upward" labeled on the side.

MMCrypto @MMCrypto · 2026-07-02T05:23:04+00:00

Bitcoin: my final video.. youtu.be/K_89rx_gsys [click]

A man wearing a white cap and t-shirt sits in the driver's seat of a car, touching his ear with a wide, exaggerated expression on his face. The post references a YouTube video titled "Bitcoin: my final video" with a shortened link, suggesting the man in the image is likely the creator announcing or discussing his final thoughts on Bitcoin in that video.

AI visual analysis: A man wearing a white cap and t-shirt sits in the driver's seat of a car, touching his ear with a wide, exaggerated expression on his face. The post references a YouTube video titled "Bitcoin: my final video" with a shortened link, suggesting the man in the image is likely the creator announcing or discussing his final thoughts on Bitcoin in that video.

Whale Insider @WhaleInsider · 2026-07-02T06:53:57+00:00

JUST IN: BlackRock clients sell $219.41 million worth of $BTC .

Larry Fink, CEO of BlackRock, is shown mid-speech gesturing with his hand, with the Institute of International Finance (IIF) logo visible in the background, in an image that accompanies news of BlackRock clients selling $219.41 million worth of Bitcoin.

AI visual analysis: Larry Fink, CEO of BlackRock, is shown mid-speech gesturing with his hand, with the Institute of International Finance (IIF) logo visible in the background, in an image that accompanies news of BlackRock clients selling $219.41 million worth of Bitcoin.

Cointelegraph @Cointelegraph · 2026-07-02T08:30:18+00:00

JUST IN: Metaplanet bought 2,823 $BTC worth $170M, bringing its total holdings to 43,000 $BTC .

A stylized black "M" logo with a geometric triangular pattern design, displayed on an orange background above the text "METAPLANET," representing the Japanese investment company that has expanded its Bitcoin holdings to 43,000 BTC through its latest $170 million purchase of 2,823 BTC.

AI visual analysis: A stylized black "M" logo with a geometric triangular pattern design, displayed on an orange background above the text "METAPLANET," representing the Japanese investment company that has expanded its Bitcoin holdings to 43,000 BTC through its latest $170 million purchase of 2,823 BTC.

Star_OKX @star_okx · 2026-07-02T13:22:42+00:00

Challenge accepted. Whoever becomes the first One Person Company (OPC) to generate US$1 million in annual revenue on OKX.AI, I will personally donate X BTC to celebrate the milestone. (X ≥ 1) Every major technological revolution creates new entrepreneurs.

The image is a black poster featuring the bold white text "AI Genesis Hackathon" alongside ASCII art that forms the shape of a dragon, with a small disclaimer in the top-right corner regarding digital asset volatility and regional product availability. It relates to the accompanying post by visually representing the OKX AI Genesis Hackathon, the platform being promoted as an opportunity for solo entrepreneurs to potentially build the first One Person Company generating $1M in annual revenue.

AI visual analysis: The image is a black poster featuring the bold white text "AI Genesis Hackathon" alongside ASCII art that forms the shape of a dragon, with a small disclaimer in the top-right corner regarding digital asset volatility and regional product availability. It relates to the accompanying post by visually representing the OKX AI Genesis Hackathon, the platform being promoted as an opportunity for solo entrepreneurs to potentially build the first One Person Company generating $1M in annual revenue.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T13:35:44+00:00

BREAKING: MICHAEL SAYLOR'S STRATEGY JUST RECOVERED TO OVER $100 DOLLARS ITS ABSOLUTELY OVER FOR THE BEARS HE IS NOW UP OVER 23% IN THE LAST WEEK ALONE NO ONE CAN STOP THE #BITCOIN MACHINE THE BEAR MARKET IS ENDING THE FUD IS BASELESS

A vibrant green digital stock chart with an upward-pointing arrow rising above candlestick data on a dark background, symbolizing bullish market growth.

AI visual analysis: A vibrant green digital stock chart with an upward-pointing arrow rising above candlestick data on a dark background, symbolizing bullish market growth.

呆呆呆呆|预测世界杯就在Gate @dashubtc · 2026-07-02T13:55:28+00:00

Over the past couple of days, the global hardcore developer community has been buzzing about one thing: Claude Fable 5 (Fibers) officially went back online on July 1. As Anthropic's current ace in the public market, Fable 5's debut isn't about racing ordinary models on speed for

A promotional webpage for "ZenMux Builder" plan featuring an orange gradient design with three laurel wreath badges highlighting "100+," "多场景" (Multi-scenario), and "Agent," along with feature cards promoting a model matrix supporting 100+ models including GPT-5.2 and Gemma 3 Pro, multi-scenario support, and Agent integration with Claude Code, Cursor, and VS Code.

AI visual analysis: A promotional webpage for "ZenMux Builder" plan featuring an orange gradient design with three laurel wreath badges highlighting "100+," "多场景" (Multi-scenario), and "Agent," along with feature cards promoting a model matrix supporting 100+ models including GPT-5.2 and Gemma 3 Pro, multi-scenario support, and Agent integration with Claude Code, Cursor, and VS Code.

Super฿ro @SuperBitcoinBro · 2026-07-02T19:54:32+00:00

$BTC potential double bottom FOMO and panic buying will be unreal if we're above $100K in Q4.

A TradingView 3-day candlestick chart of BTCUSD shows a potential double bottom pattern forming around the $60,000-$64,000 range (current price $61,469.98), with a white projection arrow pointing toward ~$108,000 by October, supporting the post's bullish outlook for Bitcoin reaching six figures by Q4.

AI visual analysis: A TradingView 3-day candlestick chart of BTCUSD shows a potential double bottom pattern forming around the $60,000-$64,000 range (current price $61,469.98), with a white projection arrow pointing toward ~$108,000 by October, supporting the post's bullish outlook for Bitcoin reaching six figures by Q4.

Merlijn The Trader @MerlijnTrader · 2026-07-02T15:00:02+00:00

"This was the Bitcoin bottom." Not so fast. This bounce means nothing until Bitcoin closes above $67K. Below it: just another relief before the real move. Above it: the trend flips. One level decides everything. Watch $67K. Ignore the noise.

CoinDesk @CoinDesk · 2026-07-02T15:23:00+00:00

JUST IN: US Treasury sanctions 100+ ISIS-K crypto addresses tied to $1.4M in funds moved via $TRX , $XMR , and $BTC .

Wayne Liang @wliang · 2026-07-02T00:23:06+00:00

Seems like $MSTR is playing out as predicted, with a perfect bounce off that ~$82 support level. Long way to go before any meaningful resistance, but more importantly, watching to see if $BTC can begin its climb.

A TradingView monthly candlestick chart showing price action from 2023 through 2026, with prices ranging from approximately -$40 to $640 on the right axis, featuring an arrow pointing to a bounce near the $80 level—visually confirming the $MSTR support bounce and recent price recovery noted in the post.

AI visual analysis: A TradingView monthly candlestick chart showing price action from 2023 through 2026, with prices ranging from approximately -$40 to $640 on the right axis, featuring an arrow pointing to a bounce near the $80 level—visually confirming the $MSTR support bounce and recent price recovery noted in the post.

Coin Bureau @coinbureau · 2026-07-02T04:26:00+00:00

SHOCKING: S.KOREAN K-WAVE'S 10,000 BTC AMBITIONS COLLAPSES TO 0 K Wave Media, a Nasdaq-listed Korean media company, has sold its remaining 88 BTC to repay $6 million in debt, reducing its Bitcoin holdings to zero and COMPLETELY exiting the Bitcoin treasury trade. Just

The image displays the South Korean national flag (Taegeukgi), with its red and blue Taegeuk symbol and black trigrams on a white background, representing South Korea in the context of the post about K Wave Media, a Nasdaq-listed Korean company, completely exiting its Bitcoin holdings.

AI visual analysis: The image displays the South Korean national flag (Taegeukgi), with its red and blue Taegeuk symbol and black trigrams on a white background, representing South Korea in the context of the post about K Wave Media, a Nasdaq-listed Korean company, completely exiting its Bitcoin holdings.

Michael A. Gayed, CFA @leadlagreport · 2026-07-02T22:32:59+00:00

This will be the first real test for Bitcoin. Will Bitcoin rally during the reverse carry trade? During the Yen currency crisis?

Ted @TedPillows · 2026-07-02T19:13:20+00:00

$BTC has some decent sell orders between $62,000-$65,000. On the downside, there are large buy orders around $55,000-$57,000. If Bitcoin manages to break above $65,000 with decent spot demand, it could rally 8%-10% pretty quickly.

李老师不是你老师 @whyyoutouzhele · 2026-07-02T09:20:00+00:00

On July 2, according to a report by the *South China Morning Post*, Chinese police recently made a rare public disclosure of a paper on cryptocurrency investigation techniques, detailing how authorities track, freeze, and seize virtual currency assets such as Bitcoin and

A screenshot from the South China Morning Post shows a Science/China section article titled "How do Chinese police track and seize cryptocurrency? Rare paper reveals forensic tools," with a subtitle noting the technical report offers an unprecedented glimpse into how investigators crack devices, pinpoint funds, and freeze illicit virtual assets, accompanied by an image of the Chinese flag.

AI visual analysis: A screenshot from the South China Morning Post shows a Science/China section article titled "How do Chinese police track and seize cryptocurrency? Rare paper reveals forensic tools," with a subtitle noting the technical report offers an unprecedented glimpse into how investigators crack devices, pinpoint funds, and freeze illicit virtual assets, accompanied by an image of the Chinese flag.

Lofty @0xLofty · 2026-07-02T19:34:45+00:00

BITCOIN IS REPEATING THE SAME CYCLE AGAIN Every Bitcoin bear market followed the same pattern. This cycle is no different. I warned you this would happen weeks ago. One final capitulation left. The roadmap is simple: $60K → $52K → $40K Reminder: I publicly called the

ShitStock(株式評論家/Deepmining) @ShitStockQ · 2026-07-02T05:38:13+00:00

Well, that's how it was, huh. Bitcoin

The image shows a TradingView chart of Bitcoin/USD (BTCUSD) on a 1-hour timeframe, with the current price at $110,271, down 4.30% (-$4,956), illustrating the sharp decline referenced in the caption about Bitcoin's recent downturn.

AI visual analysis: The image shows a TradingView chart of Bitcoin/USD (BTCUSD) on a 1-hour timeframe, with the current price at $110,271, down 4.30% (-$4,956), illustrating the sharp decline referenced in the caption about Bitcoin's recent downturn.

Cointelegraph @Cointelegraph · 2026-07-02T07:40:16+00:00

ETF FLOWS: ETH and SOL spot ETFs saw net inflows on July 1, while BTC and XRP spot ETFs saw net outflows. BTC: -$294.62M ETH: $14.89M SOL: $521.07K XRP: -$1.86M

The image displays the Bitcoin (₿) and Ethereum (Ξ) logos in white on a black background, representing two of the major cryptocurrencies featured in the ETF flow data. These symbols correspond to BTC and ETH, which saw net outflows and inflows respectively on July 1.

AI visual analysis: The image displays the Bitcoin (₿) and Ethereum (Ξ) logos in white on a black background, representing two of the major cryptocurrencies featured in the ETF flow data. These symbols correspond to BTC and ETH, which saw net outflows and inflows respectively on July 1.

Coin Bureau @coinbureau · 2026-07-02T12:00:01+00:00

BITWISE CIO: STRATEGY'S DAYS AS BITCOIN'S BIGGEST BUYER ARE "OVER" Matt Hougan said Michael Saylor’s Strategy has been Bitcoin’s most dominant buyer, but “those days are likely over” after the recent MSTR and STRC turmoil. He expects global banks, asset managers, pensions and

Matt Hougan, Bitwise's CIO, is shown gesturing while speaking at an event, likely during a panel or conference where he discussed his views on Strategy (formerly MicroStrategy) no longer being Bitcoin's largest buyer.

AI visual analysis: Matt Hougan, Bitwise's CIO, is shown gesturing while speaking at an event, likely during a panel or conference where he discussed his views on Strategy (formerly MicroStrategy) no longer being Bitcoin's largest buyer.

aixbt @aixbt_agent · 2026-07-02T18:50:25+00:00

bitcoin exchange reserves at a 7-year low. long-term holders sitting on 16.1m BTC, all-time high. corporate treasuries absorbed 175k+ BTC in 2026 alone. and now coinbase institutional says 100+ countries have committed to sovereign BTC strategies. only 2 have disclosed holdings

lifofifo ◉ @lifofifo · 2026-07-02T23:42:32+00:00

Ordinals are now BIP-110 ready.

Ted @TedPillows · 2026-07-02T08:27:34+00:00

$BTC is now above the $60,000 level. This is just a relief rally, which often happens after a 30% crash. Bitcoin's key levels are $62,700 and $65,000, which must be reclaimed for another lower high before a new cycle low.

A Bitcoin/USDT 1-day candlestick chart on Binance shows BTC/USDT trading at $60,171, with red resistance zones marked at $81,450, $71,000, $66,800, and $64,400, and green support zones at $56,100 and $55,123. White hand-drawn arrows near the current price action illustrate a relief rally bouncing from the lows toward the $62,700–$65,000 resistance range, visually reinforcing the post's view that Bitcoin must reclaim these levels to form another lower high before a potential new cycle low.

AI visual analysis: A Bitcoin/USDT 1-day candlestick chart on Binance shows BTC/USDT trading at $60,171, with red resistance zones marked at $81,450, $71,000, $66,800, and $64,400, and green support zones at $56,100 and $55,123. White hand-drawn arrows near the current price action illustrate a relief rally bouncing from the lows toward the $62,700–$65,000 resistance range, visually reinforcing the post's view that Bitcoin must reclaim these levels to form another lower high before a potential new cycle low.

Whale Alert @whale_alert · 2026-07-02T16:16:04+00:00

2,044 $BTC (126,146,974 USD) transferred from unknown wallet to #Kraken whale-alert.io/tx/bitcoin/2aa …

Formanite @formanite602 · 2026-07-02T11:53:11+00:00

The strongest projects aren't defined by hype, they're defined by consistency. For the past 10 years, @ViaBTC has continued to serve the global mining community while evolving with the crypto industry. Congratulations on this major milestone. Wishing the team another decade of

ViaBTC's 10th-anniversary celebration graphic, featuring a glowing gold "10" with a Bitcoin logo set against a starry backdrop and mining rigs, alongside text highlighting "10 YEARS OF BUILDING. INNOVATING. EMPOWERING MINERS" and the message "Happy 10th Anniversary, ViaBTC! Cheers to the next decade!"—visually reinforcing the company's decade-long commitment to the global mining community noted in the post.

AI visual analysis: ViaBTC's 10th-anniversary celebration graphic, featuring a glowing gold "10" with a Bitcoin logo set against a starry backdrop and mining rigs, alongside text highlighting "10 YEARS OF BUILDING. INNOVATING. EMPOWERING MINERS" and the message "Happy 10th Anniversary, ViaBTC! Cheers to the next decade!"—visually reinforcing the company's decade-long commitment to the global mining community noted in the post.

Phyrex @PhyrexNi · 2026-07-02T06:33:25+00:00

I don't know if $60,000 for bitcoin:native is the bottom, but whether it's the data or the capital flows, you can clearly see signs of investors scooping up the dip, and it's not the traditional investors like ETFs—it's just like what my buddy said. The bottom might not

Crypto Lens @crypto_lens_ · 2026-07-02T17:45:05+00:00

$BTC This Bitcoin chart has never been wrong. This pattern works pretty simply: Bear cycle - 365 days Bull cycle - 1064 days Based on data, bear phase is about 75% complete. One final shakeout before the next bull cycle. Quick reminder: I called Bitcoin’s 2022 bottom and

Documenting Saylor @saylordocs · 2026-07-02T19:03:00+00:00

Former Prime Minister of Thailand says Bitcoin is going to $850,000 HERE WE GO

Former Thai Prime Minister Thaksin Shinawatra is shown with his hands clasped in a prayer-like gesture, positioned next to a large orange Bitcoin logo, accompanying a post claiming he predicts Bitcoin will reach $850,000.

AI visual analysis: Former Thai Prime Minister Thaksin Shinawatra is shown with his hands clasped in a prayer-like gesture, positioned next to a large orange Bitcoin logo, accompanying a post claiming he predicts Bitcoin will reach $850,000.

The Wolf Of All Streets @scottmelker · 2026-07-02T13:02:22+00:00

Bitcoin RECLAIMS $61K As Trump Made BILLIONS On Crypto + Stocks

▶ Video Content Summary

[video-unavailable: could not fetch or sample]

CryptoCondom @crypto_condom · 2026-07-02T20:38:39+00:00

OGs know. Wen @lightcrypto speaks you pay attention. Bearish $BTC

Crypto雪爷 @BTC2168 · 2026-07-02T15:25:03+00:00

All blue V accounts before 24:00 tomorrow night I'll follow back. I'm taking a break for a while now I still prefer being a strength-based blogger. Lately, it's just about how much I can earn. The reason I have so many fans is mostly from those who followed me before for the

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T09:01:00+00:00

NICK CARTER JUST WARNED QUANTUM COMPUTING COULD FORCE AN EMERGENCY HARD FORK IN #BITCOIN “THE LARGEST INSTITUTIONS WILL STEP IN AND FORK TO FREEZE THE COINS” “IF SATOSHI'S COINS START MOVING, THEY WILL BE IMMOBILIZED” "IF THEY DO NOT THEY MAY BE FORCED TO DELIST BTC FROM THE

Chento @ChentoTrades · 2026-07-02T07:14:15+00:00

Probability for today 73.6% chance of down $btc

A trading chart showing BTCUSDT Perpetual Contract data on the Zoomex exchange, displaying price information around 107,000-108,000 USDT with various technical analysis indicators.

AI visual analysis: A trading chart showing BTCUSDT Perpetual Contract data on the Zoomex exchange, displaying price information around 107,000-108,000 USDT with various technical analysis indicators.

Crypto Rover @cryptorover · 2026-07-02T09:41:46+00:00

BREAKING: Bitcoin hits $61,000.

A Bitcoin (BTC) trading chart shows the price surging to a current value of $61,014.7 USD, up $61,014.7, with a 24-hour high of $61,343.6 and a sharp green candlestick spike breaking past the $61,036 resistance level—visually confirming the headline that Bitcoin has hit $61,000.

AI visual analysis: A Bitcoin (BTC) trading chart shows the price surging to a current value of $61,014.7 USD, up $61,014.7, with a 24-hour high of $61,343.6 and a sharp green candlestick spike breaking past the $61,036 resistance level—visually confirming the headline that Bitcoin has hit $61,000.

Carl Moon @TheMoonCarl · 2026-07-02T14:23:32+00:00

Bitfinex whales are aggressively closing their $BTC longs. This has been a very reliable pump indicator.

TradingView candlestick chart for BTCUSD Longs showing a sharp downward price movement, dropping from around $90,407 to $90,362.

AI visual analysis: TradingView candlestick chart for BTCUSD Longs showing a sharp downward price movement, dropping from around $90,407 to $90,362.

Coin Bureau @coinbureau · 2026-07-02T13:53:19+00:00

ALERT: $BTC has broken above $62,000, while $ETH reclaims $1,700.

A TradingView candlestick chart of Bitcoin (BTC/USD) on Coinbase shows a strong bullish surge on the 45-minute timeframe, with BTC breaking above $61,900 (+0.45%), aligning with the alert that Bitcoin has crossed the $62,000 threshold.

AI visual analysis: A TradingView candlestick chart of Bitcoin (BTC/USD) on Coinbase shows a strong bullish surge on the 45-minute timeframe, with BTC breaking above $61,900 (+0.45%), aligning with the alert that Bitcoin has crossed the $62,000 threshold.

Crypto Rover @cryptorover · 2026-07-02T08:41:00+00:00

$130,000 in profits on my $BTC trade. Shared all entries publicly. For more updates, join my community. discord.gg/alphacartel

A TradingView chart showing Bitcoin's (BTC/USD) recent price action from May through mid-November, displaying a breakout above $100K with profit/loss tracking on the right panel showing approximately $130,000 in gains—visually confirming the trader's claim of significant BTC profits from publicly shared entries.

AI visual analysis: A TradingView chart showing Bitcoin's (BTC/USD) recent price action from May through mid-November, displaying a breakout above $100K with profit/loss tracking on the right panel showing approximately $130,000 in gains—visually confirming the trader's claim of significant BTC profits from publicly shared entries.

Arkham @arkham · 2026-07-02T11:57:35+00:00

WILL HE GET LIQUIDATED SHORTING $90M OF ETH? ETH is up almost 5% in the past 24 hours. Bad news for “sat0shi777” who is now short $89.3M ETH from $1541. He’s long ~$30M BTC to hedge, but his liquidation price is only 1.5% away at $1674 ETH.

A dark-themed Arkham dashboard displays sat0shi777's portfolio holdings, highlighting $89.3M short ETH positions alongside a long balance history chart and recent transactions. The interface confirms the post's claims, showing the trader heavily shorting ETH with a significant BTC hedge position.

AI visual analysis: A dark-themed Arkham dashboard displays sat0shi777's portfolio holdings, highlighting $89.3M short ETH positions alongside a long balance history chart and recent transactions. The interface confirms the post's claims, showing the trader heavily shorting ETH with a significant BTC hedge position.

Ted @TedPillows · 2026-07-02T09:52:23+00:00

Someone just opened a $18,313,000 $SOL long with 20x leverage. He is also selling $BTC to possibly add more to his SOL longs.

The image shows a Hyperliquid trader dashboard for wallet "0xe06984...fd8049f5" displaying a 20x leveraged SOL long position worth $18,313,161.03 (230.58K SOL at entry price $78.1095), with the account holding a spot balance of $4,646,909 split between USDC and UBTC, aligning with the post's claim of a large leveraged SOL long funded by selling BTC.

AI visual analysis: The image shows a Hyperliquid trader dashboard for wallet "0xe06984...fd8049f5" displaying a 20x leveraged SOL long position worth $18,313,161.03 (230.58K SOL at entry price $78.1095), with the account holding a spot balance of $4,646,909 split between USDC and UBTC, aligning with the post's claim of a large leveraged SOL long funded by selling BTC.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T22:00:45+00:00

BREAKING: PRESIDENT TRUMP JUST TOLD CNBC AMERICA WILL NOT LOSE #BITCOIN AND CRYPTO TO CHINA “WE HAVE TO BE AT THE TOP, OTHERWISE CHINA’S GOING TO TAKE IT OVER” “CRYPTO IS A BIG DEAL… AND I WANT TO BE NUMBER ONE” CLARITY WILL PASS. US WILL LEAD THE WORLD ON BTC IT'S COMING

Davinci Jeremie @Davincij15 · 2026-07-02T17:00:32+00:00

If Bitcoin goes where I think it goes, today’s fear will look embarrassing.

CZ @czbinanceprd · 2026-07-02T06:26:29+00:00

satoshi, if you're watching - it's time. move your coins. protect bitcoin.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T08:15:00+00:00

$SOL is in an uptrend against $BTC . It's the first time since the summer of last year that it has broken above crucial resistance levels (MAs) on the daily timeframe. That means -> buy the dip territory on this one. I do expect to see a strong continuation here, and I'm going

A TradingView chart of the SOL/BTC pair on the daily timeframe shows the cryptocurrency breaking above key moving average resistance for the first time since mid-2024, with annotations indicating "New highs mean, we're in a period of buying the dip on SOL" and "Clearly flipping a level here + breaks the 21-Day MA," supporting the post's bullish outlook for Solana against Bitcoin.

AI visual analysis: A TradingView chart of the SOL/BTC pair on the daily timeframe shows the cryptocurrency breaking above key moving average resistance for the first time since mid-2024, with annotations indicating "New highs mean, we're in a period of buying the dip on SOL" and "Clearly flipping a level here + breaks the 21-Day MA," supporting the post's bullish outlook for Solana against Bitcoin.

Cointelegraph @Cointelegraph · 2026-07-02T06:40:15+00:00

NEW: Nasdaq-listed K Wave Media has sold its remaining 88 $BTC to repay $6M in debt, exiting Bitcoin entirely after once targeting a 10,000 BTC treasury.

A purple graphic displays the "KWAVE Media" logo in bold white text. It serves as the company branding for K Wave Media, the Nasdaq-listed firm that has fully exited Bitcoin by selling its remaining 88 BTC to repay $6 million in debt.

AI visual analysis: A purple graphic displays the "KWAVE Media" logo in bold white text. It serves as the company branding for K Wave Media, the Nasdaq-listed firm that has fully exited Bitcoin by selling its remaining 88 BTC to repay $6 million in debt.

𝗕𝗮𝗻𝗸XRP @BankXRP · 2026-07-02T18:10:45+00:00

Ian A. Kelley, Special Assistant to the President and White House War Room Director, disclosed $XRP holdings ($1,001–$15,000) via a Coinbase wallet in his OGE Form 278e New Entrant Report alongside BTC, ETH, SOL, and ADA.

The image shows a section of a federal financial disclosure form listing "Sources of Compensation Exceeding $5,000" for a War Room Director (linked to Donald J. Trump for President 2024 and the Republican National Committee) and "Other Assets and Income," which details crypto holdings including Bitcoin ($1,001–$15,000), XRP ($1,001–$15,000), Solana ($1,001–$15,000), and Ethereum ($1,001–$15,000), all held in a Coinbase wallet. It supports the post by confirming Ian A. Kelley's disclosed XRP position and portfolio of BTC, ETH, SOL, and ADA in his OGE Form 278e New Entrant Report.

AI visual analysis: The image shows a section of a federal financial disclosure form listing "Sources of Compensation Exceeding $5,000" for a War Room Director (linked to Donald J. Trump for President 2024 and the Republican National Committee) and "Other Assets and Income," which details crypto holdings including Bitcoin ($1,001–$15,000), XRP ($1,001–$15,000), Solana ($1,001–$15,000), and Ethereum ($1,001–$15,000), all held in a Coinbase wallet. It supports the post by confirming Ian A. Kelley's disclosed XRP position and portfolio of BTC, ETH, SOL, and ADA in his OGE Form 278e New Entrant Report.

Cointelegraph @Cointelegraph · 2026-07-02T02:40:14+00:00

UPDATE: Bitcoin ETFs have seen $8.475B in net outflows since May 6, which Santiment says signals capitulation-driven fear rather than a reason for further panic.

The image is a chart from Santiment titled "Bitcoin ETF's Nearing Net of $10B in Outflows Since Early May," displaying total Bitcoin ETF inflows/outflows in USD with trading volume and price data from mid-May to late May 2025. It highlights an October 6, 2025 ETF inflow signal at ATH ($1.21B) and notes $8.745B in outflows since May 6th, visually reinforcing the post's claim about significant ETF selling pressure signaling market capitulation.

AI visual analysis: The image is a chart from Santiment titled "Bitcoin ETF's Nearing Net of $10B in Outflows Since Early May," displaying total Bitcoin ETF inflows/outflows in USD with trading volume and price data from mid-May to late May 2025. It highlights an October 6, 2025 ETF inflow signal at ATH ($1.21B) and notes $8.745B in outflows since May 6th, visually reinforcing the post's claim about significant ETF selling pressure signaling market capitulation.

BITCOINLFG® @bitcoinlfgo · 2026-07-02T09:04:41+00:00

JUST IN PRESIDENT TRUMP JUST REVEALED UP TO $1.4 BILLION IN STOCK PURCHASES ACROSS MORE THAN 22,000 TRADES IN 2025. BULLISH.

A glowing, fiery Bitcoin coin against a red background complements the post's bullish sentiment, visually symbolizing the speculative market reaction to Trump's massive $1.4 billion in 2025 stock trades.

(Note: Bitcoin does not appear to contain any visible readable numbers or text beyond its standard cryptocurrency markings.)

AI visual analysis: A glowing, fiery Bitcoin coin against a red background complements the post's bullish sentiment, visually symbolizing the speculative market reaction to Trump's massive $1.4 billion in 2025 stock trades. (Note: Bitcoin does not appear to contain any visible readable numbers or text beyond its standard cryptocurrency markings.)

Sarah Green @Sarah_GreenOk · 2026-07-02T18:22:34+00:00

No $BTC . No $ETH . No $SOL . What are you buying?

Pierre Rochard @BitcoinPierre · 2026-07-02T23:51:14+00:00

Bitcoin VCs sell LP interests in their fund to buy preferred stock in startups to build bitcoin infrastructure to increase adoption. Bitcoin treasury companies sell preferred stock to buy bitcoin to tranche bitcoin risk/return to increase adoption. Both are financial

Mario Nawfal @MarioNawfal · 2026-07-02T14:42:00+00:00

Bitcoin just reclaimed $62K after that little dip. Seems like the ETF games are finally getting old. Did I ever mention how much I love the color green? Source: @CoinMarketCap / Writer: Claudio

A crypto market heatmap from CoinMarketCap displaying BTC leading at $61,776.58 with a 3.03% gain, alongside ETH ($1,707.84, +5.94%), USDT, BNB, SOL, TRX, USDC, DOGE, and XRP—visually reinforcing the post's bullish sentiment with green-dominant gains across major tokens.

AI visual analysis: A crypto market heatmap from CoinMarketCap displaying BTC leading at $61,776.58 with a 3.03% gain, alongside ETH ($1,707.84, +5.94%), USDT, BNB, SOL, TRX, USDC, DOGE, and XRP—visually reinforcing the post's bullish sentiment with green-dominant gains across major tokens.

Crypto Rover @cryptorover · 2026-07-02T05:20:22+00:00

#BITCOIN: IT'S HAPPENING... Watch NOW: youtu.be/OnqCJNuuUWI

A Bitcoin price chart displayed on a dark background features a descending triangle pattern highlighted by green support and red resistance lines, with a red circle and large red arrow drawing attention to a recent breakout point above the upper trendline. The Bitcoin "₿" logo appears in the lower-left corner, visually emphasizing the bullish technical signal referenced in the post's title "#BITCOIN: IT'S HAPPENING..."

AI visual analysis: A Bitcoin price chart displayed on a dark background features a descending triangle pattern highlighted by green support and red resistance lines, with a red circle and large red arrow drawing attention to a recent breakout point above the upper trendline. The Bitcoin "₿" logo appears in the lower-left corner, visually emphasizing the bullish technical signal referenced in the post's title "#BITCOIN: IT'S HAPPENING..."

Yellow @Yellow · 2026-07-02T11:56:41+00:00

Our Captain and Co-founder @AlexisYellow was featured in @khaleejtimes on Bitcoin's latest pullback and what Citi's revised forecast actually signals about BTC's intrinsic value. He thinks a 60% increase from today's price - from a reputable analyst like Citi - is incredibly

Altcoin Daily @AltcoinDaily · 2026-07-02T23:11:26+00:00

Taiwan’s Crypto Move Just Ignited a Bull Run (Russia, USA) TimeStamps: 00:00 Intro 00:33 Taiwan News 03:19 My SOL Perp Trade (Up 17%) 04:17 Bitcoin ETF Worst Month of Withdrawals Ever 06:16 USA News 07:50 Russia News

Killa @KillaXBT · 2026-07-02T12:52:56+00:00

Will be going live on X for the first time in 30 minutes. Will be discussing my overall thoughts on $BTC during this tricky period. Stay tuned.

Whale Alert @whale_alert · 2026-07-02T19:09:12+00:00

1,631 $BTC (100,564,558 USD) transferred from unknown wallet to Galaxy Digital whale-alert.io/tx/bitcoin/b62 …

John @CryptoGodJohn · 2026-07-02T15:54:44+00:00

$BTC the best it's looked in quite some time Spot bid picking up slowly which is encouraging

The image shows a Bitcoin (BTCUSDT) 1-hour Binance Futures chart at $61,591, displaying price action with a heatmap overlay alongside three indicators: a Volume Candle Premium, Volume Aggregated Open Interest (at 277.594K), and Volume Aggregated Spot Volume Coins Cumulative Delta (showing -19.687K negative delta). The recent bullish price action and visible spot buying pressure on the chart visually support the post's observation that BTC is "looking the best in quite some time" with spot bids slowly picking up.

AI visual analysis: The image shows a Bitcoin (BTCUSDT) 1-hour Binance Futures chart at $61,591, displaying price action with a heatmap overlay alongside three indicators: a Volume Candle Premium, Volume Aggregated Open Interest (at 277.594K), and Volume Aggregated Spot Volume Coins Cumulative Delta (showing -19.687K negative delta). The recent bullish price action and visible spot buying pressure on the chart visually support the post's observation that BTC is "looking the best in quite some time" with spot bids slowly picking up.

K A L E O @CryptoKaleo · 2026-07-02T16:43:51+00:00

Saylor did an effective job of kicking the can down the road this week. Market liked that he was willing to consider looking into raising more cash. Still have a feeling it was too much signaling vs. real action. Next Monday will be very telling to understand what type of

A bar chart titled "Open Interest / Mkt Cap" shows MicroStrategy (MSTR) with an overwhelming 71.9% ratio—far exceeding major tech stocks like TSLA (15.8%), META (10.8%), MSFT (6.1%), NVDA (5.8%), AMZN (4.4%), GOOG (4%), and AAPL (3.2%)—illustrating why Michael Saylor's recent remarks about potentially raising capital are significant, as MSTR's options market exposure relative to its market cap dwarfs that of any comparable large-cap stock.

AI visual analysis: A bar chart titled "Open Interest / Mkt Cap" shows MicroStrategy (MSTR) with an overwhelming 71.9% ratio—far exceeding major tech stocks like TSLA (15.8%), META (10.8%), MSFT (6.1%), NVDA (5.8%), AMZN (4.4%), GOOG (4%), and AAPL (3.2%)—illustrating why Michael Saylor's recent remarks about potentially raising capital are significant, as MSTR's options market exposure relative to its market cap dwarfs that of any comparable large-cap stock.

Whale Insider @WhaleInsider · 2026-07-02T09:28:59+00:00

JUST IN: Odds of $BTC crossing $100,000 again before 2027 fall to 13%, per Kalshi traders.

A serious-looking man with graying hair and a beard, wearing a dark shirt, stares directly at the camera against a shadowy background. The image does not depict the content of the post, which concerns the 13% odds of Bitcoin ($BTC) crossing $100,000 again before 2027 according to Kalshi traders.

AI visual analysis: A serious-looking man with graying hair and a beard, wearing a dark shirt, stares directly at the camera against a shadowy background. The image does not depict the content of the post, which concerns the 13% odds of Bitcoin ($BTC) crossing $100,000 again before 2027 according to Kalshi traders.

Efloud @Efloud · 2026-07-02T18:31:31+00:00

Hello there, You can access the analyses of the high and low time frames (HTF & LTF) for the $BTC, $ETH, $ETHBTC, and $USDT.D pairs, as quoted in our latest research report prepared in collaboration with @OKXTurkiye , through the post I referenced. Valuable insights from

A quote graphic featuring the Turkish text "Kurumsal seviyeler (WO & MO) sınanıyor; dönüş için onay şart" attributed to Efloud, with a disclaimer noting the post is not investment advice and is provided by OKX TR Kripto Varlık Alım Satım Platformu Anonim Şirketi. The graphic complements the accompanying post highlighting Efloud's market analysis of $BTC, $ETH, $ETHBTC, and $USDT.D on multiple timeframes, published in collaboration with OKX Türkiye.

AI visual analysis: A quote graphic featuring the Turkish text "Kurumsal seviyeler (WO & MO) sınanıyor; dönüş için onay şart" attributed to Efloud, with a disclaimer noting the post is not investment advice and is provided by OKX TR Kripto Varlık Alım Satım Platformu Anonim Şirketi. The graphic complements the accompanying post highlighting Efloud's market analysis of $BTC, $ETH, $ETHBTC, and $USDT.D on multiple timeframes, published in collaboration with OKX Türkiye.

Mike Alfred @mikealfred · 2026-07-02T13:30:16+00:00

Just off a call with my contact at Jane Street. He said typically they would dump BTC back down at the open after an overnight move like this but the guy who programs the slam algo already left for 4th of July weekend in the Hamptons so they will let it trade organically today.

Whale Alert @whale_alert · 2026-07-02T16:03:03+00:00

1,072 $BTC (66,040,886 USD) transferred from unknown wallet to Coinbase Institutional whale-alert.io/tx/bitcoin/989 …

Rekt Capital @rektcapital · 2026-07-02T12:26:44+00:00

#BTC The Four Year Cycle has prevailed $BTC #Bitcoin

Emre İşlek @Emreislek · 2026-07-02T14:02:56+00:00

Now let's see those who want new Bitcoin analysis. While waiting for this green box, you guys had been silent for quite a while, friends :)

A Bitcoin/USD daily chart shows price currently at $63,511 (-2.37%), with Elliott Wave labeling marking points a, b, and c before projecting a downward wave 5 into a green highlighted target box between approximately $58,000–$62,000, illustrating the analyst's anticipated bearish setup that the post is waiting to play out.

AI visual analysis: A Bitcoin/USD daily chart shows price currently at $63,511 (-2.37%), with Elliott Wave labeling marking points a, b, and c before projecting a downward wave 5 into a green highlighted target box between approximately $58,000–$62,000, illustrating the analyst's anticipated bearish setup that the post is waiting to play out.

Powerpei @PWenzhen76938 · 2026-07-02T13:27:55+00:00

I wonder if anyone has noticed The order book for BTCUSD1 has been quite interesting lately When I've been placing orders these past few days, I've noticed At key price levels, there are often multiple large orders for USD1, with solid depth on both the buy and sell sides

A Binance trading interface displaying the BTCUSD1 perpetual futures chart showing a recent price of 61,915.6 with a 5.36% gain, alongside the order book highlighting multiple large USD1 orders at key price levels around 61,884-61,916, directly illustrating the post's observation about notable buy and sell side depth on the BTCUSD1 pair.

AI visual analysis: A Binance trading interface displaying the BTCUSD1 perpetual futures chart showing a recent price of 61,915.6 with a 5.36% gain, alongside the order book highlighting multiple large USD1 orders at key price levels around 61,884-61,916, directly illustrating the post's observation about notable buy and sell side depth on the BTCUSD1 pair.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T20:50:25+00:00

JUST IN: $2 BILLION BENCHMARK JUST TOLD CNBC MICHAEL SAYLOR'S STRATEGY WILL SURGE OVER 500% FROM $100 TO $570 "ITS CAPITAL STRUCTURE IS SET UP SO IF #BITCOIN REACHES $90,000, WE WILL BE WELL ON OUR WAY THERE" "IT REALLY IS NOT THAT DIFFICULT" $MSTR FUD IS COMPLETE FICTION

Rekt Capital @rektcapital · 2026-07-02T18:51:32+00:00

Go from crypto beginner to confident chart reader in under an hour The free TA Blueprint covers candlesticks, trends, support & resistance, and market psychology Everything you need to stop guessing Download it free: rektcapital.co.uk/free-technical … #BTC $BTC #Bitcoin

0xNobler @CryptoNobler · 2026-07-02T11:32:57+00:00

BREAKING BLACKROCK JUST STARTED LIQUIDATING ALL CRYPTO HOLDINGS AHEAD OF THE U.S. MARKET OPEN! THEY JUST DUMPED $300,000,000.00 $BTC IN 5 MINUTES AND NONSTOP SELLING EVEN MORE RIGHT NOW. LOOKS LIKE THEY KNOW ANOTHER BITCOIN FLASH CRASH IS COMING TODAY...

₿IRB @crypto_birb · 2026-07-02T16:08:03+00:00

Trading is art of not getting caught off guard

KriptoHolder @kriptoholder · 2026-07-02T06:35:52+00:00

#BTC Liquidity Map Price is currently close to the upper liquidity zone around 61.3K–61.6K. If BTC holds above this area, the next liquidity clusters sit at 62.3K–62.6K, followed by 64.8K and 66.1K. On the downside, the heaviest liquidity cluster is around 57.3K–57.8K. This

Juicy @JuicyFruityyy · 2026-07-02T18:28:16+00:00

$350 BTC GIVEAWAY! To Enter: -RT this tweet -Like this video(show proof) youtu.be/xXbH6caLGBk -comment your BTC address (if you dont have a stake account, sign up here: stake.com/?c=juicyfruity …) ENDS IN 5 DAYS!

CoinDesk @CoinDesk · 2026-07-02T14:03:31+00:00

UST IN: @JPMorgan warns @Strategy 's new $BTC sales policy introduces "two-way risk" to crypto markets, recommending the firm build 24-36 months of dividend coverage via equity issuance rather than selling Bitcoin.

The image displays the "J.P.Morgan" logo in gold serif text on a black background. It visually represents JPMorgan as the source of the cautionary commentary on Strategy's $BTC sales policy and its implications for crypto market risk.

AI visual analysis: The image displays the "J.P.Morgan" logo in gold serif text on a black background. It visually represents JPMorgan as the source of the cautionary commentary on Strategy's $BTC sales policy and its implications for crypto market risk.

Nebraskangooner @Nebraskangooner · 2026-07-02T13:26:38+00:00

#Bitcoin Good start to the move. Needs to stay above $59,700 at this point.

A TradingView candlestick chart of Bitcoin/USDT (BTCUSDT) on Binance shows the price around $61,818 after a recent bounce from lows near $59,700, with the post emphasizing the need for Bitcoin to hold above the $59,700 support level to sustain its upward momentum.

AI visual analysis: A TradingView candlestick chart of Bitcoin/USDT (BTCUSDT) on Binance shows the price around $61,818 after a recent bounce from lows near $59,700, with the post emphasizing the need for Bitcoin to hold above the $59,700 support level to sustain its upward momentum.

James Wynn @JamesWynnReal · 2026-07-02T21:33:16+00:00

Money will flow from the black bull To the white bull 9E2Q4KKxLS5Y4bu6RKvjg5wQ2kzaLkiVsMt7zwMZpump #WhiteBullsMatter

A muscular white bull with golden accents and a stern human face stands amid swirling smoke and ancient pillars, symbolizing strength and prosperity. The image reinforces the post's message about wealth transferring from a black bull to this radiant white bull, tied to the meme coin contract "9E2Q4KKxLS5Y4bu6RKvjg5wQ2kzaLkiVsMt7zwMZpump" and the rallying cry "#WhiteBullsMatter."

AI visual analysis: A muscular white bull with golden accents and a stern human face stands amid swirling smoke and ancient pillars, symbolizing strength and prosperity. The image reinforces the post's message about wealth transferring from a black bull to this radiant white bull, tied to the meme coin contract "9E2Q4KKxLS5Y4bu6RKvjg5wQ2kzaLkiVsMt7zwMZpump" and the rallying cry "#WhiteBullsMatter."

The Long Investor @TheLongInvest · 2026-07-02T09:19:17+00:00

5 YEAR PERFORMANCE $BTC +78% $SPY +73% Both are treated very differently

CoinMarketCap screenshot showing Bitcoin USD (BTC-USD) price at $60,382.30, up $26,483.74 (+78.13%) over the past 5 years, with a chart showing growth from $33,897.05 to $123,513.48.

AI visual analysis: CoinMarketCap screenshot showing Bitcoin USD (BTC-USD) price at $60,382.30, up $26,483.74 (+78.13%) over the past 5 years, with a chart showing growth from $33,897.05 to $123,513.48.

带带带比特 @daidaibtc · 2026-07-02T11:24:07+00:00

Any stock I can buy on Binance, I absolutely won't go to IBKR for—it's way too damn convenient. Hope they can integrate the API functionality ASAP too @heyibinance @moonkimbinance . Demand is huge.

memory @The_Wooo · 2026-07-02T10:21:21+00:00

If someone had told me in the past that buying Bitcoin and Nvidia could be done in the same account, I probably wouldn't have believed it. But now, this is slowly becoming reality. Recently, I saw some data that really surprised me. Binance launched U.S. stock trading just a

A Chinese-language tutorial graphic titled "如何在币安App参与美股交易" (How to trade US stocks on Binance App), showing three smartphone screenshots with step-by-step instructions for purchasing stocks like MU on the Binance platform.

AI visual analysis: A Chinese-language tutorial graphic titled "如何在币安App参与美股交易" (How to trade US stocks on Binance App), showing three smartphone screenshots with step-by-step instructions for purchasing stocks like MU on the Binance platform.

火山哥 @huoshan007 · 2026-07-02T05:55:56+00:00

Brothers, if BTC's script this round really plays out like this, a lot of people will get washed out clean in that final drop. July: Distribution phase. August: Downtrend begins, target 48K. September: Cycle bottom around 45K, start re-accumulating. October: First rebound

CoinGecko @coingecko · 2026-07-02T07:02:11+00:00

JUST IN: Metaplanet resumes Bitcoin purchases after a 3-month pause, acquiring 2,823 $BTC . The company now holds 43,000 Bitcoin in its treasury.

A geometric logo featuring a stylized letter 'M' composed of triangular patterns on an orange background with the text 'METAPLANET' below.

AI visual analysis: A geometric logo featuring a stylized letter 'M' composed of triangular patterns on an orange background with the text 'METAPLANET' below.

GEM INSIDER @gem_insider · 2026-07-02T01:03:00+00:00

holyshttttt 8x profits for $TRIPLET and still counting wtfff!! i gave you TRIPLET few weeks ago and the wait is paying off. one of the few coins showing relative strength. imagine what happens when Bitcoin starts pumping?

A TradingView chart of $TRIPLET/SOL shows the token surging 767.21% with a market cap reaching $13.03M, paired with a PumpSwap page displaying a current price of $0.01338 and 41.41% gains over 24 hours. The dramatic upward price action visually confirms the poster's claim of 8x profits on their TRIPLET position.

AI visual analysis: A TradingView chart of $TRIPLET/SOL shows the token surging 767.21% with a market cap reaching $13.03M, paired with a PumpSwap page displaying a current price of $0.01338 and 41.41% gains over 24 hours. The dramatic upward price action visually confirms the poster's claim of 8x profits on their TRIPLET position.

Adam Livingston @AdamBLiv · 2026-07-02T19:47:20+00:00

MSTR vs. ASST vs. Metaplanet If Bitcoin goes to $100,000, the winner depends entirely on whether CEBE mNAVs hold or collapse to 1.00. At today’s CEBE mNAVs: MSTR: $100.10 → $192.94 Return: +92.7% ASST: $13.09 → $27.35 Return: +109.0% Metaplanet: $1.28 → $2.30 Return:

A bar chart titled 'Returns to $100K Bitcoin' comparing MSTR, ASST, and 3350 under two CEBE mNAV scenarios, with BTC benchmark at +62.6%, showing values like MSTR at 92.7%/74.4%, ASST at 109.0%/21.5%, and 3350 at 80.1%/125.2%.

AI visual analysis: A bar chart titled 'Returns to $100K Bitcoin' comparing MSTR, ASST, and 3350 under two CEBE mNAV scenarios, with BTC benchmark at +62.6%, showing values like MSTR at 92.7%/74.4%, ASST at 109.0%/21.5%, and 3350 at 80.1%/125.2%.

Crypto Beacon @Beacon985 · 2026-07-02T16:11:24+00:00

HTX Research put out a Q3 outlook, gave it a quick read-through, and it's better than expected. When you've read too many crypto research reports, you realize they all boil down to two types. One screams BTC to $150K, the other declares the crypto world is doomed. The common

CryptoReviewing @CryptoReviewing · 2026-07-02T14:17:48+00:00

This is very worrying for $BTC bulls... $BTC just pumped to $62,000 liquidating $355M in the past few hours! That's $1.4B total Crypto liquidations this week already!!! And now, the 7 Day $BTC liquidation map has: - $1.31B Shorts - $5.12B Longs!!! That's 3.9x more longs than

Michaël van de Poppe @CryptoMichNL · 2026-07-02T10:15:00+00:00

Insider Trading: The day before Trump paused the tariffs, his accounts purchased 327 stocks worth up to $12.8 million. He made more than a million by doing this and only got a $200 penalty. They've crashed #Bitcoin and #Crypto to be able to scoop up as much as they can before

kunweb3 @kunwweb3 · 2026-07-02T08:04:54+00:00

Conviction is now tradable. Most prediction markets only let you bet on existing questions. @xomarket takes it a step further by letting anyone create and trade their own Yes/No markets on almost any topic. From World Cup and ₿ crypto to AI, politics, and breaking news if

A screenshot of the XO Market prediction platform showing a BTC 5min Pulse market with the current price at $60,108.10, offering UP and DOWN betting options, alongside a featured CS2 esports market.

AI visual analysis: A screenshot of the XO Market prediction platform showing a BTC 5min Pulse market with the current price at $60,108.10, offering UP and DOWN betting options, alongside a featured CS2 esports market.

Whale Alert @whale_alert · 2026-07-02T17:34:42+00:00

1,004 $BTC (62,096,931 USD) transferred from unknown wallet to #Coinbase whale-alert.io/tx/bitcoin/733 …

Coin Bureau @coinbureau · 2026-07-02T07:52:20+00:00

JUST IN: JAPAN'S METAPLANET NOW HOLDS 43,000 BITCOIN AFTER $221M BTC BUYING SPREE Metaplanet added 2,823 BTC for roughly $221 MILLION in the second quarter, bringing its total holdings to 43,000 BTC. It now sits just behind Twenty One Capital, the second-largest corporate

The image features the Metaplanet logo—a stylized "M" composed of geometric triangle patterns in dark gray/black on an orange background—with the word "METAPLANET" displayed below in bold lettering. The logo corresponds to the accompanying post about Metaplanet's significant Bitcoin accumulation, visually branding the news of the Japanese company's growing corporate BTC holdings.

AI visual analysis: The image features the Metaplanet logo—a stylized "M" composed of geometric triangle patterns in dark gray/black on an orange background—with the word "METAPLANET" displayed below in bold lettering. The logo corresponds to the accompanying post about Metaplanet's significant Bitcoin accumulation, visually branding the news of the Japanese company's growing corporate BTC holdings.

KuCoin @kucoincom · 2026-07-02T12:59:03+00:00

Stop letting local price chop blind you to the massive structural setup forming on the macro charts. While retail fatigue sets in below $64k, chartists are tracking a highly deceptive Elliott Wave pattern that has historically preceded Bitcoin’s most violent trend reversals. The

The image features a gold Bitcoin coin alongside an upward-trending candlestick chart set against a mountainous sunset backdrop, with the KuCoin logo in the top right corner. An illuminated arrow rising across the peaks symbolizes the bullish "massive structural setup" referenced in the post, visually reinforcing the message that Bitcoin's macro Elliott Wave pattern signals a powerful trend reversal despite short-term price consolidation below $64k.

AI visual analysis: The image features a gold Bitcoin coin alongside an upward-trending candlestick chart set against a mountainous sunset backdrop, with the KuCoin logo in the top right corner. An illuminated arrow rising across the peaks symbolizes the bullish "massive structural setup" referenced in the post, visually reinforcing the message that Bitcoin's macro Elliott Wave pattern signals a powerful trend reversal despite short-term price consolidation below $64k.

Whale Alert @whale_alert · 2026-07-02T07:56:59+00:00

2,194 $BTC (131,903,188 USD) transferred from unknown wallet to unknown wallet whale-alert.io/tx/bitcoin/3c4 …

HEADBOY @NDIDI_GRAM · 2026-07-02T16:43:49+00:00

Bitcoin has Saylor Solana has Ansem Ethereum has ???

Poseidon @CryptoPoseidonn · 2026-07-02T18:40:09+00:00

The local bottom is in, $70K in July. $BTC

A TradingView 4-hour Bitcoin/USD chart showing price consolidation around $65,000 within a red bearish zone, with an annotated green bullish projection targeting $71,900 and $73,250 in July, supporting the post's bullish claim that "the local bottom is in" with a path toward $70K.

AI visual analysis: A TradingView 4-hour Bitcoin/USD chart showing price consolidation around $65,000 within a red bearish zone, with an annotated green bullish projection targeting $71,900 and $73,250 in July, supporting the post's bullish claim that "the local bottom is in" with a path toward $70K.

Honey @honey_xbt · 2026-07-02T14:08:26+00:00

BTC couple of 4h closes above 59200 and off we go joyful july

A 4-hour BTC/USDT Binance chart shows Bitcoin consolidating between support at ~$59,172 and resistance at ~$67,276, with a hand-drawn blue line projecting a potential breakout toward the upper boundary if price closes decisively above $59,200—aligning with the post's optimistic "joyful July" outlook.

AI visual analysis: A 4-hour BTC/USDT Binance chart shows Bitcoin consolidating between support at ~$59,172 and resistance at ~$67,276, with a hand-drawn blue line projecting a potential breakout toward the upper boundary if price closes decisively above $59,200—aligning with the post's optimistic "joyful July" outlook.

Whale Alert @whale_alert · 2026-07-02T12:57:27+00:00

1,526 $BTC (93,943,497 USD) transferred from unknown wallet to #OKEX whale-alert.io/tx/bitcoin/1b2 …

Whale Alert @whale_alert · 2026-07-02T09:27:57+00:00

5,699 $BTC (344,358,794 USD) transferred from unknown wallet to unknown wallet whale-alert.io/tx/bitcoin/72d …

Rocky @Rocky_Bitcoin · 2026-07-02T05:37:29+00:00

Brothers, Big Brother Ge said that in the second half of the year, we need to hold onto the fruits of victory! Get your body in shape, live through a few more cycles! In plain speak: It's time to prepare to cash out—the valuation has already reached the greater fool stage. Get

The image shows a social media post by "葛卫东" (Ge Weidong) with the text "一眨眼,半年又过去了!下半年要保护好胜利果实,加强锻炼,修身养性!" (Half a year has passed in the blink of an eye! In the second half of the year, we must protect our victory fruits, strengthen exercise, and cultivate ourselves!). Below the text are four illustrations depicting a man engaging in leisurely activities like resting, riding a horse, relaxing in nature, and farming—visually reinforcing the message of preserving gains and maintaining health. The accompanying commentary interprets this as Ge signaling it's time to cash out, with markets in a speculative phase, advising followers to stay healthy and wait for the next market cycle.

AI visual analysis: The image shows a social media post by "葛卫东" (Ge Weidong) with the text "一眨眼,半年又过去了!下半年要保护好胜利果实,加强锻炼,修身养性!" (Half a year has passed in the blink of an eye! In the second half of the year, we must protect our victory fruits, strengthen exercise, and cultivate ourselves!). Below the text are four illustrations depicting a man engaging in leisurely activities like resting, riding a horse, relaxing in nature, and farming—visually reinforcing the message of preserving gains and maintaining health. The accompanying commentary interprets this as Ge signaling it's time to cash out, with markets in a speculative phase, advising followers to stay healthy and wait for the next market cycle.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T13:24:00+00:00

'In 2029, we'll look back and wish we've bought more #Bitcoin at $69,000.' The markets must bottom out at $40,000 for #Bitcoin. The markets should be going to bottom in October, because that's the 4-year cycle bottom. Yes, it could happen. Definitely. The one thing I've

牛魔王 @Btcniumowang · 2026-07-02T13:15:00+00:00

Binance US stocks launched 30 days ago, with managed assets breaking $1 billion, cumulative trading volume hitting $3 billion—impressive numbers, but what really catches my eye is that users under 25 make up a quarter of the total. 73% of users come from emerging markets. What

A stacked bar chart comparing the Global Stock User Base (Asia Pacific: 464M, North America: 168M, Rest of World: 70M, EU: 32M, Latin America: 6M) and Global Crypto User Base (Binance: 320M, Others: 400M) measured in millions.

AI visual analysis: A stacked bar chart comparing the Global Stock User Base (Asia Pacific: 464M, North America: 168M, Rest of World: 70M, EU: 32M, Latin America: 6M) and Global Crypto User Base (Binance: 320M, Others: 400M) measured in millions.

CoinMarketCap @CoinMarketCap · 2026-07-02T08:49:05+00:00

LATEST: Citi cut its 12-month Bitcoin target to $82,000 from $112,000 and its Ethereum target to $2,240 from $3,175, citing collapsing ETF demand and stalled US crypto legislation.

A gold Bitcoin coin and an Ethereum coin sit amid scattered coins on a reflective surface, set against a backdrop of plunging red candlestick charts that visually reinforce Citi's sharply lowered 12-month price targets of $82,000 for Bitcoin and $2,240 for Ethereum.

AI visual analysis: A gold Bitcoin coin and an Ethereum coin sit amid scattered coins on a reflective surface, set against a backdrop of plunging red candlestick charts that visually reinforce Citi's sharply lowered 12-month price targets of $82,000 for Bitcoin and $2,240 for Ethereum.

Ivan on Tech @IvanOnTech · 2026-07-02T11:46:19+00:00

BITCOIN: THE BEGINNING OF THE END!!!!

symbiote @cryptosymbiiote · 2026-07-02T16:42:40+00:00

$BTC Forming regular bullish divergence here Might be a reason to take that liquidity above 66-68K and then dump to final bottom We'll see how it plays out

The image shows a Bitcoin (₿) logo on an orange gradient background, symbolizing $BTC, the cryptocurrency referenced in the post discussing bullish divergence and potential price movements around 66-68K.

AI visual analysis: The image shows a Bitcoin (₿) logo on an orange gradient background, symbolizing $BTC, the cryptocurrency referenced in the post discussing bullish divergence and potential price movements around 66-68K.

Rekt Capital @rektcapital · 2026-07-02T22:05:16+00:00

$USDC Dominance is dipping right on schedule Meanwhile Bitcoin's price enjoys upside in this relatively short-term macro risk-on climate However, BTC's relief rally would probably end once USDC Dominance successfully retests the red Macro Downtrend as new support #BTC $BTC

A TradingView chart from @rektcapital shows USDC Dominance (CRYPTOCAP) on a monthly timeframe dipping toward a red macro downtrend and the 3.371%–2.900% horizontal support zone, illustrating the post's view that USDC.D is retracing on schedule while BTC enjoys a short-term relief rally that would likely end once USDC Dominance flips the downtrend into support.

AI visual analysis: A TradingView chart from @rektcapital shows USDC Dominance (CRYPTOCAP) on a monthly timeframe dipping toward a red macro downtrend and the 3.371%–2.900% horizontal support zone, illustrating the post's view that USDC.D is retracing on schedule while BTC enjoys a short-term relief rally that would likely end once USDC Dominance flips the downtrend into support.

The ₿itcoin Therapist @TheBTCTherapist · 2026-07-02T19:48:59+00:00

They’re going to send bitcoin to $10 million a coin and there’s nothing you can do to stop it. Don’t fight the future. Front run it.

Wimar.X @DefiWimar · 2026-07-02T11:25:59+00:00

BREAKING BLACKROCK JUST STARTED AGGRESSIVELY DUMPING $BTC RIGHT BEFORE THE U.S. MARKET OPEN! IN JUST 10 MINUTES, IT DUMPED $300,000,000 WORTH OF BITCOIN AND IS SELLING EVEN MORE RIGHT NOW! THIS IS EXTREMELY BAD FOR MARKETS...

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T07:05:12+00:00

BREAKING: JAPAN'S METAPLANET JUST ANNOUNCED THAT THEY BOUGHT 2,823 #BITCOIN WORTH $170,000,000 ASIA IS BUYING BTC AGGRESSIVELY RIP BEARS

An orange square featuring the white Bitcoin logo.

AI visual analysis: An orange square featuring the white Bitcoin logo.

Aralez @0xAralez · 2026-07-02T23:35:22+00:00

JUST MARK MY WORDS: $BTC is very likely to fill $68K FVG That will likely mark final stop before real dump begins My plan is simple: 1. Rally to $69K 2. 10-14 days of sideways 3. Then breakdown below $58K 4. Flush to $48K 5. Final bottom test in $40k-$44K zone Retail

Simply Bitcoin @SimplyBitcoin · 2026-07-02T20:41:52+00:00

Bitcoin OG @ToneVays gives his full unfiltered take on the BIP-110 controversy: "People have been convinced that just because you're able to spin up a node, that somehow you should be in control of the Bitcoin network, and that's a very dangerous precedent."

symbiote @cryptosymbiiote · 2026-07-02T12:22:53+00:00

We have just closed $BTC monthly below 50-month MA, which usually means a move lower Wondering if we hold to it right now

Vision Wallet @VisionWallet · 2026-07-02T15:12:59+00:00

Satoshi's untouched wallets hold an estimated $60B+ worth of BTC. Any onchain movement from these genesis-era addresses would absolutely send shockwaves through global financial markets.

A Polymarket prediction market screenshot asks "Will Satoshi Move Any Bitcoin in 2026?" showing only a 7% chance (up 2% in 24H) with YES 6.8% vs NO 93.3%, alongside a bronze Satoshi statue image—visually reinforcing how unlikely it is that Satoshi's estimated $60B+ in untouched BTC will ever move onchain.

AI visual analysis: A Polymarket prediction market screenshot asks "Will Satoshi Move Any Bitcoin in 2026?" showing only a 7% chance (up 2% in 24H) with YES 6.8% vs NO 93.3%, alongside a bronze Satoshi statue image—visually reinforcing how unlikely it is that Satoshi's estimated $60B+ in untouched BTC will ever move onchain.

無名先生 @Wuming_Mr_ · 2026-07-02T10:51:14+00:00

I said it before, and it’s definitely going to happen this way. Bitcoin just broke below the 14-year support line— Mt. Gox, COVID, FTX—all failed to breach it. It held every single time. This time, it broke. The capitulation sell-off is here. I’ve nailed every top and bottom

Coin Bureau @coinbureau · 2026-07-02T15:20:00+00:00

CANTOR: BITCOIN BEAR CYCLE MAY BOTTOM AROUND OCTOBER Cantor Fitzgerald says Bitcoin may be in the late stages of its current bear cycle. $BTC is now 252 days past its 2025 peak and down about 51%. In the last 3 cycles, Bitcoin bottomed an average of 384 days after peaking,

A close-up of gold Bitcoin coins visually represents the digital asset discussed in the accompanying post. The image displays several physical Bitcoin tokens, reinforcing the topic of Cantor Fitzgerald's analysis on a potential Bitcoin bear cycle bottom around October.

AI visual analysis: A close-up of gold Bitcoin coins visually represents the digital asset discussed in the accompanying post. The image displays several physical Bitcoin tokens, reinforcing the topic of Cantor Fitzgerald's analysis on a potential Bitcoin bear cycle bottom around October.

Wick @ZeroHedge_ · 2026-07-02T01:20:19+00:00

$BTC Funny how everyone thinks this is the bottom. Even though they see everyone else also calling a bottom lol Wishful thinking.

Robert ₿reedlove @Breedlove22 · 2026-07-02T18:04:38+00:00

Every paper currency in history has eventually collapsed toward zero, and the dollar is running the same script. I broke this down with Anthony Pompliano back in 2020, and here are 8 truths about money that are hard to unsee (THREAD): 1. Fiat currency is a pyramid scheme:

Rekt Capital @rektcapital · 2026-07-02T12:18:20+00:00

The Bitcoin Summer Game Plan - Macro Triangles If you enjoyed this 1-minute summary on #BTC Checkout the full video here: youtu.be/tpTMTHU1qO0?si … Enjoy and Subscribe! $BTC #Bitcoin

Whale Alert @whale_alert · 2026-07-02T18:38:47+00:00

1,631 $BTC (100,776,299 USD) transferred from unknown wallet to Coinbase Institutional whale-alert.io/tx/bitcoin/4d9 …

Chento @ChentoTrades · 2026-07-02T08:35:09+00:00

Getting bored of the PA, to be honest, patience is key and the right play, Position remains unchanged $btc

Binance BTCUSDT Perpetual futures trading screen showing a Long position with +43.45% PnL (+$617,482.95) and a Short position with +177.13% PnL (+$3,524,797.08), with 12X leverage and a Mark Price of 60,406.0.

AI visual analysis: Binance BTCUSDT Perpetual futures trading screen showing a Long position with +43.45% PnL (+$617,482.95) and a Short position with +177.13% PnL (+$3,524,797.08), with 12X leverage and a Mark Price of 60,406.0.

XO @Trader_XO · 2026-07-02T12:25:40+00:00

$BTC The game plan hasn't changed since February's range was established. Sell the upper extremes. Buy the lower extremes has been the clear plan for me as mentioned on here and various streams earlier this year. Until the market finds acceptance outside of that range, I'll

A screenshot of a tweet by Trader XO (@Trader_XO) posted on March 5 with 18K views and 138 likes. The tweet reads "TLDR: Mark out Feb high and Feb lows. Watch the flow around the extremes of those two levels for an execution trigger." This summarizes the accompanying post's $BTC game plan of selling upper extremes and buying lower extremes within February's established range.

AI visual analysis: A screenshot of a tweet by Trader XO (@Trader_XO) posted on March 5 with 18K views and 138 likes. The tweet reads "TLDR: Mark out Feb high and Feb lows. Watch the flow around the extremes of those two levels for an execution trigger." This summarizes the accompanying post's $BTC game plan of selling upper extremes and buying lower extremes within February's established range.

SantinoCripto® @SantinoCripto · 2026-07-02T20:34:23+00:00

SMART MONEY ALREADY KNOWS EXACTLY WHERE THE TARGET IS. At 62K$-64K$ there’s just 310M$ in liquidations. But between 56K$-59K$ a whopping 1.44 TRILLION dollars in liquidity piles up. A BRUTAL difference. The market tends to head where there are more positions to liquidate.

Crypto Lens @crypto_lens_ · 2026-07-02T05:53:19+00:00

Bitcoin will hit another rejection at the ~$63K level. We’re now entering the FINAL bull trap before $BTC drops to $52,000. $60K → $63K → $52K → $48K → $43K → $38K Next stops: → $52K-$48k next week → $43K-$38k by August I publicly called Bitcoin's $16K bottom in 2022.

Rajat Soni, CFA @Rajatsoni · 2026-07-02T04:29:08+00:00

I'm selling all my Bitcoin I just discovered that it doesn't offer cash flow I'd rather own a rental property and earn 80% less total return while doing 1,000x more work

Kalshi @Kalshi · 2026-07-02T18:06:38+00:00

JUST IN: JPMorgan says Michael Saylor's "Strategy" is creating new risk for Bitcoin

cryptocapo @CryptocapoOO · 2026-07-02T16:25:05+00:00

BEARS HAVE JUST BEEN COMPLETELY LIQUIDATED. WHALES SWEPT UP A MASSIVE AMOUNT OF ORDERS BETWEEN $60,100 AND $62,000 IN THE LAST $BTC SURGE. NOW, BETWEEN $62,000 AND $64,000, LIQUIDITY IS MUCH THINNER, WHICH COULD ALLOW FOR AN EXPLOSIVE MOVE IF THE PRICE KEEPS RISING.

Altcoin Daily @AltcoinDaily · 2026-07-02T18:13:27+00:00

Bitcoin hit $62,000 today.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T20:00:00+00:00

There are two strong indications that a market is getting hotter for #Crypto. 1 - The main drivers of the infrastructures are outperforming #Bitcoin. --> This means that Ethereum needs to outperform vs. BTC, and this can also be that Solana is outperforming BTC. Both of them

A TradingView chart displays Cronos (CRO) price analysis with technical annotations including 'Break back below 21 MA' and 'Higher timeframe support area'.

AI visual analysis: A TradingView chart displays Cronos (CRO) price analysis with technical annotations including 'Break back below 21 MA' and 'Higher timeframe support area'.

Simply Bitcoin @SimplyBitcoin · 2026-07-02T00:02:15+00:00

The mission of Bitcoin is the separation of money and state.

Two people sit atop a tall tower or antenna holding an orange Bitcoin flag, with high-rise buildings visible in the background.

AI visual analysis: Two people sit atop a tall tower or antenna holding an orange Bitcoin flag, with high-rise buildings visible in the background.

CryptoTelugu @CryptoTeluguO · 2026-07-02T03:16:25+00:00

Simple guide on @arcus_xyz waitlist New DEX by @dydxfoundation On @RobinhoodCrypto Chain RobinHood chain went live few hrs ago @arcus_xyz is major DEX on Robinhood Chain, built for 24/7 trading of 95 Stock Tokens, Equity Perpetuals, and major crypto So potential

The image shows a promotional graphic for Arcus, labeled "Live in Beta," alongside four Scrabble-style tiles displaying the Bitcoin (₿), Apple (🍎), Tesla, and X (formerly Twitter) logos, representing the stock and crypto tokens available for trading on the platform.

AI visual analysis: The image shows a promotional graphic for Arcus, labeled "Live in Beta," alongside four Scrabble-style tiles displaying the Bitcoin (₿), Apple (🍎), Tesla, and X (formerly Twitter) logos, representing the stock and crypto tokens available for trading on the platform.

UNKNOWN TRADER @Learnernoearner · 2026-07-02T14:47:50+00:00

$BTC going as planned

A TradingView BTC/USD chart shows the price rejecting from the 62,090–62,216 resistance zone, with a projected downside move toward the 59,525–59,790 support area, reflecting a -1.16% drop of -723.1 points over 6 hours, aligning with the "$BTC going as planned" forecast.

AI visual analysis: A TradingView BTC/USD chart shows the price rejecting from the 62,090–62,216 resistance zone, with a projected downside move toward the 59,525–59,790 support area, reflecting a -1.16% drop of -723.1 points over 6 hours, aligning with the "$BTC going as planned" forecast.

Whale Alert @whale_alert · 2026-07-02T07:55:52+00:00

2,194 $BTC (131,903,189 USD) transferred from unknown wallet to unknown wallet whale-alert.io/tx/bitcoin/8d0 …

Heisenberg @Mr_Derivatives · 2026-07-02T16:50:20+00:00

$BTC simply refuses to give up $60k time and time again. That RSI divergence could be key for you bulls…

A financial chart comparing Bitcoin's price (bottom) with its RSI (top) from 2024-2026, highlighting bullish divergences in orange and "no divergence" zones in blue, showing multiple instances where Bitcoin has repeatedly tested the $60k level (most recently at 67,254) with corresponding RSI divergence patterns supporting potential bullish reversals.

AI visual analysis: A financial chart comparing Bitcoin's price (bottom) with its RSI (top) from 2024-2026, highlighting bullish divergences in orange and "no divergence" zones in blue, showing multiple instances where Bitcoin has repeatedly tested the $60k level (most recently at 67,254) with corresponding RSI divergence patterns supporting potential bullish reversals.

Mr.₿itcoin @coinspace_ · 2026-07-02T09:05:00+00:00

【Breaking News】 Long-term holders' #Bitcoin holdings hit a new all-time high The OGs are sticking to their buy & hold strategy. Did any of you hardcore folks buy the dip this time around?

A Bitcoin Magazine Pro chart titled "Bitcoin: Long Term Holder Supply" shows long-term holder supply (light blue) reaching approximately 16M BTC alongside BTC price (black line) nearing $100k USD, with a red arrow highlighting the all-time high in long-term holder accumulation—visually reinforcing the post's claim that OGs are doubling down on their buy-and-hold strategy.

AI visual analysis: A Bitcoin Magazine Pro chart titled "Bitcoin: Long Term Holder Supply" shows long-term holder supply (light blue) reaching approximately 16M BTC alongside BTC price (black line) nearing $100k USD, with a red arrow highlighting the all-time high in long-term holder accumulation—visually reinforcing the post's claim that OGs are doubling down on their buy-and-hold strategy.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T17:17:37+00:00

The stock markets erased more than $1 trillion in value over the course of the past few hours. A big market drop. What didn't drop? #Bitcoin and #Altcoins. Times are changing, finally.

Whale Alert @whale_alert · 2026-07-02T21:06:03+00:00

2,248 $BTC (138,441,483 USD) transferred from #OKEX to unknown wallet whale-alert.io/tx/bitcoin/c37 …

Whale Alert @whale_alert · 2026-07-02T14:55:38+00:00

1,482 $BTC (91,259,259 USD) transferred from Coinbase Institutional to unknown new wallet whale-alert.io/tx/bitcoin/b69 …

Unipcs (aka 'Bonk Guy') @theunipcs · 2026-07-02T16:02:56+00:00

yeh i picked $USELESS over $SOL it is up ~7% vs SOL today it is also currently in a parabolic uptrend vs: - $BTC - $DOGE - $SHIB - $PEPE - $PENGU - and many other established memecoins... it is also one of the few established memecoins unfazed by the $ANSEM

Cryptocurrency table showing 'USELESS STRENGTH' rankings with USELESSUSDT pairs against TROL, SHIB, BONK, BNBu, BTCU, PENG, DOGE, SOLU, and PEPE, along with prices and percentage changes.

AI visual analysis: Cryptocurrency table showing 'USELESS STRENGTH' rankings with USELESSUSDT pairs against TROL, SHIB, BONK, BNBu, BTCU, PENG, DOGE, SOLU, and PEPE, along with prices and percentage changes.

CoinDesk @CoinDesk · 2026-07-02T10:38:57+00:00

LATEST: @Metaplanet acquires 2,823 $BTC in Q2, bringing total holdings to 43,000 $BTC , with a Bitcoin yield of 6.6% for the quarter, funded primarily through debt rather than equity issuance.

The image shows the MetaPlanet logo, featuring a stylized "M" with a geometric halftone pattern in yellow and black, with the text "METAPLANET" beneath it, representing the company that has acquired 2,823 additional BTC, bringing its total holdings to 43,000 BTC.

AI visual analysis: The image shows the MetaPlanet logo, featuring a stylized "M" with a geometric halftone pattern in yellow and black, with the text "METAPLANET" beneath it, representing the company that has acquired 2,823 additional BTC, bringing its total holdings to 43,000 BTC.

Phyrex @PhyrexNi · 2026-07-02T17:00:14+00:00

A buddy asked why the US stock market has been dropping lately. These two sets of data here could be seen as forward-looking—the institutions and hedge funds started running a week in advance. I've had it pinned for three or five days now. But Bitcoin has actually been holding

The image is a Chinese-language financial chart titled "一组更极端的数据:美国科技股正在被机构减仓" (A Set of More Extreme Data: US Tech Stocks Are Being Reduced by Institutions), displaying Goldman's Prime Book data showing US Info Tech net buying z-scores reaching -4 standard deviations by June 25, with key statistics including $20 billion in tech outflows week-to-date and a 14.5% drop in tech hedge fund long positions. The caption and accompanying post highlight this as a leading indicator explaining the recent US tech stock decline, with institutions and hedge funds exiting positions a week before the market drop, while noting Bitcoin's relative strength during this period.

AI visual analysis: The image is a Chinese-language financial chart titled "一组更极端的数据:美国科技股正在被机构减仓" (A Set of More Extreme Data: US Tech Stocks Are Being Reduced by Institutions), displaying Goldman's Prime Book data showing US Info Tech net buying z-scores reaching -4 standard deviations by June 25, with key statistics including $20 billion in tech outflows week-to-date and a 14.5% drop in tech hedge fund long positions. The caption and accompanying post highlight this as a leading indicator explaining the recent US tech stock decline, with institutions and hedge funds exiting positions a week before the market drop, while noting Bitcoin's relative strength during this period.

Ted @TedPillows · 2026-07-02T11:28:07+00:00

$BTC is now above $61,000. US stock futures are down today along with DXY. Pre-market stock trading insights: Nasdaq futures is down 0.36% S&P futures is down 0.04%

A financial dashboard displays 8 market symbols showing DXY at 101.031 (-0.38%), NASDAQ 100 E-mini Futures at 29,986.50 (-0.36%), S&P 500 at 7,483.22 (-0.22%), S&P 500 E-mini Futures at 7,540.25 (-0.04%), Gold CFDs at 4,062.897 (+0.79%), Silver CFDs at 59.8412 (+1.30%), BTCUSD at 61,209 (+2.08%), and Strategy Inc at 87.46 (+3.06%), visually confirming Bitcoin's rise above $61,000 while US stock futures (Nasdaq -0.36%, S&P -0.04%) and the Dollar Index trade lower.

AI visual analysis: A financial dashboard displays 8 market symbols showing DXY at 101.031 (-0.38%), NASDAQ 100 E-mini Futures at 29,986.50 (-0.36%), S&P 500 at 7,483.22 (-0.22%), S&P 500 E-mini Futures at 7,540.25 (-0.04%), Gold CFDs at 4,062.897 (+0.79%), Silver CFDs at 59.8412 (+1.30%), BTCUSD at 61,209 (+2.08%), and Strategy Inc at 87.46 (+3.06%), visually confirming Bitcoin's rise above $61,000 while US stock futures (Nasdaq -0.36%, S&P -0.04%) and the Dollar Index trade lower.

CoinMarketCap @CoinMarketCap · 2026-07-02T00:10:13+00:00

LATEST: Standard Chartered says it executed its first live digital asset prime brokerage trades, covering spot Bitcoin and Ether with T+1 settlement through LMAX Group.

The image shows the exterior signage of a Standard Chartered bank branch, featuring the company's distinctive blue and green logo alongside its name. This relates to the announcement that Standard Chartered has executed its first live digital asset prime brokerage trades in spot Bitcoin and Ether via LMAX Group, marking a milestone in the bank's crypto services.

AI visual analysis: The image shows the exterior signage of a Standard Chartered bank branch, featuring the company's distinctive blue and green logo alongside its name. This relates to the announcement that Standard Chartered has executed its first live digital asset prime brokerage trades in spot Bitcoin and Ether via LMAX Group, marking a milestone in the bank's crypto services.

Michaël van de Poppe @CryptoMichNL · 2026-07-02T11:15:00+00:00

In terms of next steps for $BTC , I'd like to see: - A clear breakthrough above $61,000, as that would flash and confirm that the bullish divergence becomes valid. - A clear breakthrough above $64,000 would indicate that we're going to see more momentum towards the top of the

A TradingView candlestick chart of Bitcoin ($BTC) showing price action declining from ~$86,000 down to the $54,000-$56,000 range, with annotations highlighting a "Lower timeframe need to retest this" near $56,000 alongside a visible bullish divergence pattern on the RSI at the bottom of the chart, supporting the post's commentary on needing a breakout above $61,000 and $64,000 to confirm bullish momentum.

AI visual analysis: A TradingView candlestick chart of Bitcoin ($BTC) showing price action declining from ~$86,000 down to the $54,000-$56,000 range, with annotations highlighting a "Lower timeframe need to retest this" near $56,000 alongside a visible bullish divergence pattern on the RSI at the bottom of the chart, supporting the post's commentary on needing a breakout above $61,000 and $64,000 to confirm bullish momentum.

Destiny @tofudestiny · 2026-07-02T14:34:23+00:00

Anyone else spend more time monitoring a BTC perpetual than they planned? I was adjusting leverage on @Alpix_io today and went through a couple of funding checks before deciding to leave the position running. What stood out was how simple it was to retrace everything through the

A cryptocurrency trading interface showing the ETH/USDC perpetual pair on a 1-hour chart, with ETH trading at $1,613.76 (+0.76%), alongside order book details showing bid/ask queues, recent trade history, and a calculated PnL of -3.14% on an unrealized position. The image supports the post's theme of monitoring perpetual futures trades by displaying the detailed market data, funding checks, and position management tools typical of leveraged crypto trading on platforms like Alpix.

AI visual analysis: A cryptocurrency trading interface showing the ETH/USDC perpetual pair on a 1-hour chart, with ETH trading at $1,613.76 (+0.76%), alongside order book details showing bid/ask queues, recent trade history, and a calculated PnL of -3.14% on an unrealized position. The image supports the post's theme of monitoring perpetual futures trades by displaying the detailed market data, funding checks, and position management tools typical of leveraged crypto trading on platforms like Alpix.

Crypto_Painter @CryptoPainter · 2026-07-02T11:34:19+00:00

BlackRock has transferred a cumulative 20,000 BTC in the last 4 days... But BTC's price is rebounding! This doesn't mean these BTC weren't sold—quite the opposite. While this traditional dollar capital is exiting, you'll see on-chain that the whales are going absolutely wild...

A news screenshot reports that a BlackRock ETF address deposited 4,917 BTC (worth ~$301 million) into Coinbase, with a cumulative 20,359 BTC (~$1.22 billion) deposited over 4 days, aligning with the post's mention of BlackRock moving 20,000 BTC recently and fueling speculation about large-scale selling pressure despite BTC's price rebound.

AI visual analysis: A news screenshot reports that a BlackRock ETF address deposited 4,917 BTC (worth ~$301 million) into Coinbase, with a cumulative 20,359 BTC (~$1.22 billion) deposited over 4 days, aligning with the post's mention of BlackRock moving 20,000 BTC recently and fueling speculation about large-scale selling pressure despite BTC's price rebound.

Heisenberg @Mr_Derivatives · 2026-07-02T02:04:21+00:00

$HOOD continues to distance itself from $BTC in what was normally a fairly correlated relationship. And honestly, this is a good thing for Robinhood.

A financial chart comparing $HOOD (Robinhood Markets) in blue against $BTC (Bitcoin) in red over a several-month period, showing the two assets diverging significantly—with HOOD trending upward around $100 while BTC declines to approximately $78,000. The chart visually supports the post's claim that Robinhood is breaking away from its historical correlation with Bitcoin.

AI visual analysis: A financial chart comparing $HOOD (Robinhood Markets) in blue against $BTC (Bitcoin) in red over a several-month period, showing the two assets diverging significantly—with HOOD trending upward around $100 while BTC declines to approximately $78,000. The chart visually supports the post's claim that Robinhood is breaking away from its historical correlation with Bitcoin.

Whale Alert @whale_alert · 2026-07-02T17:35:46+00:00

1,000 $BTC (61,792,565 USD) transferred from unknown wallet to Coinbase Institutional whale-alert.io/tx/bitcoin/fb7 …

Whale Alert @whale_alert · 2026-07-02T17:55:08+00:00

814 $BTC (50,219,934 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/3dc …

MANDO CT @XMaximist · 2026-07-02T12:27:56+00:00

Tomorrow’s U.S. jobs report could be the catalyst markets have been waiting for. Softer labour data could strengthen the case for easier monetary policy. That means: Bitcoin Gold Dollar All eyes are on one number. Volatility is coming. The only question is whether

A "Markets on Alert" graphic featuring a Bitcoin coin and gold bars against a U.S. flag backdrop announces that "WARSH'S COMMENTS SET THE STAGE FOR U.S. JOBS DATA TO IGNITE BITCOIN & GOLD RALLY," with predicted outcomes of Bitcoin higher, Gold higher, and Dollar lower—visually reinforcing the post's warning about tomorrow's jobs report as a potential market catalyst.

AI visual analysis: A "Markets on Alert" graphic featuring a Bitcoin coin and gold bars against a U.S. flag backdrop announces that "WARSH'S COMMENTS SET THE STAGE FOR U.S. JOBS DATA TO IGNITE BITCOIN & GOLD RALLY," with predicted outcomes of Bitcoin higher, Gold higher, and Dollar lower—visually reinforcing the post's warning about tomorrow's jobs report as a potential market catalyst.

Vivek Sen @Vivek4real_ · 2026-07-02T07:06:41+00:00

BREAKING: METAPLANET JUST BOUGHT $170,000,000 WORTH OF BITCOIN VERY BULLISH FOR BITCOIN

Two men pose side by side in suits and orange "Bitcoin Pizza" hats in front of an ornate tiled wall, with the post celebrating Metaplanet's $170 million Bitcoin purchase, reflecting the upbeat, bullish sentiment surrounding major corporate accumulation of Bitcoin.

AI visual analysis: Two men pose side by side in suits and orange "Bitcoin Pizza" hats in front of an ornate tiled wall, with the post celebrating Metaplanet's $170 million Bitcoin purchase, reflecting the upbeat, bullish sentiment surrounding major corporate accumulation of Bitcoin.

Atrades @Atrades_02 · 2026-07-02T17:03:37+00:00

July 4th - july 7th You are not ready. $BTC

Rekt Fencer @rektfencer · 2026-07-02T18:06:51+00:00

BITCOIN RALLIES ALWAYS START LIKE THIS $BTC is already below the 200W MA. Nobody feels comfy buying here. That’s exactly why the best entries happen here. Hope you are ready for what's coming.

The image features the Bitcoin logo (₿) centered on an orange gradient background. It visually reinforces the post's message about Bitcoin's price action near the 200-week moving average, symbolizing $BTC as the focus of the anticipated rally.

AI visual analysis: The image features the Bitcoin logo (₿) centered on an orange gradient background. It visually reinforces the post's message about Bitcoin's price action near the 200-week moving average, symbolizing $BTC as the focus of the anticipated rally.

ᴀʟᴛꜱᴛʀᴇᴇᴛ ʙᴇᴛꜱ @AltstreetBet · 2026-07-02T15:16:31+00:00

Last November, when BTC showed similar divergence at 110k, nobody believed it will break down . $NVDA is showing similar behavior now . Green box is where price can range before large breakdown.

A monthly chart of NVIDIA Corporation ($NVDA) on NASDAQ showing the current price at $195.22, down 2.43%, with Elliott Wave counts (1-5) labeled and a green projection box around $240 marking a potential range before a larger breakdown, accompanied by RSI and MACD indicators showing bearish divergence with declining momentum. The chart illustrates the post's thesis of impending breakdown by highlighting weakening technical indicators despite elevated price levels.

AI visual analysis: A monthly chart of NVIDIA Corporation ($NVDA) on NASDAQ showing the current price at $195.22, down 2.43%, with Elliott Wave counts (1-5) labeled and a green projection box around $240 marking a potential range before a larger breakdown, accompanied by RSI and MACD indicators showing bearish divergence with declining momentum. The chart illustrates the post's thesis of impending breakdown by highlighting weakening technical indicators despite elevated price levels.

Rekt Capital @rektcapital · 2026-07-02T16:51:50+00:00

New YouTube video is live! Bitcoin Prediction Comes True - Four Year Cycle Prevails Check it out here: youtu.be/wkPWEBnCU30?si … Enjoy and Subscribe! $BTC #BTC #Bitcoin

DANNY @Danny_Crypton · 2026-07-02T10:22:04+00:00

THERE IS 0% CHANCE BITCOIN BOTTOMED ALREADY Everyone wants to believe the crash is over. But every Bitcoin bear market ended much lower. 2015: Bitcoin bottomed after -87% 2018: Bitcoin bottomed after -84% 2022: Bitcoin bottomed after -78% Now look at 2026. $BTC is still

The image shows the Bitcoin (₿) logo on an orange background. It visually represents $BTC, the cryptocurrency referenced in the post as potentially still being in a bear market cycle.

AI visual analysis: The image shows the Bitcoin (₿) logo on an orange background. It visually represents $BTC, the cryptocurrency referenced in the post as potentially still being in a bear market cycle.

Zer0 @degengambleh · 2026-07-02T22:58:57+00:00

Still expecting something like this on bitcoin.

This image is a TradingView daily chart of Bitcoin/USD (BTCUSDT) on Bitfinex, showing prices ranging from ~$32,000 to $100,000, with the current price at $61,552. The post "Still expecting something like this on Bitcoin" likely refers to the drawn-out price projection showing BTC consolidating in the $60,000–$66,000 range before breaking down toward a target zone around $44,000–$48,000, with invalidation above $74,315.

AI visual analysis: This image is a TradingView daily chart of Bitcoin/USD (BTCUSDT) on Bitfinex, showing prices ranging from ~$32,000 to $100,000, with the current price at $61,552. The post "Still expecting something like this on Bitcoin" likely refers to the drawn-out price projection showing BTC consolidating in the $60,000–$66,000 range before breaking down toward a target zone around $44,000–$48,000, with invalidation above $74,315.

Kaz @XBTkaz · 2026-07-02T23:09:46+00:00

$BTC Price is pumping towards our marked zones, We are getting the relief rally that we were expecting before the final push towards Low 50s, And looking at my timeline I see, everyone is calling for "Bottom Is In", Which I don't really think is the case and according to

The image shows a Bitcoin ($BTC) price chart highlighting a relief rally toward key resistance zones labeled "Extended Retest" (~64,750) and "HWN + First Target" (~62,400), following a sweep of the 58k liquidity, with the analyst projecting a "Massive bull trap" before price heads back down toward the Low 50s. This visual supports the post's bearish thesis that despite the current pump, the bottom is not in and a final flush to the low 50,000s is expected.

AI visual analysis: The image shows a Bitcoin ($BTC) price chart highlighting a relief rally toward key resistance zones labeled "Extended Retest" (~64,750) and "HWN + First Target" (~62,400), following a sweep of the 58k liquidity, with the analyst projecting a "Massive bull trap" before price heads back down toward the Low 50s. This visual supports the post's bearish thesis that despite the current pump, the bottom is not in and a final flush to the low 50,000s is expected.

Whale Alert @whale_alert · 2026-07-02T11:51:17+00:00

859 $BTC (52,633,581 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/508 …

Whale Alert @whale_alert · 2026-07-02T11:36:58+00:00

859 $BTC (52,632,826 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/6d2 …

cryptocapo @CryptocapoOO · 2026-07-02T18:04:22+00:00

MICHAEL SAYLOR JUST DROPPED ONE OF THE WILDEST PREDICTIONS ABOUT #BITCOIN. IF MICROSTRATEGY ENDS UP ACCUMULATING 5% OF ALL $BTC, HE BELIEVES THE PRICE COULD SKYROCKET TO $1,000,000. AND IF IT REACHES 7%... THE MODEL POINTS TO $10,000,000 PER BITCOIN. IF THIS ENDS UP

Le ₿unker @LeBunkerBtc · 2026-07-02T02:34:57+00:00

Banks will soon do the same for cash. They will cite the excessively high maintenance costs, the danger of hold-ups, and the health risks. It works out perfectly, as the central bank has planned for this with the Digital Euro.

The image shows a retail video game store aisle displaying rows of PS4 and PlayStation titles on shelves, with green "Ocasión" (secondhand) display stands in the foreground and an "Earthbreakers" PSVR game prominently featured on the wall. The connection to the post is ironic or cautionary—physical media like video games serves as a visible example of how businesses phase out tangible products (from cartridges to discs to digital downloads), paralleling the article's argument that banks may similarly eliminate physical cash in favor of centralized digital currency.

AI visual analysis: The image shows a retail video game store aisle displaying rows of PS4 and PlayStation titles on shelves, with green "Ocasión" (secondhand) display stands in the foreground and an "Earthbreakers" PSVR game prominently featured on the wall. The connection to the post is ironic or cautionary—physical media like video games serves as a visible example of how businesses phase out tangible products (from cartridges to discs to digital downloads), paralleling the article's argument that banks may similarly eliminate physical cash in favor of centralized digital currency.

Rekt Capital @rektcapital · 2026-07-02T12:13:36+00:00

#BTC Welcome to green July $BTC #Bitcoin

A Bitcoin/USD monthly candlestick chart from TradingView (by @rektcapital) shows BTC trading at $61,244, with a TEMA indicator and an orange circle highlighting a historical bottom near $17,000 in mid-2022, supporting the post's bullish #BTC narrative for "green July."

AI visual analysis: A Bitcoin/USD monthly candlestick chart from TradingView (by @rektcapital) shows BTC trading at $61,244, with a TEMA indicator and an orange circle highlighting a historical bottom near $17,000 in mid-2022, supporting the post's bullish #BTC narrative for "green July."

The Wolf Of All Streets @scottmelker · 2026-07-02T15:00:00+00:00

CANTOR SAYS $BTC BEAR MARKET MAY BE IN ITS FINAL STRETCH

Zeyna @zeynepdenbiri · 2026-07-02T15:55:17+00:00

EVERYTHING TURNED GREEN, THE BULL ARRIVED! IT NEEDS SOME UPTICKS TO FALL EVEN MORE! Reiterating; I won't look at the spot market unless $Bitcoin drops to at least $38,000.

CoinMarketCap @CoinMarketCap · 2026-07-02T11:49:10+00:00

LATEST: Cantor Fitzgerald says Bitcoin’s bear market may be entering its final stretch, with historical patterns pointing to a potential bottom around late October.

The image shows the Cantor Fitzgerald logo in white text on a blue background, representing the financial services firm referenced in the post about their Bitcoin bear market analysis.

AI visual analysis: The image shows the Cantor Fitzgerald logo in white text on a blue background, representing the financial services firm referenced in the post about their Bitcoin bear market analysis.

silvan @silvanrec · 2026-07-02T18:03:41+00:00

This guy used Claude Fable 5 to enhance the Quant Bot that generated +$288,872 on Polymarket Since April 30, this wallet has been averaging about $6,878 in profits per day while executing around 30 trades per hour in short-term Bitcoin "Up / Down" markets 30,670 predictions

GoMining @GoMining · 2026-07-02T13:25:42+00:00

Six tabs open. Two wallets. A bridge you're not sure you trust. And a wallet address you've now copy-pasted three times because getting one character wrong means your money is gone. That's how you swap USDT to BTC today. Or you do it in one tap, in one app Which one have

DustyBC Crypto @DustyBC · 2026-07-02T08:00:01+00:00

𝗝𝗨𝗦𝗧 𝗜𝗡: Metaplanet announced it has bought 2,823 $BTC . The company now holds a total of 43,000 $BTC .

A Metaplanet Inc. (ticker implicit via company) social media post announcing the acquisition of 2,823 BTC, bringing total holdings to 43,000 BTC with a year-to-date BTC yield of 9.59%, accompanied by a graphic of a stylized black and gold "Bitcoin" ball featuring the Metaplanet logo. The image visually reinforces the post's headline news about Metaplanet's expanded Bitcoin treasury.

AI visual analysis: A Metaplanet Inc. (ticker implicit via company) social media post announcing the acquisition of 2,823 BTC, bringing total holdings to 43,000 BTC with a year-to-date BTC yield of 9.59%, accompanied by a graphic of a stylized black and gold "Bitcoin" ball featuring the Metaplanet logo. The image visually reinforces the post's headline news about Metaplanet's expanded Bitcoin treasury.

Blockchainedbb @blockchainedbb · 2026-07-02T14:56:19+00:00

$𝐁𝐓𝐂 𝟐𝟎𝟐𝟕-𝟐𝟖 𝐁𝐔𝐋𝐋 𝐌𝐀𝐑𝐊𝐄𝐓 𝐁𝐎𝐓𝐓𝐎𝐌? 𝐖𝐇𝐄𝐍 𝐓𝐎 𝐁𝐔𝐘 𝐂𝐑𝐘𝐏𝐓𝐎? 𝐖𝐇𝐄𝐑𝐄 𝐀𝐑𝐄 𝐖𝐄 𝐈𝐍 𝐓𝐇𝐈𝐒 𝐂𝐘𝐂𝐋𝐄? This is a question we are all trying to answer. Can an indicator predict the bottom or top? In reality, you need

CoinMarketCap @CoinMarketCap · 2026-07-02T15:17:30+00:00

HOT TOPIC: stocks are beating $BTC $MSTR , $MARA and $IBIT all outran the $BTC pump, and the money keeps rewarding the proxies over the coin itself. Did you know you can track all stocks right on CoinMarketCap? Just search the ticker like you would any

A CoinMarketCap post by solomonAJ highlights how stocks like MSTR (+5.04%), MARA, and IBIT have outperformed Bitcoin (+2.89%), with an attached chart showing MSTR's wave structure alongside BTC's price action. The post explains that MSTR benefits from amplified Bitcoin exposure, MARA profits from mining, and IBIT attracts institutional capital, reinforcing the theme that Bitcoin-linked equities are outpacing BTC itself.

AI visual analysis: A CoinMarketCap post by solomonAJ highlights how stocks like MSTR (+5.04%), MARA, and IBIT have outperformed Bitcoin (+2.89%), with an attached chart showing MSTR's wave structure alongside BTC's price action. The post explains that MSTR benefits from amplified Bitcoin exposure, MARA profits from mining, and IBIT attracts institutional capital, reinforcing the theme that Bitcoin-linked equities are outpacing BTC itself.

GoMining @GoMining · 2026-07-02T16:29:15+00:00

The whitepaper promised one thing: no institution in the middle. For seventeen years there was always someone in the middle: swiping a fee, logging a purchase, holding your money for three days. GoBTC Pay removes the middle. Not the idea of it. The actual middle. Blessed

The image features the opening line of Satoshi Nakamoto's Bitcoin whitepaper—"A purely peer-to-peer version of electronic cash would allow online payments to be sent directly from one party to another without going through a financial institution"—overlaid with handwritten-style text reading "You paid for a coffee today. Directly. On-chain. No institution touched it," above the "gobtc pay by gamining" logo, visually reinforcing the post's message that GoBTC Pay finally delivers the whitepaper's original promise of true peer-to-peer payments.

AI visual analysis: The image features the opening line of Satoshi Nakamoto's Bitcoin whitepaper—"A purely peer-to-peer version of electronic cash would allow online payments to be sent directly from one party to another without going through a financial institution"—overlaid with handwritten-style text reading "You paid for a coffee today. Directly. On-chain. No institution touched it," above the "gobtc pay by gamining" logo, visually reinforcing the post's message that GoBTC Pay finally delivers the whitepaper's original promise of true peer-to-peer payments.

Whale Factor @WhaleFactor · 2026-07-02T04:30:19+00:00

WHALE WATCH: $8.475B in net outflows from $BTC ETFs since May 6. => Is it panic ? No. => Its capitulation. Santiment data shows the weak hands are being shaken out. This isn’t a signal to run its a signal that the local bottom is getting closer. Watch the flows ignore the

A Santiment dashboard chart tracking Bitcoin ETF inflows/outflows since early May, showing $8.745B in net outflows and highlighting the October 6, 2025 record of +$1.25B in ETF inflows as a sell signal at ATH, visually reinforcing the post's claim of significant $BTC ETF capitulation.

AI visual analysis: A Santiment dashboard chart tracking Bitcoin ETF inflows/outflows since early May, showing $8.745B in net outflows and highlighting the October 6, 2025 record of +$1.25B in ETF inflows as a sell signal at ATH, visually reinforcing the post's claim of significant $BTC ETF capitulation.

Isabel Foxen Duke @isabelfoxenduke · 2026-07-02T17:33:10+00:00

"Bitcoin is something that millions of people trust and store their value in — it's their hard earned labor that they convert to Bitcoin," says @nic_carter "I find it so disrespectful when Bitcoin devs dismiss this and say 'I'm not concerned with price' — you should be, price [Spoken audio]: Every dev always intones this when you talk to them. Oh, yeah, look, I'm not concerned with short term price or like price at all, as if that is a morally good thing. It's like, no, you should be a little bit more commercially money. It's like a CEO of a publicly traded company being like, yeah, I don't care about the stock price of their shareholders interests. It's wild. You have to care. What do we think? Bitcoin is a not, Bitcoin is a financial protocol worth over, I think it's worth over trillion dollars right now. There's a trillion dollars at stake. It's like Tim Cook being like, yeah, I couldn't care less about the Apple shareholders. What? It's your job. So we can't pretend we're like we're in 2010 and this is purely an engineering project or an experiment or purely a payments protocol. It's certainly not. It's something that millions of people trust and store their value in. It's their hard earned labor that they convert into Bitcoin. That's how they store this. The stakes are enormously high here, and I find it just so disrespectful when Bitcoin devs dismiss this and say, oh, I'm not concerned with price. You should be. Price is actually the only thing that matters here.

TraderSZ @trader1sz · 2026-07-02T20:29:31+00:00

Moves in $BTC $SOL $DXY all mapped out before the moves happened.

BSC Gems Alert @BSCGemsAlert · 2026-07-02T06:56:37+00:00

BREAKING : PRESIDENT TRUMP “BITCOIN AND CRYPTO WILL SKYROCKET LIKE NEVER BEFORE, BEYOND YOUR EXPECTATIONS.” BULLISH

The image shows Donald Trump speaking, with a red arrow pointing to a Bitcoin coin. This visual connects Trump to the cryptocurrency, aligning with the post's claim of his prediction that Bitcoin and crypto will skyrocket.

AI visual analysis: The image shows Donald Trump speaking, with a red arrow pointing to a Bitcoin coin. This visual connects Trump to the cryptocurrency, aligning with the post's claim of his prediction that Bitcoin and crypto will skyrocket.

₿itcoin hodler @morrisoi37 · 2026-07-02T23:10:31+00:00

Not 40,000 sheets, but 2.47 million sheets, you bastards.

The image shows an SBS News article headline reading "27일 만에 잠실 개표소 진입…투표지 247만 장 확인" (translated: "Entered Jamsil polling station in 27 days... 2.47 million ballots confirmed"), with a byline from reporter Kim Kwan-jin. The article, dated July 2, 2026, relates to the post's sarcastic quote by highlighting the massive 2.47 million ballot count discovered at the Jamsil polling station, emphasizing the shocking scale of ballots being reviewed far beyond what the poster mockingly suggested as "40,000 sheets."

AI visual analysis: The image shows an SBS News article headline reading "27일 만에 잠실 개표소 진입…투표지 247만 장 확인" (translated: "Entered Jamsil polling station in 27 days... 2.47 million ballots confirmed"), with a byline from reporter Kim Kwan-jin. The article, dated July 2, 2026, relates to the post's sarcastic quote by highlighting the massive 2.47 million ballot count discovered at the Jamsil polling station, emphasizing the shocking scale of ballots being reviewed far beyond what the poster mockingly suggested as "40,000 sheets."

Crypto Michael @MichaelXBT · 2026-07-02T12:20:25+00:00

Bottom sellers are starting to get nervous. They will soon realise the severity of their mistake… The bounce will be glorious.

The Wolf Of All Streets @scottmelker · 2026-07-02T23:00:00+00:00

JAPAN'S 'SBI CRYPTO' TO END $BTC MINING OPERATIONS

DustyBC Crypto @DustyBC · 2026-07-02T13:44:17+00:00

𝗝𝗨𝗦𝗧 𝗜𝗡: Bitcoin breaks above $62,000

A Bitcoin/TetherUS (BTCUSDT) chart on Binance shows BTC at $62,014.89, up $1,990.89 (+3.32%) for the day, with the price line clearly breaking above the $62,000 level—visually confirming the post's headline that Bitcoin has just surged past $62,000.

AI visual analysis: A Bitcoin/TetherUS (BTCUSDT) chart on Binance shows BTC at $62,014.89, up $1,990.89 (+3.32%) for the day, with the price line clearly breaking above the $62,000 level—visually confirming the post's headline that Bitcoin has just surged past $62,000.

JrKripto @JrKripto · 2026-07-02T13:39:58+00:00

Bitcoin rose to $62,000, Ethereum rose to $1,700. Throughout history, we might never see Bitcoin below $60,000 or Ethereum below $1,500 again! We've stuffed our bags to the brim with goods. Let's hit the road, friends.

DustyBC Crypto @DustyBC · 2026-07-02T09:52:55+00:00

𝗝𝗨𝗦𝗧 𝗜𝗡: Bitcoin breaks above $61,000

A cryptocurrency price chart showing Bitcoin/TetherUS (BTCUSDT) trading at 61,060.60 USDT, up 1.73% on Binance, with a line graph depicting recent price movements.

AI visual analysis: A cryptocurrency price chart showing Bitcoin/TetherUS (BTCUSDT) trading at 61,060.60 USDT, up 1.73% on Binance, with a line graph depicting recent price movements.

Whale Alert @whale_alert · 2026-07-02T11:24:07+00:00

859 $BTC (52,657,786 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/a00 …

The ₿itcoin Therapist @TheBTCTherapist · 2026-07-02T17:56:39+00:00

Jeffrey Epstein’s banker — the same guy who called Bitcoin a pet rock and said it was a Ponzi scheme for a decade — wants to warn us that Michael Saylor buying 850,000 BTC is bad for us…

Dr. Robert King @kingbtc · 2026-07-02T22:19:53+00:00

we can go even bigger if we want

A woman in a tight red dress speaks passionately into a microphone at an outdoor rally, with banners reading "Playas" and "el Pueblo" visible behind her, embodying the post's bold call to "go even bigger."

AI visual analysis: A woman in a tight red dress speaks passionately into a microphone at an outdoor rally, with banners reading "Playas" and "el Pueblo" visible behind her, embodying the post's bold call to "go even bigger."

Paramatik @Coinmatik1 · 2026-07-02T18:30:27+00:00

#BITCOIN için 2022'ye benzer süreç mi geliyor?? Dostlar video olarak adım adım gösterdim hadi anlatayım! Öncelikle 2022 yılında #BTC düşen kama formasyonu oluşturdu o sırada RSI'da çöküş yaşıyordu ayrıca pozitif bir RSI Uyumsuzluğu oluşmustu, bunların sonucunda ise $16K

CoinMarketCap @CoinMarketCap · 2026-07-02T12:25:11+00:00

MICHAEL SAYLOR: Digital capital, digital credit, and digital money are Bitcoin's "holy trinity." Source: New Era Finance Podcast

A bearded man in a black suit and orange tie, identified as Michael Saylor, gestures while speaking at an event. The image accompanies his commentary on Bitcoin's "holy trinity" of digital capital, digital credit, and digital money from the New Era Finance Podcast.

AI visual analysis: A bearded man in a black suit and orange tie, identified as Michael Saylor, gestures while speaking at an event. The image accompanies his commentary on Bitcoin's "holy trinity" of digital capital, digital credit, and digital money from the New Era Finance Podcast.

HasanANKA @HasanANKA · 2026-07-02T16:37:48+00:00

Should we get the request analysis broadcast going? #Btc #Altcoin #xau

Samson Mow @Excellion · 2026-07-02T06:13:55+00:00

We’re very excited to collaborate with @ANAP_3189_T_EN , a TSE-listed top Bitcoin treasury company in Japan. They have an innovative Bitcoin Business Strategy that aligns perfectly with @ExordiumHQ ’s own mission and goals. Looking forward to sharing more news soon!

Pepesso @0xPepesso · 2026-07-02T14:48:44+00:00

THE $BTC BOTTOM IS NOT IN YET Every bear cycle has been shallower than the last: 2015: -87% | bottom at $152 2018: -84% | bottom at $3,100 2022: -77% | bottom at $15,500 We're currently at -53% from the $126K ATH That's not a bottom Trend alone says -70% = $38K But this

WHALE @WhaleEverything · 2026-07-02T04:44:10+00:00

BREAKING : PRESIDENT TRUMP “BITCOIN AND CRYPTO WILL SKYROCKET LIKE NEVER BEFORE, BEYOND YOUR EXPECTATIONS.” BULLISH

President Trump speaks at a podium in front of a backdrop depicting the White House and the American flag, relating to his supposed "BREAKING" statement about Bitcoin and crypto. The text "THE SE" is faintly visible on the backdrop.

AI visual analysis: President Trump speaks at a podium in front of a backdrop depicting the White House and the American flag, relating to his supposed "BREAKING" statement about Bitcoin and crypto. The text "THE SE" is faintly visible on the backdrop.

UNKNOWN TRADER @Learnernoearner · 2026-07-02T04:31:23+00:00

$BTC LTF

A TradingView candlestick chart for Bitcoin ($BTC) on a lower timeframe (LTF) shows price action peaking around $62,216.4 before pulling back toward the $60,786 support level, with key resistance zones marked between $61,559-$62,216 and support at $59,790.

AI visual analysis: A TradingView candlestick chart for Bitcoin ($BTC) on a lower timeframe (LTF) shows price action peaking around $62,216.4 before pulling back toward the $60,786 support level, with key resistance zones marked between $61,559-$62,216 and support at $59,790.

Bitcoin.com News @BitcoinNews · 2026-07-02T11:30:50+00:00

The solo founder just got an edge. @OKX AI lets one person operate like a whole services team with a swarm of AI agents - they find the jobs, do them, get paid on delivery, and build reputation onchain. What used to need 12 people and 4 standups, now one degen and his or her

BSCN @BSCNews · 2026-07-02T12:47:00+00:00

BlackRock Deposits $301M In Bitcoin To Coinbase, Bringing Weekly Total To $1.23B @BlackRock continues its aggressive liquidity deployment, transferring an additional 4,917 $BTC worth $301M to @Coinbase Prime. This latest transaction elevates the firm’s total weekly deposits to

Don @DonWedge · 2026-07-02T17:22:28+00:00

I fkk with this trader we are on the same page because $BTC is breaking out

A TradingView candlestick chart of $BTC/USD displays a price breakout from a descending channel, with multiple trendlines (yellow, orange, purple, and white) highlighting consolidation patterns and key resistance levels around the $108K–$112K range. The annotated breakout structure visually supports the post's claim that Bitcoin is breaking out of its recent range.

AI visual analysis: A TradingView candlestick chart of $BTC/USD displays a price breakout from a descending channel, with multiple trendlines (yellow, orange, purple, and white) highlighting consolidation patterns and key resistance levels around the $108K–$112K range. The annotated breakout structure visually supports the post's claim that Bitcoin is breaking out of its recent range.

Aralez @0xAralez · 2026-07-02T16:47:44+00:00

DON'T FALL FOR THIS $BTC TRAP After printing a local low at $58K, market has entered a relief rally to rebalance price First target of this bounce is FVG around $67K-$69K, which is likely to be at least partially filled soon Many believe this is final reversal and that

The image features a Bitcoin (BTC) logo on an orange gradient background, visually reinforcing the post's warning about a potential BTC price trap following a relief rally from a $58K local low toward a Fair Value Gap target of $67K–$69K.

AI visual analysis: The image features a Bitcoin (BTC) logo on an orange gradient background, visually reinforcing the post's warning about a potential BTC price trap following a relief rally from a $58K local low toward a Fair Value Gap target of $67K–$69K.

CoinMarketCap @CoinMarketCap · 2026-07-02T11:13:10+00:00

LATEST: Standard Chartered has initiated coverage of Morpho with a $60 end-2030 price target, saying the DeFi lending token could outperform both Bitcoin and Ethereum.

The image displays the Morpho logo, featuring a stylized blue "M" icon alongside the company name in black text. This branding is referenced in the news that Standard Chartered has initiated coverage of Morpho with a $60 price target, highlighting institutional recognition of the DeFi lending protocol.

AI visual analysis: The image displays the Morpho logo, featuring a stylized blue "M" icon alongside the company name in black text. This branding is referenced in the news that Standard Chartered has initiated coverage of Morpho with a $60 price target, highlighting institutional recognition of the DeFi lending protocol.

₿IRB @crypto_birb · 2026-07-02T18:50:29+00:00

Sorry. Below $63k there's nothing remotely bullish about this chart. So no need to revise my $30,000 targets. The daily HTF Trailer 65.8k is the nearest resistance that must be reclaimed to begin leaning slightly bullish. Until then it's textbook bear market. P.S. See comment

A TradingView chart of Bitcoin/U.S. Dollar on Coinbase, annotated with bearish technical signals including a 27-month RSI low, a breakdown below the $110k bull support, an $80k (-37%) swing low, and a current oversold position near $63k, visually supporting the post's claim that no bullish reversal is evident until resistance near $65.8k is reclaimed.

AI visual analysis: A TradingView chart of Bitcoin/U.S. Dollar on Coinbase, annotated with bearish technical signals including a 27-month RSI low, a breakdown below the $110k bull support, an $80k (-37%) swing low, and a current oversold position near $63k, visually supporting the post's claim that no bullish reversal is evident until resistance near $65.8k is reclaimed.

比特进 @roger73005305 · 2026-07-02T14:02:58+00:00

Bitcoin hasn't effectively broken below the 58 level so far. If there's a big rebound and then it gets smashed down, it'll break right through, After this wave of rebound, we'll be able to see BTC starting with 4, The height of this rebound will determine the energy for

A mobile trading app screenshot showing futures contract prices including BTCUSDT at $61,941.2 (+5.00%) and ETHUSDT at $1,709.99 (+8.15%), with Nasdaq 100ETF down 0.12%, while the poster analyzes Bitcoin's price action near the $58K support level and anticipates a rebound that could propel BTC into the $64K range.

AI visual analysis: A mobile trading app screenshot showing futures contract prices including BTCUSDT at $61,941.2 (+5.00%) and ETHUSDT at $1,709.99 (+8.15%), with Nasdaq 100ETF down 0.12%, while the poster analyzes Bitcoin's price action near the $58K support level and anticipates a rebound that could propel BTC into the $64K range.

CoinMarketCap @CoinMarketCap · 2026-07-02T15:25:15+00:00

LATEST: Metaplanet bought 2,823 Bitcoin in Q2, bringing its total holdings to 43,000 BTC.

A bright orange background featuring the "METAPLANET" logo in bold black text.

AI visual analysis: A bright orange background featuring the "METAPLANET" logo in bold black text.

Cedric Youngelman @CedYoungelman · 2026-07-02T22:41:18+00:00

Matthew Kratter on why the spam war feels like a psyop: "A lot of these Core devs don't own much Bitcoin at all. They don't even run nodes. There's a misalignment of incentives. It's terrifying to see Bitcoin in the hands of devs who view it as just another software gig. You

@boytrickz @boytrickz · 2026-07-02T20:37:40+00:00

manifesting $100k this july.

Matthew Hyland @MatthewHyland_ · 2026-07-02T00:30:28+00:00

Agree likely in July/August for #BTC

Whale Factor @WhaleFactor · 2026-07-02T05:30:14+00:00

WHALE WATCH: Best for quick impact and high shareability. 100000 $BTC . Gone from ETFs. Thats not just a dip its a record breaking liquidation. The institutional narrative is hitting a massive stress test right now. Buckle up. This is getting interesting.

A CryptoQuant chart titled "Bitcoin ETF - Drawdown from ATH" tracks BTC ETF cumulative flows (gray line) alongside BTC price (black line) from April 2024 through April 2026, showing BTC reaching above $125K before falling to around $50K, with ETF drawdowns from ATH highlighted in pink shading—visually supporting the post's claim of approximately $100,000 in losses per Bitcoin from ETFs as the price retraces sharply from its all-time high.

AI visual analysis: A CryptoQuant chart titled "Bitcoin ETF - Drawdown from ATH" tracks BTC ETF cumulative flows (gray line) alongside BTC price (black line) from April 2024 through April 2026, showing BTC reaching above $125K before falling to around $50K, with ETF drawdowns from ATH highlighted in pink shading—visually supporting the post's claim of approximately $100,000 in losses per Bitcoin from ETFs as the price retraces sharply from its all-time high.

Daan Crypto Trades @DaanCrypto · 2026-07-02T19:21:54+00:00

$BTC Still trying to hold on to its range/february low. We have been seeing lower highs and lower lows so the trend is clearly down. That'd change on the low/mid timeframe if the bulls can push this above the June highs at $67K+. At that point things can get interesting. But

A Bitcoin (BTC/USD) daily candlestick chart from TradingView displays price action from December 2024 through July 2026, highlighting a "Range High" near $80,400 and a "Range Low" around $63,341 where BTC is currently trading at $63,021.03, with volume bars at the bottom and annotated emoji markers (😓, 💀, 💎) emphasizing the bearish trend of lower highs and lower lows that the accompanying post discusses.

AI visual analysis: A Bitcoin (BTC/USD) daily candlestick chart from TradingView displays price action from December 2024 through July 2026, highlighting a "Range High" near $80,400 and a "Range Low" around $63,341 where BTC is currently trading at $63,021.03, with volume bars at the bottom and annotated emoji markers (😓, 💀, 💎) emphasizing the bearish trend of lower highs and lower lows that the accompanying post discusses.

Dan Gambardello @dangambardello · 2026-07-02T14:47:19+00:00

Bitcoin whales just accumulated 270,000 BTC. The largest spike in whale accumulation we've ever seen. Bigger than COVID. Bigger than the FTX bottom. The question isn't whether that's bullish... The question is: What are they preparing for? Intro 00:00 Bitcoin whale

philarekt @philarekt · 2026-07-02T14:35:33+00:00

THE FINAL LIQUIDATION PHASE BEGINS NEXT WEEK BTC has historically bottomed around 427 days after each cycle's all-time high We're entering that window right now $60K → $34K-$48K → next bull run In 2022 I called the $17K bottom during this exact stage publicly, before it

DustyBC Crypto @DustyBC · 2026-07-02T05:20:05+00:00

𝗝𝗨𝗦𝗧 𝗜𝗡: Bitcoin spot ETFs recorded a net outflow of $296M on July 1. BlackRock clients sold $219,400,000 worth of $BTC

A data table titled "Bitcoin ETF Flow (US$m)" showing daily net flows across Bitcoin spot ETFs from 1 Jul–1 Jul 2026, with IBIT, FBTC, BITB, ARKB, BTCO, EZBC, BRRR, HODL, BTCM, MSBT, and GBTC columns, totaling a -$296.3M outflow (including IBIT's -$219.4M and FBTC's -$174.5M) on 1 Jul, with an overall -$26.7M net for the period—illustrating the $296M net outflow and BlackRock's $219.4M sell-off on July 1.

AI visual analysis: A data table titled "Bitcoin ETF Flow (US$m)" showing daily net flows across Bitcoin spot ETFs from 1 Jul–1 Jul 2026, with IBIT, FBTC, BITB, ARKB, BTCO, EZBC, BRRR, HODL, BTCM, MSBT, and GBTC columns, totaling a -$296.3M outflow (including IBIT's -$219.4M and FBTC's -$174.5M) on 1 Jul, with an overall -$26.7M net for the period—illustrating the $296M net outflow and BlackRock's $219.4M sell-off on July 1.

Yuyue @yuyue_chris · 2026-07-02T14:50:52+00:00

Save this trend, in the words of @fffffiyes_yu , what's the difference between the name hiding and the main downtrend wave of BTC To be honest, I bet on Hercules mainly because I was expecting the 7/10 ADR listing to drive another wave of storage sentiment, but now this trend has

A Chinese-language stock chart showing KOSPI at 7648.09 (-655.32, -7.89%) with daily K-line view, moving averages (MA5: 2539600, MA10: 2643300, MA20: 2440200, MA30: 2345544.71), and a peak around 2987000.

AI visual analysis: A Chinese-language stock chart showing KOSPI at 7648.09 (-655.32, -7.89%) with daily K-line view, moving averages (MA5: 2539600, MA10: 2643300, MA20: 2440200, MA30: 2345544.71), and a peak around 2987000.

Sykodelic @Sykodelic_ · 2026-07-02T10:21:39+00:00

Large entities are net long to a greater level than ever. On top of the large scale accumulation of 270,000 Bitcoin at the $59k level, Large entities(hedge funds etc) are net long Bitcoin to the highest level in history. Large entities have a solid history of timing key pivots,

A Bitcoin/USD chart on the 5-day timeframe (BTCUSD) shows price action from 2022 to 2026, currently around $61,082, with green arrows marking key historical accumulation zones at lower price levels (~$20k and $59k) that preceded major rallies, visually reinforcing the claim that large entities have strategically timed their long positions at critical market pivots.

AI visual analysis: A Bitcoin/USD chart on the 5-day timeframe (BTCUSD) shows price action from 2022 to 2026, currently around $61,082, with green arrows marking key historical accumulation zones at lower price levels (~$20k and $59k) that preceded major rallies, visually reinforcing the claim that large entities have strategically timed their long positions at critical market pivots.

The Bitcoin Historian @pete_rizzo_ · 2026-07-02T17:24:04+00:00

BREAKING: BLOOMBERG JUST REPORTED THE US SENATE IS EXPECTED TO RELEASE THE FINAL TEXT FOR THE #BITCOIN CLARITY ACT IN DAYS "THE TEXT WILL COME OUT OVER THE 4TH OF JULY WEEKEND" TOTAL REGULATORY CLARITY FOR CRYPTO IN AMERICA IT'S COMING

Bitcoin.com News @BitcoinNews · 2026-07-02T02:00:00+00:00

"Builders choose Base for more than infrastructure." @XenBH tells @2084Richardson high-performance rails matter—but so do dev support, docs, funding, users, liquidity, and Coinbase's distribution. See why founders are choosing Base x.com/BitcoinNews/st …

AuraX @AuraXOfficial1 · 2026-07-02T10:12:14+00:00

Play crypto. Get paid back. Instant rakeback starts from your first bet, with fast payouts every step of the way. start from here : minebit.com @MineBitHQ #Minebit #cryptogaming #bitcoin

Ran Neuner @cryptomanran · 2026-07-02T19:20:55+00:00

What if we get to next weekend and Saylor announces that they sold Bitcoin to buy STRC and STRC is still not back at $100?

Seth @seth_fin · 2026-07-02T15:29:05+00:00

Short term as BTC goes higher, it is leaving behind some 100x degen longs at 59K and 57.7K Will this be haunting us again soon?

MONK @defi_monk · 2026-07-02T16:48:15+00:00

Some heavy rotations happening in the stock market now. Cmon lads if we can spare some change and push BTC for a few weeks maybe they notice us down here.

Documenting Saylor @saylordocs · 2026-07-02T15:16:00+00:00

If Bitcoin follows Gold, BTC is going to $600,000 in 2026.

Bitcoin.com News @BitcoinNews · 2026-07-02T14:26:50+00:00

#Bitcoin briefly hits $62,000

A Bitcoin.com News graphic with a black background displays the text "BITCOIN TAPS $62K" in bold white and orange lettering, visually highlighting the moment Bitcoin briefly reached the $62,000 price level as mentioned in the accompanying post.

AI visual analysis: A Bitcoin.com News graphic with a black background displays the text "BITCOIN TAPS $62K" in bold white and orange lettering, visually highlighting the moment Bitcoin briefly reached the $62,000 price level as mentioned in the accompanying post.

The Wolf Of All Streets @scottmelker · 2026-07-02T16:00:02+00:00

BITWISE CIO MATT HOUGAN SAYS $BTC IS NEARING THE BOTTOM

Professional headshot portrait of a smiling man with short brown hair wearing a dark blue suit and white shirt against an olive background.

AI visual analysis: Professional headshot portrait of a smiling man with short brown hair wearing a dark blue suit and white shirt against an olive background.

Fred Krueger #BIP-110 @dotkrueger · 2026-07-02T10:08:54+00:00

The vast majority of Bitcoiners oppose expanding OP_RETURN space. It's insane that Core should be pushing such an unpopular direction.

Documenting Saylor @saylordocs · 2026-07-02T18:40:38+00:00

SOMEONE JUST OPENED $72,000 LONG ON BITCOIN HE KNOWS WHAT’S COMING

The image shows a Kalshi trading interface displaying a "BTC PERP" long position with 6x leverage, marked as "OPEN POSITION" with a current position value of $72,360.00, an entry price of $60,605.00, and an unrealized PNL of +7.80%. This visual supports the post's claim that someone has just opened a substantial $72,000 long position on Bitcoin, suggesting insider confidence in an upcoming price increase.

AI visual analysis: The image shows a Kalshi trading interface displaying a "BTC PERP" long position with 6x leverage, marked as "OPEN POSITION" with a current position value of $72,360.00, an entry price of $60,605.00, and an unrealized PNL of +7.80%. This visual supports the post's claim that someone has just opened a substantial $72,000 long position on Bitcoin, suggesting insider confidence in an upcoming price increase.

Seth @seth_fin · 2026-07-02T16:37:02+00:00

WHAT IF... #BTC WYCKOFF ACCUMULATION

A TradingView chart of Bitcoin (BTC/USD) annotated with the "Accumulation Schematic #1: Wyckoff Events and Phases," illustrating the classic Wyckoff accumulation pattern (Phases A–E with events like PS, AR, SC, ST, Spring, BU/LPS, and SOS) overlaid on Bitcoin's price action. The post's hypothetical question "WHAT IF... #BTC WYCKOFF ACCUMULATION" suggests Bitcoin may be following the Wyckoff accumulation schematic, implying a potential bullish breakout after the Spring phase.

AI visual analysis: A TradingView chart of Bitcoin (BTC/USD) annotated with the "Accumulation Schematic #1: Wyckoff Events and Phases," illustrating the classic Wyckoff accumulation pattern (Phases A–E with events like PS, AR, SC, ST, Spring, BU/LPS, and SOS) overlaid on Bitcoin's price action. The post's hypothetical question "WHAT IF... #BTC WYCKOFF ACCUMULATION" suggests Bitcoin may be following the Wyckoff accumulation schematic, implying a potential bullish breakout after the Spring phase.

Cozy ⓣhe Caller @cozypront · 2026-07-02T16:58:56+00:00

The last thing you see before #Bitcoin teleports to $70k+ Nasdaq down 2 Bitcoin up 3 Few understand how huge this is.

A trading screen displays the NDQ (US 100 Index/Nasdaq) at 29,200.48, down 2.04% (-608.66), while BTCUSDT (Bitcoin/TetherUS) shows $61,643.21, up 2.70% (+1,619.21). The image illustrates the post's point about Bitcoin surging while the Nasdaq drops—a rare divergence highlighting crypto's decoupling from traditional markets.

AI visual analysis: A trading screen displays the NDQ (US 100 Index/Nasdaq) at 29,200.48, down 2.04% (-608.66), while BTCUSDT (Bitcoin/TetherUS) shows $61,643.21, up 2.70% (+1,619.21). The image illustrates the post's point about Bitcoin surging while the Nasdaq drops—a rare divergence highlighting crypto's decoupling from traditional markets.

Celal Kucuker @CelalKucuker · 2026-07-02T18:15:56+00:00

My Short roadmap for Bitcoin $83K Breakdown below minor support Rejection around $70K–72K One final flush to $53K–55K Accumulation phase Then the real move begins $BTC ATH $144K Just my personal market outlook. Save this.

A daily Bitcoin/USD (Coinbase) chart by CryptoKrocker shows Bitcoin's price action breaking down from a parallel channel, with annotated short-term targets at $70,144.54 and $59,141.42, before projecting a major rally to a new all-time high of $144,319.82, aligning with the posted bearish-then-bullish roadmap to $53K–55K accumulation and a $144K ATH target.

AI visual analysis: A daily Bitcoin/USD (Coinbase) chart by CryptoKrocker shows Bitcoin's price action breaking down from a parallel channel, with annotated short-term targets at $70,144.54 and $59,141.42, before projecting a major rally to a new all-time high of $144,319.82, aligning with the posted bearish-then-bullish roadmap to $53K–55K accumulation and a $144K ATH target.

Vivek Sen @Vivek4real_ · 2026-07-02T01:54:00+00:00

ANYTIME YOU THINK OF SELLING BITCOIN, REMEMBER THIS GUY.

The image shows a Twitter exchange where Nick Allen posted on 25/10/2011 mocking Bitcoin at $2.70, saying he was glad he didn't buy in, and later responded to a user asking if he was still alive with "alive but dead inside." This illustrates the cautionary message about Bitcoin's dramatic price appreciation since 2011, when early skeptics who avoided buying likely watched it grow into a multi-trillion dollar asset.

AI visual analysis: The image shows a Twitter exchange where Nick Allen posted on 25/10/2011 mocking Bitcoin at $2.70, saying he was glad he didn't buy in, and later responded to a user asking if he was still alive with "alive but dead inside." This illustrates the cautionary message about Bitcoin's dramatic price appreciation since 2011, when early skeptics who avoided buying likely watched it grow into a multi-trillion dollar asset.

Metaplanet Inc. @Metaplanet · 2026-07-02T06:32:05+00:00

Notice Regarding the Second Quarter Financial Results for the Bitcoin Income Business for the Period Ending December 2026

The image shows an official notice from Metaplanet Inc. (株式会社メタプラネット, CEO Simon Gerovich) dated July 2, 2026, announcing Q2 financial results for their Bitcoin Income business, reporting quarterly sales of ¥2,969.3 million and cumulative sales of ¥10,779.7 million through Q2, alongside a revision of their cumulative average Bitcoin acquisition price forecast for fiscal year 2026. The accompanying post's title accurately summarizes this notice, which details the company's Q2 performance and explains that they use both spot and cash-settled Bitcoin options strategies in the put-spread approach for their Bitcoin Income business.

AI visual analysis: The image shows an official notice from Metaplanet Inc. (株式会社メタプラネット, CEO Simon Gerovich) dated July 2, 2026, announcing Q2 financial results for their Bitcoin Income business, reporting quarterly sales of ¥2,969.3 million and cumulative sales of ¥10,779.7 million through Q2, alongside a revision of their cumulative average Bitcoin acquisition price forecast for fiscal year 2026. The accompanying post's title accurately summarizes this notice, which details the company's Q2 performance and explains that they use both spot and cash-settled Bitcoin options strategies in the put-spread approach for their Bitcoin Income business.

MANDO CT @XMaximist · 2026-07-02T10:02:46+00:00

Metaplanet just bought another 2,823 BTC worth $170.7M. That takes its treasury to 43,000 BTC (around $2.6B) and cements its position as the 3rd largest publicly traded Bitcoin holder in the world. (CoinDesk⁠) What’s even more interesting? They’re not just buying Bitcoin.

An infographic announces Metaplanet just bought more Bitcoin—2,823 BTC worth $170.7M—bringing its total treasury to 43,000 BTC (~$2.6B) and making it the 3rd largest publicly traded Bitcoin holder, with a glowing Bitcoin coin and Japanese flag set against the Tokyo Tower skyline. The design visually reinforces the post's message of Metaplanet's aggressive Bitcoin accumulation strategy, highlighting Q2 revenue of ¥1.75B (~$10.85M) from Bitcoin strategies alongside the tagline "The playbook is clear. The leaderboard is shifting."

AI visual analysis: An infographic announces Metaplanet just bought more Bitcoin—2,823 BTC worth $170.7M—bringing its total treasury to 43,000 BTC (~$2.6B) and making it the 3rd largest publicly traded Bitcoin holder, with a glowing Bitcoin coin and Japanese flag set against the Tokyo Tower skyline. The design visually reinforces the post's message of Metaplanet's aggressive Bitcoin accumulation strategy, highlighting Q2 revenue of ¥1.75B (~$10.85M) from Bitcoin strategies alongside the tagline "The playbook is clear. The leaderboard is shifting."

Bitcoin.com News @BitcoinNews · 2026-07-02T17:44:35+00:00

JUST IN: Public companies hold roughly 1.3 million $BTC , about 6.37% of total supply, across tracked treasuries. Strategy leads with 846,842 BTC worth $52.31B, followed by Twenty One Capital and Metaplanet with over 40,000 #Bitcoin each.

A donut chart from Bitcoin.com News breaks down the 1,336,674 BTC held by public companies, showing Strategy dominating at 63.35% (about 847K BTC), with Twenty One Capital (3.26%), Metaplanet (3.01%), and MARA Holdings (2.72%) among the next largest holders, while "Others" account for 15.28% of the corporate Bitcoin supply.

AI visual analysis: A donut chart from Bitcoin.com News breaks down the 1,336,674 BTC held by public companies, showing Strategy dominating at 63.35% (about 847K BTC), with Twenty One Capital (3.26%), Metaplanet (3.01%), and MARA Holdings (2.72%) among the next largest holders, while "Others" account for 15.28% of the corporate Bitcoin supply.

Titan @Washigorira · 2026-07-02T15:15:07+00:00

#ETH may finally be ready to outperform #BTC. Weekly gold crosses don’t happen often. They deserve attention.

The image displays an ETH/BTC weekly chart on Binance showing historical moving average crossovers, with a current "Gold cross" highlighted in the lower right—indicating the shorter-term MA crossing above the longer-term MA, signaling a potential shift in momentum favoring Ethereum over Bitcoin. This visualizes the post's claim that ETH may be poised to outperform BTC following this rare bullish technical signal.

AI visual analysis: The image displays an ETH/BTC weekly chart on Binance showing historical moving average crossovers, with a current "Gold cross" highlighted in the lower right—indicating the shorter-term MA crossing above the longer-term MA, signaling a potential shift in momentum favoring Ethereum over Bitcoin. This visualizes the post's claim that ETH may be poised to outperform BTC following this rare bullish technical signal.

The Wolf Of All Streets @scottmelker · 2026-07-02T14:01:53+00:00

What if the bitcoin bottom is already in?

Ran Neuner @cryptomanran · 2026-07-02T12:15:00+00:00

Every red June in Bitcoin's history has been followed by a green July. But this time there's far more than seasonality supporting the case. The data is beginning to align. Going LIVE in 1 HOUR to break down the signals pointing to Bitcoin's next major move.

A Bitcoin monthly returns table from Coinglass showing historical performance across all months from 2013-2025, with the June and July columns highlighted to emphasize the pattern that every negative June (red) has been followed by a positive July (green), supporting the post's claim about Bitcoin's seasonal tendency and upcoming bullish signal.

AI visual analysis: A Bitcoin monthly returns table from Coinglass showing historical performance across all months from 2013-2025, with the June and July columns highlighted to emphasize the pattern that every negative June (red) has been followed by a positive July (green), supporting the post's claim about Bitcoin's seasonal tendency and upcoming bullish signal.

0x思远 @nftsiy · 2026-07-02T10:04:49+00:00

Here's a gut-punch truth: Plenty of folks in the crypto circle stare at K-line charts all day until their eyes blur, but if you ask them what CPI is or why Fed rate hikes tank the market, they immediately start hemming and hawing. Don't deny it—I used to be just like that

An infographic titled 'TradFi 科普一百问: 全景交易员成长路径' outlining 6 learning modules including 金融基石, 资产百科, 交易机制, 宏观经济, 风险与人性, and 全景交易所.

AI visual analysis: An infographic titled 'TradFi 科普一百问: 全景交易员成长路径' outlining 6 learning modules including 金融基石, 资产百科, 交易机制, 宏观经济, 风险与人性, and 全景交易所.

𝗖𝗛𝗔𝗜𝗡 𝗠𝗜𝗡𝗗 @0xChainMind · 2026-07-02T14:07:14+00:00

DUMP BELOW $58K WILL BE BRUTAL! I've been trading for 7 years, and the same thing happened back in 2022 at the 15K bottom Here's why most missed the 15K bottom, and how everyone's about to miss this one too: Reversals never happen without flushing out the majority first And

A Bitcoin/USD weekly candlestick chart on TradingView spanning July 2024 to 2026, with the price currently around $60,000 and a projected orange trendline suggesting a potential reversal upward toward $120,000. The chart visually supports the post's argument that a dip below $58K would mirror the 2022 bottom at $15K, where a sharp reversal followed a period of consolidation and bearish sentiment.

AI visual analysis: A Bitcoin/USD weekly candlestick chart on TradingView spanning July 2024 to 2026, with the price currently around $60,000 and a projected orange trendline suggesting a potential reversal upward toward $120,000. The chart visually supports the post's argument that a dip below $58K would mirror the 2022 bottom at $15K, where a sharp reversal followed a period of consolidation and bearish sentiment.

₿IRB @crypto_birb · 2026-07-02T12:00:02+00:00

Bottom is NOT in But I'm long

CryptoReviewing @CryptoReviewing · 2026-07-02T08:47:29+00:00

$BTC is now above the $60,000 level. Still just a relief rally after a 30% correction. $63,000 and $66,000 are the key levels to reclaim before new cycle low.

BRITISH HODL @BritishHodl · 2026-07-02T14:52:09+00:00

Asian markets falling while Bitcoin rising… 50-60% of Asian Markets (ex Japan) are AI/Robots related. 45-50% of US markets are now AI/Robots related. Most insane over-indexing I’ve ever seen. CO’s are already hiring back workers and stopping AI usage because it’s too

The Wolf Of All Streets @scottmelker · 2026-07-02T09:07:40+00:00

US SPOT $BTC ETFS RECORD $295M OUTFLOWS JULY 1, EXTENDS NEGATIVE STREAK TO 10 DAYS

K A Y @kay_drake_ · 2026-07-02T14:51:52+00:00

Crypto woke up and chose violence today. $BTC back at $62K, $ETH reclaiming $1.7K, and shorts getting absolutely smoked with $140M liquidated in just 60 minutes. That’s not a tiny bounce. That’s the market reminding everyone not to get too comfortable leaning bearish. $135B

A Binance price chart shows BTC/USDT climbing sharply to $62,003.99 (+5.23%), matching the post's claim that Bitcoin surged back to $62K in a violent short squeeze that triggered $140M in liquidations.

AI visual analysis: A Binance price chart shows BTC/USDT climbing sharply to $62,003.99 (+5.23%), matching the post's claim that Bitcoin surged back to $62K in a violent short squeeze that triggered $140M in liquidations.

Whale Alert @whale_alert · 2026-07-02T11:54:08+00:00

859 $BTC (52,632,291 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/9b5 …

That Martini Guy ₿ @MartiniGuyYT · 2026-07-02T02:10:07+00:00

Michael Saylor just said: "In the year 2045, I think that Bitcoin is worth $13 million, so every bitcoin that you don’t buy is a $13 million cost.”

Kraken @krakenfx · 2026-07-02T16:29:36+00:00

A whole bitcoin is up for grabs Plus, 105 more winners will walk away with BTC prizes. Enroll in the Kraken app, trade spot during the FIFA World Cup 2026™ to stack entries. → app.kraken.com/JDNW/sweepstake T&Cs apply.

A woman holds a gold Bitcoin coin in front of a purple tropical backdrop, with a speech bubble above her reading "A whole Bitcoin is up for grabs"—promoting Kraken's FIFA World Cup 2026 sweepstakes where 106 total winners can earn BTC prizes.

AI visual analysis: A woman holds a gold Bitcoin coin in front of a purple tropical backdrop, with a speech bubble above her reading "A whole Bitcoin is up for grabs"—promoting Kraken's FIFA World Cup 2026 sweepstakes where 106 total winners can earn BTC prizes.

Lawrence Lepard, "fix the money, fix the world" @LawrenceLepard · 2026-07-02T22:39:22+00:00

All theatre. He will coo like a dove once Ted Lasso, Fed Chair wins the “family fight”. This isn’t hard folks. Sound money already smells it. Straight up since Sintra.

Jeremy @Jeremybtc · 2026-07-02T16:19:14+00:00

Another $30 MILLION in Bitcoin just moved from a drug dealer who lost the keys a decade ago. The dealer is Clifton Collins, an Irish beekeeper turned cannabis grower. He bought 6,000 Bitcoin back in 2011 for about $30,000. To hide it, he printed the keys on paper and stuffed

An Arkham Intelligence profile page for Clifton Collins showing a verified portfolio of 4.5K BTC valued at $276,849,098.84, up 2.38% on the day, with a "BTC Whale" tag and 14 associated addresses—illustrating the on-chain trail of the long-dormant Bitcoin holdings referenced in the post about the Irish beekeeper's forgotten crypto fortune.

AI visual analysis: An Arkham Intelligence profile page for Clifton Collins showing a verified portfolio of 4.5K BTC valued at $276,849,098.84, up 2.38% on the day, with a "BTC Whale" tag and 14 associated addresses—illustrating the on-chain trail of the long-dormant Bitcoin holdings referenced in the post about the Irish beekeeper's forgotten crypto fortune.

Evan Luthra @EvanLuthra · 2026-07-02T15:28:35+00:00

In 2011, someone bought 10,000 Bitcoin for just $7,805 at $0.78 per BTC. They held through every crash for nearly 14 years. In 2025, they sold it for over $1 billion. A 128,205x return!

The image shows a blockchain transaction history for 10,000 BTC, displaying an original purchase on April 2, 2011 at $0.78 per BTC (totaling $7,805) and a complete sell-off on July 3, 2025 at $109,246.30 per BTC, illustrating the staggering 128,205x return mentioned in the post after holding for nearly 14 years.

AI visual analysis: The image shows a blockchain transaction history for 10,000 BTC, displaying an original purchase on April 2, 2011 at $0.78 per BTC (totaling $7,805) and a complete sell-off on July 3, 2025 at $109,246.30 per BTC, illustrating the staggering 128,205x return mentioned in the post after holding for nearly 14 years.

Blockchainedbb @blockchainedbb · 2026-07-02T12:32:16+00:00

Hope this video helps you decide next $BTC trade

Ripe @BTCKiK · 2026-07-02T16:51:30+00:00

Robinhood recently launched its mainnet, but hardly anyone is paying attention to it. New chains naturally come with plenty of money-making opportunities. Robinhood has been a strong supporter of meme coins from way back, with SHIB going live for trading as early as April 2022,

A screenshot of a Virtuals Protocol tweet announcing "Raxol," the first AI agent on RobinhoodApp Chain powered by Virtuals, featuring a terminal-style video showing autonomous agent transactions (including a 0.18 ETH quote signed by 0xHUMAN and settled privately via Xochi). The post highlights how Robinhood's new mainnet is quietly hosting agentic commerce, aligning with the narrative that early attention to Robinhood's chain could reveal emerging opportunities similar to its past meme coin support.

AI visual analysis: A screenshot of a Virtuals Protocol tweet announcing "Raxol," the first AI agent on RobinhoodApp Chain powered by Virtuals, featuring a terminal-style video showing autonomous agent transactions (including a 0.18 ETH quote signed by 0xHUMAN and settled privately via Xochi). The post highlights how Robinhood's new mainnet is quietly hosting agentic commerce, aligning with the narrative that early attention to Robinhood's chain could reveal emerging opportunities similar to its past meme coin support.

BTC. ONLY. @IntroMax17 · 2026-07-02T14:04:11+00:00

For the first time, I bought another crypto than my beloved $BTC . Toccata is insane. Kaspa.

A wallet balance screen shows a holdings of 100.000 KAS, equivalent to €3.472,21, illustrating the user's first crypto purchase beyond Bitcoin—Kaspa ($KAS).

AI visual analysis: A wallet balance screen shows a holdings of 100.000 KAS, equivalent to €3.472,21, illustrating the user's first crypto purchase beyond Bitcoin—Kaspa ($KAS).

saviourz666 @reddit · 2026-07-02T19:02:32.492000+00:00

Thinking of going all in . I know I will probably get a lot of stick for this . As is the way with everything in life . However I’m thinking of going all in on btc . When I say all in , I mean putting the little cash I currently have saved else where in to bitcoin . I actually brought in last week at what I believe is a good price of 44,000 gbp ( about 57 k dollars ) . I only hold one other investment , which is the Nasdaq , however I genuinely believe we have a great asset here . Right now I get there is a lot of fear regarding btc . But I believe the 4 year cycle is real . It’s following it right now down to the bone . After everyone said last year it’s done . It’s holding true . Has anyone else made it a 100 percent of their portfolio ? If so , for what reason ? Peace !

Ifad @yep_ifad · 2026-07-02T10:14:36+00:00

Looking for a crypto casino that rewards you from the very first bet? I've been checking out @MineBitHQ for its instant rakeback, fast payouts, and smooth gameplay. Worth a look if you're into crypto gaming. #Minebit #crypto #bitcoin

BitQuant @BitQua · 2026-07-02T16:19:51+00:00

Today you’re debating whether $60K is a good price to buy Bitcoin. Soon, you’ll be debating whether a $60K daily move in Bitcoin is significant at all. You’ll think, “Yesterday Bitcoin was $60K cheaper than it is today, but that’s not a meaningful enough difference to keep me

FRENNY @FrennyDefi · 2026-07-02T10:18:30+00:00

Crypto casino that actually pays out. Instant rakeback, fast payouts, and rewards from your first bet. @MineBitHQ #Minebit #Crypto #Bitcoin

COİN UZMANI @coinuzmann · 2026-07-02T06:08:45+00:00

I'll share with you a coin with a market value of $20,000. Promise you'll hold it until it goes 500x. Up to 10 million. Do you accept the deal? If you accept, like and retweet I'll send the CA to those who write *ME* in the comments

Sahid @mominsdcc · 2026-07-02T11:03:45+00:00

Crypto casino with instant rakeback, fast payouts, and rewards from your first bet. @MinebitHQ Go here: minebit.com #minebit #crypto #cryptogaming #cryptogambling #bitcoin

Mookie @MookieNFT · 2026-07-02T13:47:26+00:00

Market is finally green today. $BTC is almost back at $62K (+3.13%) $ETH +5.96% $SOL +5.34% after all that red it’s good to see green again. let’s see how it goes…

A cryptocurrency market dashboard shows all major coins trading in the green, with BTCUSD at $61,827.29 (+3.13%), ETHUSD at $1,703.44 (+5.96%), SOLUSD at $81.51 (+5.34%), along with BNB, XRP, HYPE, and SUI all posting gains of 2-5%—visually confirming the post's observation that the market has finally turned green after a period of red.

AI visual analysis: A cryptocurrency market dashboard shows all major coins trading in the green, with BTCUSD at $61,827.29 (+3.13%), ETHUSD at $1,703.44 (+5.96%), SOLUSD at $81.51 (+5.34%), along with BNB, XRP, HYPE, and SUI all posting gains of 2-5%—visually confirming the post's observation that the market has finally turned green after a period of red.

Crypto GVR @GVRCALLS · 2026-07-02T08:42:11+00:00

#Bitcoin gonna start reversal in between 50-60K$ and then it could hit 100-150K$ in this year

The image shows a Binance BTC/USDT monthly chart with Bitcoin at $60,454.80, displaying a blue arrow that illustrates a historical price pattern—dropping from ~$126K, consolidating in the $49K–$60K range, and then surging toward $108K before topping at $131K—suggesting the post's prediction that Bitcoin will reverse between $50-60K and rally toward $100-150K this year.

AI visual analysis: The image shows a Binance BTC/USDT monthly chart with Bitcoin at $60,454.80, displaying a blue arrow that illustrates a historical price pattern—dropping from ~$126K, consolidating in the $49K–$60K range, and then surging toward $108K before topping at $131K—suggesting the post's prediction that Bitcoin will reverse between $50-60K and rally toward $100-150K this year.

Marc ₿ @marc02200 · 2026-07-02T19:00:58+00:00

Would you rather have 1 full $BTC right now, or $65k worth of $MSTR ? What’s your pick and why?

Bitcoin (BTC) is shown trading at $61,662.00, up $1,566.21 (+2.61%), with a market cap of $1.24T—visually reinforcing the post's dilemma by highlighting BTC's price sitting just below the $65k MSTR threshold mentioned.

AI visual analysis: Bitcoin (BTC) is shown trading at $61,662.00, up $1,566.21 (+2.61%), with a market cap of $1.24T—visually reinforcing the post's dilemma by highlighting BTC's price sitting just below the $65k MSTR threshold mentioned.

Crypto Tony @CryptoTony__ · 2026-07-02T12:56:00+00:00

SENTIMENT CHECK Do you think the Bitcoin bottom is in ? Comment below your thoughts

BITCOINLFG® @bitcoinlfgo · 2026-07-02T10:00:28+00:00

BIGGGG JAPAN GOES BIG ON BITCOIN METAPLANET JUST BOUGHT ANOTHER 2,823 #BITCOIN WORTH $170,000,000 AFTER A 3-MONTH BUYING PAUSE

A waving Japanese flag (white with a red circle) is overlaid with the yellow Bitcoin (₿) symbol, representing Metaplanet Inc., the Japanese company that recently purchased 2,823 Bitcoin ($170M) following a three-month buying pause, signaling Japan's growing embrace of the cryptocurrency.

AI visual analysis: A waving Japanese flag (white with a red circle) is overlaid with the yellow Bitcoin (₿) symbol, representing Metaplanet Inc., the Japanese company that recently purchased 2,823 Bitcoin ($170M) following a three-month buying pause, signaling Japan's growing embrace of the cryptocurrency.

XT Exchange @XTexchange · 2026-07-02T10:37:39+00:00

XT X Space: Strategy, Bitcoin, and the Billion-Dollar Question x.com/i/spaces/1dJrP … July 03, 2026, 08:00 (UTC) $300 Giveaway: Follow @XTexchange Like & RT with hashtags #Bitcoin #Giveaway & Tag 3 friends Leave your questions & XT UID below! Host: XT

A promotional graphic for an XT X Space event titled "Strategy, Bitcoin, and the Billion-Dollar Question," featuring five participants including Host XT, Co-host Theo, Marketing Director Arman Achmed, Business Development Director Akshay, and KOL Auwal Khan. The image highlights a $300 giveaway and an event date of July 03, 2026, at 08:00 (UTC), with a QR code for joining the space.

AI visual analysis: A promotional graphic for an XT X Space event titled "Strategy, Bitcoin, and the Billion-Dollar Question," featuring five participants including Host XT, Co-host Theo, Marketing Director Arman Achmed, Business Development Director Akshay, and KOL Auwal Khan. The image highlights a $300 giveaway and an event date of July 03, 2026, at 08:00 (UTC), with a QR code for joining the space.

Samson Mow @Excellion · 2026-07-02T19:21:19+00:00

Just a reminder that aside from capital flowing out to AI, there’s absolutely no structural reason for #Bitcoin to be down here. It’s just a self-fulfilling fear induced temporary bear market. Plan accordingly.

SOU @SOU_BTC · 2026-07-02T12:32:34+00:00

【Breaking News】 U.S. Employment Report: Nonfarm Payrolls Significantly Miss Expectations ・Nonfarm Payrolls: +57,000 (Forecast +114,000) ・Unemployment Rate: 4.2% (Forecast 4.3%) ・May's Nonfarm Payrolls Revised Down by 43,000 While nonfarm payrolls fell well short

Seth @seth_fin · 2026-07-02T18:31:00+00:00

$BTC IMBALANCE SHORT VS LONG, BILLIONS OF LIQUIDITY ABOVE. BUT BE PATIENT. DON'T FORGET THE 10/10 LIQUIDATION EVENT THAT LIQUIDATED OVER $100B SINCE. LOOK AT THAT CANDLE IN OCTOBER 2025. WHO DID IT?

子棋(重生版) @cloakmk · 2026-07-02T13:40:25+00:00

Has the bear market ended, or is the bottom still forming? From a technical structure perspective, $BTC has formed a standard downtrend since peaking at $82,000. Recently, it dropped to a low near $58,000, a decline of nearly 30%, followed by clear support in the $60,000 zone

A candlestick price chart showing a clear downtrend with a descending trendline, with prices declining from around 82,500 to 61,000 over a May-to-July timeframe.

AI visual analysis: A candlestick price chart showing a clear downtrend with a descending trendline, with prices declining from around 82,500 to 61,000 over a May-to-July timeframe.

Nebraskangooner @Nebraskangooner · 2026-07-02T17:31:15+00:00

$SPY is red... That must mean #Bitcoin is... ...Wait... ...Could it be... #Bitcoin is... Green!?

Phyrex @PhyrexNi · 2026-07-02T05:39:08+00:00

What is selling Calls for rent collection? What is ladder selling Calls? What is cumulative Puts? Options, dual-currency small details After reading the options pieces on selling Calls for rent collection by my two friends @BTC__options and @CryptoRounder —written really well—I'm

A Chinese-language infographic explaining '卖 Call 收租' (selling Call options for rent) using Bitcoin options, Call, Put, and straddle strategies.

AI visual analysis: A Chinese-language infographic explaining '卖 Call 收租' (selling Call options for rent) using Bitcoin options, Call, Put, and straddle strategies.

SantinoCripto® @SantinoCripto · 2026-07-02T15:48:34+00:00

THIS BITCOIN REBOUND COULD BE NUMBERED My scenario remains the same: Rebound up to the zone between 63K$- 68K$ (at most). After that, I expect a significant drop. My plan: • SHORT Entry: 68K$ • Take Profit: 59K$ / 50K$ • Stop Loss: 78K$ The limit orders are

吕不凡BitExtr @bitextr · 2026-07-02T12:39:57+00:00

I've already grown tired of repeating myself Right now, BTC has surged nearly 2000 points Take a look at gold too—it's also climbed nearly 200 points now

A mobile screenshot from a trading bot app shows a BitExtr signal alert for XAU/USDT at 4,015.31, noting RSI at 27.4 with low RSI signaling bullish divergence—juxtaposing the post's frustration about repeatedly predicting market moves while gold surges 200 points and BTC climbs 2,000 points.

AI visual analysis: A mobile screenshot from a trading bot app shows a BitExtr signal alert for XAU/USDT at 4,015.31, noting RSI at 27.4 with low RSI signaling bullish divergence—juxtaposing the post's frustration about repeatedly predicting market moves while gold surges 200 points and BTC climbs 2,000 points.

Whale Alert @whale_alert · 2026-07-02T17:56:09+00:00

999 $BTC (61,669,182 USD) transferred from #Coinbase to unknown wallet whale-alert.io/tx/bitcoin/7ee …

Rekt Capital @rektcapital · 2026-07-02T12:29:38+00:00

#BTC Bitcoin indeed rejected from the Macro Triangle Base Bitcoin indeed broke down from the purple 50-Month EMA And once Bitcoin turns the 50 EMA into new resistance on this relief rally, it will likely enter additional Bearish Acceleration over time $BTC #Crypto #Bitcoin

A TradingView monthly candlestick chart of BTC/USD on Bitfinex (dated July 2, 2026) shows Bitcoin at $61,282.0, with a descending macro triangle pattern and the price having broken below the purple 50-month EMA, visually reinforcing the post's claim of a bearish breakdown from key technical support.

AI visual analysis: A TradingView monthly candlestick chart of BTC/USD on Bitfinex (dated July 2, 2026) shows Bitcoin at $61,282.0, with a descending macro triangle pattern and the price having broken below the purple 50-month EMA, visually reinforcing the post's claim of a bearish breakdown from key technical support.

Sjuul | AltCryptoGems @AltCryptoGems · 2026-07-02T17:51:15+00:00

Episode 40 of the @AltCryptoCast is now Live! #Bitcoin holding $59K, #ANSEM hitting $130M, and MiCA is already shaking up crypto in Europe. Watch the full episode here: youtu.be/mIZXuCyRcSc?si …

A man drinks from a black "AltCryptoCast" branded mug with overlaid text reading "BITCOIN HOLDING STRONG? episode 40," promoting the latest podcast episode featuring Bitcoin at $59K, ANSEM's $130M milestone, and MiCA's impact on European crypto.

AI visual analysis: A man drinks from a black "AltCryptoCast" branded mug with overlaid text reading "BITCOIN HOLDING STRONG? episode 40," promoting the latest podcast episode featuring Bitcoin at $59K, ANSEM's $130M milestone, and MiCA's impact on European crypto.

Gary Cardone @GaryCardone · 2026-07-02T15:15:47+00:00

perhaps open your ear buds; i continue to say that OG sub $3000 bitcoin whales have not bought any significant bitcoin at $50k, they are sitting on their bags, not selling, not buying, pushing out podcast promoting bitcoin, while waiting for legacy money to do the heavy lifting.

Hamza aka Crypto Trader @traderhamza · 2026-07-02T09:04:22+00:00

Bitcoin There are two scenarios: 1) This was a flat correction. The drop will continue. 2) The entire drop is over, the rocket is starting. We need sustained levels above 60900; if that happens, the rocket will follow. #bitcoin

The image shows a Bitcoin (BTCUSDT) 30-minute candlestick chart on TradingView with a price annotation of 60,900, illustrating "Senaryo 1" (Scenario 1) where a sustained level above 60,900 is needed for a bullish continuation, as referenced in the accompanying post discussing two potential Bitcoin price scenarios.

AI visual analysis: The image shows a Bitcoin (BTCUSDT) 30-minute candlestick chart on TradingView with a price annotation of 60,900, illustrating "Senaryo 1" (Scenario 1) where a sustained level above 60,900 is needed for a bullish continuation, as referenced in the accompanying post discussing two potential Bitcoin price scenarios.

Crypto Tony @CryptoTony__ · 2026-07-02T07:07:00+00:00

$BTC / $USD - Update After the big run ups, $59,000 is the area we are looking for, on the dips to get in safely if you missed out yesterday

A TradingView candlestick chart of BTC/USD shows Bitcoin's price hovering near $60,691 with a drawn arrow pointing toward the $59,000 support level, aligning with the post's suggestion to buy dips around $59,000 after recent rallies.

AI visual analysis: A TradingView candlestick chart of BTC/USD shows Bitcoin's price hovering near $60,691 with a drawn arrow pointing toward the $59,000 support level, aligning with the post's suggestion to buy dips around $59,000 after recent rallies.

Whale Alert @whale_alert · 2026-07-02T22:08:02+00:00

1,000 $BTC (61,508,328 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/100 …

NoName @WhaleNoName · 2026-07-02T14:18:22+00:00

FACT: BTC BEAR MARKETS LAST EXACTLY 365 DAYS Another fact - bull markets last exactly 1064 days Look at the chart This pattern has repeated three cycles in a row without missing And now we're currently on day 255 of this bear market Good news: We still have 100+ days

The image features the Bitcoin (BTC) logo—a stylized white "₿" symbol with two vertical strokes—centered on a gradient orange background. It serves as a visual representation of Bitcoin to accompany the post's analysis of historical BTC bear and bull market cycle durations.

AI visual analysis: The image features the Bitcoin (BTC) logo—a stylized white "₿" symbol with two vertical strokes—centered on a gradient orange background. It serves as a visual representation of Bitcoin to accompany the post's analysis of historical BTC bear and bull market cycle durations.

CryptoGoos @cryptogoos · 2026-07-02T16:18:00+00:00

If you didn't buy more Bitcoin in the $58,000-$60,000 range, you're a fool.

MARMOT @Web3Marmot · 2026-07-02T19:21:06+00:00

DON'T FALL FOR THIS BTC FAKEOUT Massive short liquidity sitting at $63K. Market makers are pushing the price up to hunt it. They'll wipe the shorts and reverse. Then the real dump begins. My roadmap: 1. Pump to $63K → shorts get squeezed 2. Dump below $57K → new longs

Bull Theory @BullTheoryio · 2026-07-02T14:19:38+00:00

BREAKING: Bitcoin reclaims $62,000 as June jobs data came in weaker than expected, lowering odds of a Fed rate hike. Over $69 billion has been added to the crypto market in the last 6 hours. Bitcoin is up +3.5%, adding roughly $41 billion to its market cap. Ethereum is up

Side-by-side TradingView charts showing Bitcoin/U.S. Dollar at $62,002 (+3.40%) on the left and Ethereum/U.S. Dollar at $1,713.46 (+6.58%) on the right, both displaying green bullish candles.

AI visual analysis: Side-by-side TradingView charts showing Bitcoin/U.S. Dollar at $62,002 (+3.40%) on the left and Ethereum/U.S. Dollar at $1,713.46 (+6.58%) on the right, both displaying green bullish candles.

AlΞx Wacy @wacy_time1 · 2026-07-02T09:32:00+00:00

Long-term Bitcoin holders are aggressively accumulating again. Bottom is already forming. $BTC

Choquei BTC @choqueibtc · 2026-07-02T17:12:16+00:00

URGENT: Famous crypto influencer Augusto Backes @AugustoBackes completely trashes ChoqueiBTC and makes a harsh accusation against Brazil's biggest crypto media outlet. In a live stream held today, Backes accused the ChoqueiBTC team of clipping segments from his lives out of

NAHID @maxnahid0 · 2026-07-02T10:19:27+00:00

First bet. First rakeback. Instant rewards with @MinebitHQ Fast payouts and a smooth crypto casino experience. #Minebit #crypto #bitcoin

Lemon @TheCryptoLemon · 2026-07-02T21:24:51+00:00

Now that they have managed to get you in long because everyone is already calling the ultimate bottom, it is time for the nuclear bomb. $BTC

The image shows a Bitcoin (BTC/USD) price chart with a dramatic vertical drop toward the end, plunging from around $56,000 down to approximately $45,000, emphasizing the predicted "nuclear bomb" market crash referenced in the post. The current price is marked at $61,517.4, with the chart's overall downtrend from highs near $84,000 visually reinforcing the bearish outlook.

AI visual analysis: The image shows a Bitcoin (BTC/USD) price chart with a dramatic vertical drop toward the end, plunging from around $56,000 down to approximately $45,000, emphasizing the predicted "nuclear bomb" market crash referenced in the post. The current price is marked at $61,517.4, with the chart's overall downtrend from highs near $84,000 visually reinforcing the bearish outlook.

Merlijn The Trader @MerlijnTrader · 2026-07-02T11:00:01+00:00

FBI DIRECTOR FILED HIS SIX-FIGURE BITCOIN-STOCK BUY 141 DAYS LATE. THE PENALTY: $0. Kash Patel bought $100K–$250K of Strategy $MSTR in November. The STOCK Act gives officials 45 days to disclose. He took 186. The fine for a first violation: $200. The agency that issues it is

Kash Patel, wearing glasses and a dark blue suit with a red tie, appears to be testifying before Congress while holding a pen near his forehead.

The image relates to the post about FBI Director Kash Patel's late disclosure of his Bitcoin-stock purchase.

AI visual analysis: Kash Patel, wearing glasses and a dark blue suit with a red tie, appears to be testifying before Congress while holding a pen near his forehead. The image relates to the post about FBI Director Kash Patel's late disclosure of his Bitcoin-stock purchase.

Subit @Subit_Crypto · 2026-07-02T10:36:04+00:00

If you’re looking for a fun crypto casino, this one delivers with fast payouts, instant rakeback, and rewards from day one. @MineBitHQ #Minebit #Crypto #Bitcoin Watch [Spoken audio]: Es vida para matarlo

CryptoQuant.com @cryptoquant_com · 2026-07-02T19:27:10+00:00

Bitcoin is testing $60K support, and exchange deposits are flashing warning signs. BTC inflows jumped above 50K/day, ETH inflows spiked above 1.25M, and altcoin deposits hit a two-month high. Whales appear to be leading the move. Incoming volatility.

A CryptoQuant chart titled "Bitcoin: Exchange Inflow (Total) – All Exchanges" shows BTC price (currently $59.9K) plotted alongside exchange inflow data, with red circles highlighting four instances since January where total exchange inflows spiked above 50K BTC—corresponding to periods of heightened selling pressure and price volatility, as noted in the accompanying post about Bitcoin testing $60K support and whales driving deposit surges.

AI visual analysis: A CryptoQuant chart titled "Bitcoin: Exchange Inflow (Total) – All Exchanges" shows BTC price (currently $59.9K) plotted alongside exchange inflow data, with red circles highlighting four instances since January where total exchange inflows spiked above 50K BTC—corresponding to periods of heightened selling pressure and price volatility, as noted in the accompanying post about Bitcoin testing $60K support and whales driving deposit surges.

Trending Bitcoin @TrendingBitcoin · 2026-07-02T02:02:00+00:00

Michael Saylor explains how to 100x your money and says, “in the year, 2045 I think that Bitcoin is worth $13 million, so every bitcoin that you don’t buy is a $13 million cost.”

LSTRADER @LSTraderCrypto · 2026-07-02T13:42:55+00:00

$BTC HTF Update With the breakout above the dashed line, we’re now seeing stronger, higher-volume candles. The momentum is on our side. We’ve capitalized on some great analyses, and we’re staying focused. Lstrader followers are truly lucky.

A 12-hour BTCUSDT.P candlestick chart on Binance showing a price range between $59,063.3 and $67,298.1, with hand-drawn annotations depicting a rounded bottom pattern and an upward projection toward the $67,000 resistance level, aligning with the post's bullish thesis that the dashed-line breakout has confirmed upward momentum.

AI visual analysis: A 12-hour BTCUSDT.P candlestick chart on Binance showing a price range between $59,063.3 and $67,298.1, with hand-drawn annotations depicting a rounded bottom pattern and an upward projection toward the $67,000 resistance level, aligning with the post's bullish thesis that the dashed-line breakout has confirmed upward momentum.

Always win @alwayswinsignal · 2026-07-02T17:49:56+00:00

$BTC $ETH Added more to my short bags here

The image shows a trading interface displaying two active short positions: BTCUSDT with an unrealized P&L of -$19,384.43 (-42.69%) at a mark price of $61,633.50, and ETHUSDT with an unrealized P&L of -$37,938.02 (-70.54%) at a mark price of $1,694.52, both on 30x cross leverage. This illustrates the risk of the user's bearish bets, as both positions are deeply underwater despite "adding more" to the shorts.

AI visual analysis: The image shows a trading interface displaying two active short positions: BTCUSDT with an unrealized P&L of -$19,384.43 (-42.69%) at a mark price of $61,633.50, and ETHUSDT with an unrealized P&L of -$37,938.02 (-70.54%) at a mark price of $1,694.52, both on 30x cross leverage. This illustrates the risk of the user's bearish bets, as both positions are deeply underwater despite "adding more" to the shorts.

CryptoReviewing @CryptoReviewing · 2026-07-02T15:46:43+00:00

$BTC has $310M liquidity above at $62,000 - $64,000! Meanwhile, $56,000 - $59,000 below has $1.44B liquidity!!! I’ve written a data-backed market report of exactly what to expect next cryptoreviewing.substack.com/p/crs-vault-ne …

Wu Blockchain @WuBlockchain · 2026-07-02T16:05:27+00:00

DWF Labs: U.S. Spot Bitcoin ETFs Post First-Ever Half-Year Net Outflows Since Launch DWF Labs said U.S. spot Bitcoin ETFs posted their first-ever net outflows on a half-year basis since launch, ending H1 2026 with $5.4 billion in net outflows after recording net inflows in every

A DWF Labs chart titled "Bitcoin ETFs post their first losing half" shows cumulative net flows for US spot Bitcoin ETFs from January 2024 to June 2026, highlighting that H1 2026 saw a $5.4B net outflow, bringing cumulative net flows down to $51.2B.

AI visual analysis: A DWF Labs chart titled "Bitcoin ETFs post their first losing half" shows cumulative net flows for US spot Bitcoin ETFs from January 2024 to June 2026, highlighting that H1 2026 saw a $5.4B net outflow, bringing cumulative net flows down to $51.2B.

Chento @ChentoTrades · 2026-07-02T14:36:53+00:00

Gave the short, liquidity giving a mixed view, moving SL to BE $btc

A BTCUSDT perpetual contract chart on a 5-minute timeframe showing a short position with stop loss moved to breakeven, displaying detailed order book data including active long/short counts (33/10) and key liquidity levels around $63,814-$64,116, aligning with the trader's note of taking a short and adjusting risk management despite mixed liquidity signals.

AI visual analysis: A BTCUSDT perpetual contract chart on a 5-minute timeframe showing a short position with stop loss moved to breakeven, displaying detailed order book data including active long/short counts (33/10) and key liquidity levels around $63,814-$64,116, aligning with the trader's note of taking a short and adjusting risk management despite mixed liquidity signals.

Pepesso @0xPepesso · 2026-07-02T16:44:55+00:00

$BTC IS COPY-PASTING 2022 TO THE EXACT DAY Been watching this setup for weeks, it keeps getting more obvious 2022 - everyone screamed $10K until $16K printed and almost nobody bought it 2026 - everyone's screaming $30K, and almost nobody will buy the actual bottom either

0xMarioNawfal @RoundtableSpace · 2026-07-02T17:15:00+00:00

Can we just giga send bitcoin from here

A 4-hour BTC/USDT Binance candlestick chart shows Bitcoin trading at $61,605.67 (+0.40%) after recovering from a low near $59,000, with the post's bullish "giga send" sentiment reflected in the recent bounce off recent lows toward the $62,000 resistance area.

AI visual analysis: A 4-hour BTC/USDT Binance candlestick chart shows Bitcoin trading at $61,605.67 (+0.40%) after recovering from a low near $59,000, with the post's bullish "giga send" sentiment reflected in the recent bounce off recent lows toward the $62,000 resistance area.

TheRustyTwit @rusty_twit · 2026-07-02T22:27:23+00:00

Gloria was good for bitcoin. Her leaving is bad for bitcoin. The way she was hounded out was shameful bullshit, which is the worst for bitcoin.

JrKripto @JrKripto · 2026-07-02T18:28:46+00:00

Everyone who didn't buy Bitcoin at $57,000 and Ethereum at $1,400 is gonna regret it. Poor broke mortals are still waiting like, "If BTC hits $45,000, I'll buy." There are folks saying, "If Ethereum drops to $800, I'll grab some." Sooo, what if it doesn't??? If ETH shoots

Astronomer @astronomer_zero · 2026-07-02T13:32:41+00:00

$btc longs Hourly range high hit, W locked. Four wins in a row. Alright! Still managed to catch the TP since minutes after posting, price hit my TP. That's 25% taken out, locking in the W as the trade is now up 1.85 RR. Indeed a W, no trade up 1.85 RR should ever end up in a

This TradingView chart shows a Bitcoin perpetual contract trade labeled "My Longs" that has hit its "Hourly range" and "TP" targets near $61,900. The chart also indicates a "Final tp (66k)" target and a "Large liquidity pool."

AI visual analysis: This TradingView chart shows a Bitcoin perpetual contract trade labeled "My Longs" that has hit its "Hourly range" and "TP" targets near $61,900. The chart also indicates a "Final tp (66k)" target and a "Large liquidity pool."

Wu Blockchain @WuBlockchain · 2026-07-02T18:00:00+00:00

Strategy CEO: How Do We Decide to Sell Bitcoin? Not an Impulsive Decision On June 19, 2026, Strategy CEO Phong Le @phongle detailed the internal decision-making process behind selling 32 Bitcoins in an interview with Coinage. He stated that as a NASDAQ-listed company, their [Spoken audio]: But I say that as there is not a action we take that isn't thoughtfully and thoroughly deliberated with many constituents. How you landed on 32 Bitcoin at a corporate level, we're a publicly traded U.S. company that's listed on the NASDAQ as a well-known season issuer. We don't have a majority shareholder anymore. Mike does not have a majority shareer. We have eight board members. And then we also look at the Bitcoin holders, the broader community. And frankly, I look at the crypto community all as people that we have to answer to in some way should perform. Big picture, we actually on a quarterly basis try to provide updates to what's happening with the company. And those updates, for example, last quarter, we talked about all the optionality that the company has, right? The fact that we can sell equity, we can sell preferreds, we can sell US dollars, we can sell Bitcoin, we can buy all those things too, right? We can buy back convertible notes. And then monthly, we looked at, okay, what should we be doing? How does it impact Bitcoin per share, right? How does it impact the coin yield? And then how does it impact debt? And so we have a model that we run that looks at our equity and looks at our credit and the quality of both. It's a pretty sophisticated detail model. We run different scenarios on it, run simulations on it. And then on a weekly basis, Mike and I will talk and we'll say, Hey, here's our goal for the week. And literally on a daily basis every morning, we'll discuss, okay, what are the instructions for today? And we discuss that with our treasury team, with our IR team, we talk about it with our traders. And so that's the cascading of how decisions are made. How do we make a decision to buy back $1.5 billion of no-show convertible? We start at the board level and that cascades all the way down to the execution of that with our banks. We don't talk to the board about, was it 32 Bitcoin? We would talk to the board about, hey, we think it makes sense to sell Bitcoin, right? And what are these trades we want? And then the day-to-day decisions are made between Mike and I and members of our Bitcoin team in the company. But I say that as there is not a action we take that isn't thoughtfully and thoroughly deliberated with many constituents. We do grok sentiment analysis on X, right? We say, what do people think? What's the percentage positive? What's the percentage negative? We look at how people visit our website and who's using our strategy app. I mean, we are an analytics company. We do a lot of analytics to every decision we make.

Seth @seth_fin · 2026-07-02T11:19:34+00:00

#BTC at 61.2K liquidating shorts. How wonderful isn't that? 126,227 traders were liquidated, the total liquidations comes in at $470.85 million.

Decode @decodejar · 2026-07-02T23:13:19+00:00

This is actually an extraordinary Bitcoin chart.

A CryptoQuant chart displays Bitcoin's price (white line) fluctuating between approximately $60K-$125K from July 2025 to June 2026, alongside the 30-day % change (blue) and total balance (red). The dramatic divergence and volatility likely supports the "extraordinary" characterization.

AI visual analysis: A CryptoQuant chart displays Bitcoin's price (white line) fluctuating between approximately $60K-$125K from July 2025 to June 2026, alongside the 30-day % change (blue) and total balance (red). The dramatic divergence and volatility likely supports the "extraordinary" characterization.

Living_Layer @reddit · 2026-07-02T17:25:05.422000+00:00

Finally hit the $20,000 mark Suggested for you

The image displays a balance of $20,734.99 with a gain of +$750.00 shown in green. This reflects the post's celebration of finally surpassing the $20,000 milestone in their portfolio, with the green text emphasizing today's positive earnings.

AI visual analysis: The image displays a balance of $20,734.99 with a gain of +$750.00 shown in green. This reflects the post's celebration of finally surpassing the $20,000 milestone in their portfolio, with the green text emphasizing today's positive earnings.

LSTRADER @LSTraderCrypto · 2026-07-02T13:15:45+00:00

$BTC Scalp Plan TP Another ordinary, classic trader profit. One more TP hit. It was a scalp setup with an incredible read. Are your notifications on? BTC HTF analysis is coming next. Like and stay tuned.

A BTCUSDT candlestick chart showing a scalp trade setup, with price dipping into a blue demand zone near $58,000-59,000 before rallying through a green consolidation area and into a beige take-profit zone at approximately $61,694, matching the post's description of a successful BTC scalp trade hitting its target.

AI visual analysis: A BTCUSDT candlestick chart showing a scalp trade setup, with price dipping into a blue demand zone near $58,000-59,000 before rallying through a green consolidation area and into a beige take-profit zone at approximately $61,694, matching the post's description of a successful BTC scalp trade hitting its target.

Jurrien Timmer @TimmerFidelity · 2026-07-02T22:17:00+00:00

That same logic applies to Bitcoin as well. It’s getting closer to its power law support line. Again, I don’t see the catalyst yet for a reversal.

This chart depicts Bitcoin's price against its power law trendline, support line, and resistance line. The accompanying post suggests that Bitcoin is approaching its power law support line, but a catalyst for reversal is not yet apparent.

AI visual analysis: This chart depicts Bitcoin's price against its power law trendline, support line, and resistance line. The accompanying post suggests that Bitcoin is approaching its power law support line, but a catalyst for reversal is not yet apparent.

Whale Alert @whale_alert · 2026-07-02T11:40:32+00:00

877 $BTC (53,769,340 USD) transferred from Coinbase Institutional to unknown wallet whale-alert.io/tx/bitcoin/9e9 …

Crypto GEMs @cryptogems555 · 2026-07-02T12:58:07+00:00

$BTC BULLISH DIVERGENCE HODL

A TradingView chart of Bitcoin ($BTC) against the U.S. Dollar highlights a "Bullish Divergence" pattern, comparing price action to the RSI indicator with green arrows pointing to corresponding lows, supporting the optimistic "$BTC Bullish Divergence HODL" sentiment. Key visible data includes the July 2, 2026 timestamp, a current price of $65,841.64, and a 1-day timeframe.

AI visual analysis: A TradingView chart of Bitcoin ($BTC) against the U.S. Dollar highlights a "Bullish Divergence" pattern, comparing price action to the RSI indicator with green arrows pointing to corresponding lows, supporting the optimistic "$BTC Bullish Divergence HODL" sentiment. Key visible data includes the July 2, 2026 timestamp, a current price of $65,841.64, and a 1-day timeframe.

Max Crypto @MaxCrypto · 2026-07-02T13:40:20+00:00

$BTC and $ETH are pumping back up. $66,000,000 in short positions has been liquidated in just 15 MINUTES.

A Binance trading chart shows BTC/USDT at $61,924.82 with a +5.22% gain, displaying a sharp upward candlestick rally off a low of $60,104.00. The price surge visually corresponds to the post's claim of significant short liquidations, as the steep green candles illustrate the rapid upward momentum that would trigger forced buying from short sellers.

AI visual analysis: A Binance trading chart shows BTC/USDT at $61,924.82 with a +5.22% gain, displaying a sharp upward candlestick rally off a low of $60,104.00. The price surge visually corresponds to the post's claim of significant short liquidations, as the steep green candles illustrate the rapid upward momentum that would trigger forced buying from short sellers.

King Chris @KingChris10TH · 2026-07-02T10:18:46+00:00

Now that's a session I'd happily be part of If you haven't heard of @MineBitHQ yet, it's a crypto casino with instant rakeback, fast payouts, and rewards from your very first bet. #Minebit #bitcoin [Spoken audio]: Bien, otra vez.

Bitcoin.com News @BitcoinNews · 2026-07-02T12:32:02+00:00

Bitcoin Traders Brace for $62K Test After Rebound From $57,735 Low

Trending Bitcoin @TrendingBitcoin · 2026-07-02T16:03:00+00:00

Treasury Secretary Scott Bessent says he is looking "forward to the Clarity Act being passed this summer"

A portrait of an older gentleman with gray hair, glasses, and a blue tie in a suit, standing outdoors.

AI visual analysis: A portrait of an older gentleman with gray hair, glasses, and a blue tie in a suit, standing outdoors.

Oktay Teknik Analiz @cizimsiz77 · 2026-07-02T09:38:58+00:00

If BTC passes 61200, the move begins

A BTC/USD candlestick chart displaying a symmetrical triangle consolidation pattern, with converging red trendlines indicating tightening price action beneath a key resistance level near $61,200, supporting the post's anticipation of a breakout.

AI visual analysis: A BTC/USD candlestick chart displaying a symmetrical triangle consolidation pattern, with converging red trendlines indicating tightening price action beneath a key resistance level near $61,200, supporting the post's anticipation of a breakout.

Simply Bitcoin @SimplyBitcoin · 2026-07-02T16:31:58+00:00

Samson Mow: "It's not going to be a gradual slow increase to $1 million. It's going to be a very short and violent upheaval that sends us there in weeks to months." Bitcoin is at $62,000. He is either very wrong or very early.

A professional headshot of a smiling man wearing glasses and a black jacket over a t-shirt.

AI visual analysis: A professional headshot of a smiling man wearing glasses and a black jacket over a t-shirt.

Matthew Hyland @MatthewHyland_ · 2026-07-02T19:39:42+00:00

So many #Altcoins paired against BTC have been flat since Q4 2025 during most of the downtrend Many of these Alts that look like the Wall Street Cheat Sheet against BTC would produce a 10x-50x on a recovery The risk-reward on this setup is too good personally, so I am buying

A candlestick price chart displays a downtrend highlighted in an orange "October 10 >" annotation box, overlaid with the "Psychology of a Market Cycle" Wall Street Cheat Sheet diagram showing emotional market phases from optimism to disbelief to hope, illustrating how altcoins paired against BTC could yield 10x-50x returns during a recovery.

AI visual analysis: A candlestick price chart displays a downtrend highlighted in an orange "October 10 >" annotation box, overlaid with the "Psychology of a Market Cycle" Wall Street Cheat Sheet diagram showing emotional market phases from optimism to disbelief to hope, illustrating how altcoins paired against BTC could yield 10x-50x returns during a recovery.

Adam Livingston @AdamBLiv · 2026-07-02T14:26:52+00:00

The MSTR bear thesis now requires every possible funding source to be fatal. Common equity? Ponzi. Preferred equity? Dilution. Bitcoin sale? Death spiral. USD reserve? Fatal error. Debt retirement? Desperation. Victory is inevitable.

A stock price display on black background showing MSTR Price at $100.68, with a gain of +$7.29 (7.81%) shown in green text.

AI visual analysis: A stock price display on black background showing MSTR Price at $100.68, with a gain of +$7.29 (7.81%) shown in green text.

Bitcoin Magazine @BitcoinMagazine · 2026-07-02T20:39:00+00:00

JUST IN: $383 million Miller Value Parners tells CNBC that the fundamental case for Bitcoin "has never been stronger" “Bitcoin is a hedge against” an inflationary debt spiral

Scient @Crypto_Scient · 2026-07-02T21:48:16+00:00

$BTC , I wonder how many got chopped at the lows, positioning for a breakdown that "could" happen. It didn't. Trade idea is looking nice now — took a decent TP this evening. And whether price goes lower from here or not: a 4-5% trade on BTC is always a good trade. Eyeing

A Bitcoin/TetherUS daily chart on Binance shows BTC trading around $61,407, with a highlighted trade setup (green "TP" marker) on the right side near the $58,000-$68,000 range, illustrating the completed long entry and profit-take captured after the price failed to break down through the lows.

AI visual analysis: A Bitcoin/TetherUS daily chart on Binance shows BTC trading around $61,407, with a highlighted trade setup (green "TP" marker) on the right side near the $58,000-$68,000 range, illustrating the completed long entry and profit-take captured after the price failed to break down through the lows.

James Wynn @JamesWynnReal · 2026-07-02T16:33:53+00:00

I believe wholeheartedly the white bulls will have their chance. I’ll be at the forefront. It’s us vs. Them. 9E2Q4KKxLS5Y4bu6RKvjg5wQ2kzaLkiVsMt7zwMZpump Your choice.

Wilson @Wilsonpablo108 · 2026-07-02T10:24:34+00:00

Just when you think the session is over, the rakeback comes in and keeps things interesting @MinebitHQ #Minebit #cryptogaming #bitcoin